Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 36 pages
Exam (elaborations)

DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Document preview thumbnail
Preview 4 out of 36 pages

DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+ DBIA Certification Exam Practice Test (New Update 2026/2027) Questions with 100% Correct Answers| Graded A+

Content preview

DBIA Certification Exam Practice Test
(New Update 2026/2027) Questions
with 100% Correct Answers| Graded A+
Question:

How is Design-Builder selected?
i,- i,- i,-




Answer:
Qualification-Based or best value i,- i,- i,-




Question:

similar to design build, in industrial and power generation sectors,
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


systems and performance testing are central to scope, contractor will
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


typically perform engineering with its in-house staff, owner has need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



single point responsibility, contracts include plant and process
i,- i,- i,- i,- i,- i,- i,- i,-


performance guarantees, contract items include performance and
i,- i,- i,- i,- i,- i,- i,-


schedule liquidated damages and limitations of liability?
i,- i,- i,- i,- i,- i,-




Answer:
Engineer Procure Construct i,- i,-




Question:
owner contracts with multiple trade contractors, attributes are typically
i,- i,- i,- i,- i,- i,- i,- i,- i,-


similar to DBB, owner's ability to schedule and coordinate the work?
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-

,Answer:
Multiple Prime Contracti,- i,-




Question:

multi-party agreement - all parties equal, QBS procurement and target
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


pricing contract approach, private sector use (limited at this time), key:
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



owner's ability to accept risk?
i,- i,- i,- i,-




Answer:
Integrated Project Delivery i,- i,-




Question:

instead of government building and maintaining major infrastructure
i,- i,- i,- i,- i,- i,- i,- i,-



(such as highway, water treatment plant), build and maintenance is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


outsourced to a private company. Opposed by public sector unions. this is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


not considered a delivery system but its underlying approaches are
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


delivery systems and typically use DB. multiple procurement and
i,- i,- i,- i,- i,- i,- i,- i,- i,-



contracting approaches? i,-




Answer:

Public-Private-Partnership




Question:

,Intense efforts to establish scope early in the process; drives early team
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


formation to include key trade subcontractors; can enable big decisions to
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


be made early, affect project outcomes at lower cost, establish a need for
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


location and collaboration, and compress times during concurrent design
i,- i,- i,- i,- i,- i,- i,- i,- i,-



and construction?
i,-




Answer:

shift left i,-




Question:

Typically two-phase best value procurement with lump sum contract;
i,- i,- i,- i,- i,- i,- i,- i,- i,-


owner defines project requirements and scope of prescriptive work; use of
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


performance-based technical requirements with limited perspective i,- i,- i,- i,- i,- i,-


specifications?

Answer:
traditional design build i,- i,-




Question:
design and procurement are progressively developed after the design-
i,- i,- i,- i,- i,- i,- i,- i,-


builder is under contract; final project cost and schedule commitment is
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



not established as part of the selection process; two phases; preliminary
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


services and final design and construction services?
i,- i,- i,- i,- i,- i,-




Answer:

Progressive design build i,- i,-

, Question:

What documents describe the end result?
i,- i,- i,- i,- i,-




Answer:

Criteria documents
i,-




Question:

Prescribes how to achieve the end result?
i,- i,- i,- i,- i,- i,-




Answer:
Bridging Documents i,-




Question:
Prior to bidding, owner undertakes a process to design the project and all
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


of its details to 100% complete plans and specs. The owner is therefore
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


responsible for success or failure of details of the design, and warrants the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


sufficiency of design to the contractor. The owner is therefore liable to the
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-



contractor for any gaps between plans and specs and owner's
i,- i,- i,- i,- i,- i,- i,- i,- i,- i,-


requirements for project performance? i,- i,- i,-




Answer:
Design bid build paradigm
i,- i,- i,-

Document information

Uploaded on
September 2, 2026
Number of pages
36
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AcademiaExpert
3.8
(517)
Sold
2008
Followers
767
Items
4537
Last sold
18 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions