Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 68 pages
Exam (elaborations)

Lean Six Sigma Green Belt Exam Practice Questions And Correct Answers (Verified Answers)

Document preview thumbnail
Preview 4 out of 68 pages

This document contains practice exam questions and correct answers for the Lean Six Sigma Green Belt certification. It covers key topics and concepts relevant to the Green Belt level, providing a resource for students to test their knowledge and prepare for the certification exam.

Content preview

LEAN SIX SIGMA GREEN BELT EXAM PRACTICE QUESTIONS AND
CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALE
Q&A INSTANT DOWNLOAD PDF.
130 QUESTIONS




TABLE OF CONTENTS

# TOPIC

1 Apply DMAIC phases to complex process improvement scenarios

2 Select and interpret appropriate statistical tools for process analysis

3 Evaluate measurement system capability and process performance

4 Integrate lean principles with Six Sigma methodologies for waste reduction

5 Lean Six Sigma Green Belt Exam Practice Questions And Correct Answers

6 Verified Answers

7 Plus Rationale Q&A Instant Download Pdf.

8 Foundations of Lean Six Sigma Green Belt

9 Applied Lean Six Sigma Green Belt

10 Advanced Lean Six Sigma Green Belt

11 Lean Six Sigma Green Belt Review




Page 1

,Q1 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
In a manufacturing process, a control chart for individual measurements (I-MR) is
used. The moving range (MR) chart shows a point above the upper control limit.
Which interpretation is most appropriate?
A. The process mean has shifted, requiring recalculation of control limits.

B. The process is out of control, but the mean may still be stable. CORRECT

C. The process is out of control, and the mean has shifted.

D. The process is in control; the point is a false alarm.

RATIONALE: A point above the UCL on the MR chart indicates an increase in short-term
variation, not necessarily a mean shift. The mean may be stable; investigation is needed. Option
A is incorrect because limits are not recalculated without a special cause. Option C overstates,
and D is a false assumption.




Q2 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
A Green Belt is analyzing a process with a Cpk of 0.8 and a Cp of 1.5. Which
conclusion is most defensible?
A. The process is centered, but variation is too high.

B. The process is off-center, and variation is also excessive.

C. The process is off-center, but variation is acceptable relative to specifications. CORRECT

D. The process is centered, and variation is acceptable.

RATIONALE: Cp > 1.0 indicates potential capability if centered, but Cpk < 1.0 indicates the
process is off-center. Since Cp is high, variation is not excessive; the issue is centering. Thus, C
is correct.




Page 2

,Q3 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
In a regression analysis, the residuals show a funnel-shaped pattern when plotted
against fitted values. Which assumption is violated?
A. Linearity

B. Independence

C. Constant variance (homoscedasticity) CORRECT

D. Normality of residuals

RATIONALE: A funnel pattern indicates that the variance of residuals changes with the level of
the fitted values, violating homoscedasticity. Linearity and independence are not directly
indicated; normality is assessed via histograms or normal probability plots.




Q4 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
A process improvement team uses a 2^k factorial design with 3 factors and 2
center points. The total number of runs is 10. Which statement about the design is
correct?
A. The design is saturated; no degrees of freedom remain for error estimation.

B. The design has 3 degrees of freedom for pure error from the center points. CORRECT

C. The design cannot estimate interactions because of the center points.

D. The design has 5 degrees of freedom for error, including center points and replication.

RATIONALE: The 2^3 factorial has 8 runs plus 2 center points = 10 runs. Center points provide
an estimate of pure error with 1 degree of freedom (2 points - 1). The factorial runs are not
replicated, so no pure error from them. Thus, B is correct; A is false because there is some error
estimate; C is false because center points do not affect interaction estimation; D is incorrect
because only 1 df for pure error.




Page 3

, Q5 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
A measurement system analysis (MSA) yields a %GRR of 12%. Which action is
most appropriate?
A. The measurement system is acceptable for process improvement but not for release
decisions. CORRECT

B. The measurement system is not acceptable; immediate recalibration is required.

C. The measurement system is acceptable for all applications.

D. The measurement system is borderline; further investigation is needed before acceptance.

RATIONALE: According to AIAG guidelines, %GRR < 10% is generally acceptable; 10-30% is
conditionally acceptable depending on application; >30% is unacceptable. 12% is in the
conditional range, so it may be acceptable for improvement but not for release. Thus, A is
correct.




Q6 APPLY DMAIC PHASES TO COMPLEX PROCESS IMPROVEMENT SCENARIOS
A process has a sigma level of 4.5 (with 1.5 sigma shift). What is the approximate
defects per million opportunities (DPMO)?
A. 3.4

B. 233

C. 1350 CORRECT

D. 6210

RATIONALE: A 4.5 sigma level (with shift) corresponds to approximately 3.4 DPMO for 6 sigma,
but for 4.5 sigma it is about 1350 DPMO. This is a standard conversion from the sigma table.




Page 4

Document information

Uploaded on
September 2, 2026
Number of pages
68
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$28.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
193
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions