BOARD (CAMICB)
CMCA Practice Exam
Comprehensive Practice Questions with Detailed Rationales
Certified Manager of Community Associations — 64 Practice Questions
Edition 1 · July 2026 · 64 Practice Questions
✓ Institution Verified: Community Association Managers International Certification Board (CAMICB) — CMCA
Certification Examination
Table of Contents
1. Instructions for Use 2
2. Practice Questions with Answers & Rationales 2
,CMCA · CAMICB Page 1
,CMCA PRACTICE EXAM INSTRUCTIONS & PRACTICE QUESTIONS
How to Use This Guide
Read each stem, choose your answer, then check the rationale directly below it. The correct
option is marked, and each wrong option is explained so you understand why it's wrong — not
just that it is. This guide contains 64 practice questions covering key content areas for the
CMCA (Certified Manager of Community Associations) Certification Examination.
Category: Comprehensive CMCA Exam Review
1 Preparing a bid request includes which of the following?
A Verifying References.
B Identifying potential contractors.
C Recommending a contractor to the board.
D Verifying contractor insurance.
Why B is correct: Preparing a bid request involves identifying potential contractors who will
be invited to submit bids for a project. This is the initial step in the bidding process.
Verifying references and insurance occurs during the evaluation process, not during the
preparation of the bid request itself. Recommending a contractor to the board occurs after
bids have been received and evaluated.
A — Verifying references occurs during contractor evaluation, not bid preparation.
C — Recommending a contractor occurs after bids are received and evaluated.
D — Verifying insurance occurs during contractor evaluation, not bid preparation.
, 2 Legal review prior to executing a contract will assist the association in the event that:
A A subcontractor is used.
B A performance bond is required.
C There is a budgetary shortfall.
D The board has questions or concerns.
Why D is correct: Legal review prior to executing a contract ensures that the board has a
clear understanding of the contract terms and can address any questions or concerns
before signing. This proactive approach helps prevent disputes and misunderstandings.
While subcontractors, performance bonds, and budgetary issues may be addressed in
contracts, legal review primarily serves to clarify and protect the association's interests.
A — Subcontractor issues are typically addressed in contract terms, not legal review
specifically.
B — Performance bonds are contract requirements, not the primary purpose of legal review.
C — Budgetary shortfalls are financial management issues, not legal review concerns.
3 Rather than describing the scope of work in detail in the contract, a manager may:
A Attach the bid specifications.
B Call each contractor to describe the job.
C Be on-site to oversee project content.
D Suggest the board meet the contractor to talk about the scope of work.
Why A is correct: Instead of including the full scope of work within the contract itself, a
manager may attach the bid specifications as a separate document. This keeps the contract
concise while ensuring all technical details are included. Calling contractors, on-site
oversight, or board meetings are not substitutes for written specifications in the contract.
B — Calling each contractor does not provide written documentation of the scope.
C — On-site oversight addresses implementation, not contract specifications.
D — Board meetings do not replace written specifications in the contract.