RAC DRUGS ACTUAL EXAM QUESTIONS
AND CORRECT ANSWERS COMPLETE
STUDY GUIDE
●● Accept
Answer: The act of formally receiving or acknowledging something and
regarding it as being true, sound, suitable, or complete.
●● Activity
Answer: A distinct, scheduled portion of work performed during the
course of a project.
●● Activity Code
Answer: An alphanumeric value assigned to each activity that enables
classifying, sorting, and filtering.
●● Activity Identifier
Answer: A unique alphanumeric value assigned to an activity and used
to differentiate that activity from other activities.
●● Activity Label
Answer: A phrase that names and describes an activity. See also activity
code and activity identifier.
,●● Actual Cost (AC)
Answer: The realized cost incurred for the work performed on an
activity during a specific time period.
●● Analogous Estimating
Answer: A technique for estimating the duration or cost of an activity or
a project using historical data from a similar activity or project.
●● Apportioned Effort
Answer: An activity where effort is allotted proportionately across
certain discrete efforts and not divisible into discrete efforts.
●● Assumption
Answer: A factor in the planning process considered to be true, real, or
certain, without proof or demonstration.
●● Backward Pass
Answer: A critical path method technique for calculating the late start
and late finish dates by working backward through the schedule model
from the project end date.
●● Baseline
,Answer: The approved version of a work product that can be changed
using formal change control procedures and is used as the basis for
comparison to actual results
●● Bottom‐Up Estimating
Answer: A method of estimating project duration or cost by aggregating
the estimates of the lower‐level components of the work breakdown
structure (WBS).
●● Budget at Completion (BAC)
Answer: The sum of all budgets established for the work to be
performed.
●● Change Control
Answer: A process whereby modifications to documents, deliverables, or
baselines associated with the project are identified, documented,
approved, or rejected
●● Change Control Board
Answer: A formally chartered group responsible for reviewing,
evaluating, approving, delaying, or rejecting changes to the project, and
for recording and communicating such decisions.
●● Change Control System
, Answer: A set of procedures that describes how modifications to the
project deliverables and documentation are managed and controlled
●● Change Request
Answer: A formal proposal to modify any document, deliverable, or
baseline.
●● Code of Accounts
Answer: A numbering system used to uniquely identify each component
of the work breakdown structure(WBS).
●● Communications Management Plan.
Answer: A component of the project, program, or portfolio management
plan that describes how, when, and by whom information will be
administered and disseminated.
●● Configuration Management System
Answer: A collection of procedures used to track project artifacts and
monitor and control changes to these artifacts.
●● Constraint
Answer: A limiting factor that affects the execution of a project,
program, portfolio, or process
AND CORRECT ANSWERS COMPLETE
STUDY GUIDE
●● Accept
Answer: The act of formally receiving or acknowledging something and
regarding it as being true, sound, suitable, or complete.
●● Activity
Answer: A distinct, scheduled portion of work performed during the
course of a project.
●● Activity Code
Answer: An alphanumeric value assigned to each activity that enables
classifying, sorting, and filtering.
●● Activity Identifier
Answer: A unique alphanumeric value assigned to an activity and used
to differentiate that activity from other activities.
●● Activity Label
Answer: A phrase that names and describes an activity. See also activity
code and activity identifier.
,●● Actual Cost (AC)
Answer: The realized cost incurred for the work performed on an
activity during a specific time period.
●● Analogous Estimating
Answer: A technique for estimating the duration or cost of an activity or
a project using historical data from a similar activity or project.
●● Apportioned Effort
Answer: An activity where effort is allotted proportionately across
certain discrete efforts and not divisible into discrete efforts.
●● Assumption
Answer: A factor in the planning process considered to be true, real, or
certain, without proof or demonstration.
●● Backward Pass
Answer: A critical path method technique for calculating the late start
and late finish dates by working backward through the schedule model
from the project end date.
●● Baseline
,Answer: The approved version of a work product that can be changed
using formal change control procedures and is used as the basis for
comparison to actual results
●● Bottom‐Up Estimating
Answer: A method of estimating project duration or cost by aggregating
the estimates of the lower‐level components of the work breakdown
structure (WBS).
●● Budget at Completion (BAC)
Answer: The sum of all budgets established for the work to be
performed.
●● Change Control
Answer: A process whereby modifications to documents, deliverables, or
baselines associated with the project are identified, documented,
approved, or rejected
●● Change Control Board
Answer: A formally chartered group responsible for reviewing,
evaluating, approving, delaying, or rejecting changes to the project, and
for recording and communicating such decisions.
●● Change Control System
, Answer: A set of procedures that describes how modifications to the
project deliverables and documentation are managed and controlled
●● Change Request
Answer: A formal proposal to modify any document, deliverable, or
baseline.
●● Code of Accounts
Answer: A numbering system used to uniquely identify each component
of the work breakdown structure(WBS).
●● Communications Management Plan.
Answer: A component of the project, program, or portfolio management
plan that describes how, when, and by whom information will be
administered and disseminated.
●● Configuration Management System
Answer: A collection of procedures used to track project artifacts and
monitor and control changes to these artifacts.
●● Constraint
Answer: A limiting factor that affects the execution of a project,
program, portfolio, or process