• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

EVITP Exam Questions and Answers Verified Solutions Latest Update 2

Document preview thumbnail
Preview 3 out of 20 pages

EVITP Exam Questions and Answers Verified Solutions Latest Update 2

Content preview

EVITP Exam Questions and Answers
Verified Solutions Latest Update


Question:

Installation of EVSE at an existing building

Answer:
is worth as many as 15 LEED points.


Question:

Installing electric vehicle charging equipment

Answer:
may improve public perception of a business.


Question:

When a business installs charging equipment

Answer:
the public may sense that the business supports sustainability.


Question:

Determining the appropriate location for EVSE

Answer:
requires the person planning the installation to consider all of the above.


Question:

Proper location of EVSE

Answer:
may include consideration of ADA guidelines depending on location.

,Question:

Jurisdictional codes and requirements

Answer:
should always be checked when determining the location and other features of the
EVSE.


Question:

Bollards, curbs, and wheel stops

Answer:
can protect charging equipment from physical damage from vehicles.


Question:

Adequate site lighting

Answer:
increases the safety of an EVSE location.


Question:

Trailblazing signs

Answer:
are for directing drivers to the location of EV charging equipment.


Question:

According to the ADA guidelines

Answer:
4% of general parking spaces should be accessible.


Question:

ADA parking space guidelines

Answer:
can be used as a guide when determining the number of EV charging spaces that
should be made accessible.

, Question:

ADA guidelines

Answer:
are useful when planning an EVSE installation because all of the above.


Question:

Operable parts of accessible equipment

Answer:
should be located 15"-48" above finish grade per ADA guidelines.


Question:

The maximum depth of a barrier

Answer:
such as a curb or housekeeping pad, in front of accessible equipment is 10".


Question:

DC fast chargers

Answer:
pose accessibility challenges because their cables and connectors are larger and
heavier than standard Level 1 and Level 2 EVSE.


Question:

Benefits of commissioning the installation of electric vehicle supply equipment (EVSE)

Answer:
include all of the above.


Question:

commissioning

Answer:
is the process that ensures mechanical, electrical, and other building systems are
installed, tested, and perform interactively in accordance with design documents.

Document information

Uploaded on
September 1, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
SirViktor
5.0
(3)
Sold
4
Followers
1
Items
2353
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions