TFM10 NFPA 24 EXAM WITH COMPLETE SOLUTIONS 100%
VERIFIED!!!! ALREADY GRADED A+ LATEST UPDATE!!!
Combined Service Mains - (ANSWER)This standard shall apply to ______ intended to carry water for fire
service mains
AHJ - (ANSWER)Working plans shall be submitted for approval to the _____ before any equipment is
installed or remodeled.
Pressure-Regulating devices - (ANSWER)____ shall not be used
Control Valves - (ANSWER)______ shall not be installed in the piping from the fire department
connection to the fire service main
Control Valves - (ANSWER)_____ shall be permitted in the system downstream of the fire department
connection
Check Valve - (ANSWER)When more than one water supply exists, a ___________ shall be installed in
each connection
Control Valve - (ANSWER)All check valves shall have a ________ installed upstream and downstream of
the check valve.
40 ft - (ANSWER)A post indicator valve installed not less than____ from the building
32-40 inches - (ANSWER)Where post indicator valves are used, they shall be set so that the top of each
post is _______ above final grade
not be required - (ANSWER)Supervision of underground gate valves with roadway boxes shall
____________
not be less than 6 inches - (ANSWER)The connection from the hydrant to the main shall ___________
VERIFIED!!!! ALREADY GRADED A+ LATEST UPDATE!!!
Combined Service Mains - (ANSWER)This standard shall apply to ______ intended to carry water for fire
service mains
AHJ - (ANSWER)Working plans shall be submitted for approval to the _____ before any equipment is
installed or remodeled.
Pressure-Regulating devices - (ANSWER)____ shall not be used
Control Valves - (ANSWER)______ shall not be installed in the piping from the fire department
connection to the fire service main
Control Valves - (ANSWER)_____ shall be permitted in the system downstream of the fire department
connection
Check Valve - (ANSWER)When more than one water supply exists, a ___________ shall be installed in
each connection
Control Valve - (ANSWER)All check valves shall have a ________ installed upstream and downstream of
the check valve.
40 ft - (ANSWER)A post indicator valve installed not less than____ from the building
32-40 inches - (ANSWER)Where post indicator valves are used, they shall be set so that the top of each
post is _______ above final grade
not be required - (ANSWER)Supervision of underground gate valves with roadway boxes shall
____________
not be less than 6 inches - (ANSWER)The connection from the hydrant to the main shall ___________