The./provisions./of./this./manual./implement./and./supplement./the./safety./and./
health./standards./and./requirements./contained./in./29./CFR./1910,./29./CFR./19
26,./29./CFR./1960,./EO./12196,./FAR./Clause./52.236.13,./DODI./6055.1,./AR./
40-5,./and./AR./385-
10../Where./more./stringent./safety./and./occupational./health./standards./are./se
t./forth./in./these./requirements./and./regulations,./________../-
./correct./answer./The./more./stringent./standards./shall./apply
__________./personnel-./as./part./of./their./quality./control./responsibilities-
./shall./conduct./and./document./________./in./their./daily./QC./logs../-
./correct./answer./Contractor./quality./control./;./Daily./safety./and./occupational
./health./inspections
Before./beginning./each./work./activity./involving./a./type./of./work./presenting./
hazards./not./experienced./in./previous./project./operations./or./where./a./new./w
ork./crew./or./subcontractor./is./to./perform./the./work,./the./contractors./perform
ing./that./work./activity./shall./prepare./-./correct./answer./An./AHA
AHA./stands./for./-./correct./answer./Activity./Hazard./Analysis
Work./shall./not./begin./until./the./______./for./the./work./activity./has./been./acce
pted./by./the./________./and./discussed./with./all./engaged./in./the./activity,./incl
uding./the./contractor,./subcontractor,./and./government./on-
, site./representatives./at./preparatory./and./initial./phase./control./meetings./-
./correct./answer./AHA./;./GDA
______./shall./be./provided./with./safety./and./health./indoctrination./________
_./as./well./as./continuous./safety./and./health./training./to./enable./them./to./work./
in./a./safe./manner../-./correct./answer./Employees./;./prior./to./start./of./work
The./______./is./responsible./for./obtaining./appropriate./_______./and./emerge
ncy./assistance./and./for./notifying./fire,./law./enforcement,./and./regulatory./ag
encies../-./correct./answer./Contractor./;./medical
A./_______./delineating./the./best./route./to./the./nearest./medical./facility./shall./
be./prepared./and./posted./on./the./safety./_______./board./-
./correct./answer./Highly./visible./board./;./bulletin
The./contents./of./______./shall./be./checked./by./the./employer./_____./to./their./
use./on./site./and./at./least./every./______./months./when./work./is./in./progress./to./
ensure./that./they./are./complete,./in./good./condition./and./have./not./expired./-
./correct./answer./First./aid./kits./;./prior./;./3./months
The./______./beam./shall./not./be./directed./at./employees./:./whenever./possible
,./laser./units./in./operation./shall./be./set./______./the./heads./of./employees./-
./correct./answer./Laser./;./above