This ACI Concrete Field Testing Technician Grade I 2026/2027 exam study guide contains approximately 83 questions with correct answers covering the essential procedures, measurements, calculations and field practices involved in testing freshly mixed concrete. The document provides concentrated exam preparation across concrete temperature measurement, representative sampling, slump testing, density and yield calculations, pressure and volumetric air-content testing, cylinder fabrication, consolidation, initial curing and final curing. No university name or separate university course code is identified in the uploaded material, so American Concrete Institute (ACI) is used as the relevant professional institution rather than assigning an unsupported university affiliation.
The opening sections focus on fresh concrete temperature and sampling procedures. Questions address temperature-measuring-device accuracy and verification, required concrete cover around the sensor, measurement duration and reporting precision. Sampling material includes adding water and admixtures before sampling, obtaining representative portions from revolving truck and paving mixers, controlling discharge, composite samples, minimum sample quantities, remixing, wet sieving and the time limits for beginning temperature, slump, air-content and strength-specimen procedures.
A substantial portion covers the concrete slump test, including applicability to plastic and cohesive concrete, slump-mold geometry, preparation of the base, three-layer filling, 25 rodding strokes per layer, penetration into previous layers, strike-off technique, mold removal and measurement of slump. The document also explains what to do when a shear slump occurs and emphasizes the timing requirements for completing the procedure.
The density, unit weight and yield section combines procedural knowledge with calculations. Students review selection of the measuring container, strike-off plate requirements, consolidation by rodding or vibration according to slump, determination of concrete density from mass and measure volume, calculation of yield from batch mass and density, relative yield and calculation of air content using theoretical and actual density.
Detailed preparation is also provided for air-content testing by pressure and volumetric methods. Pressure-meter material includes acceptable aggregate characteristics, filling and rodding procedures, mallet tapping, vibration and safe pressure release. The volumetric or Roll-a-Meter section covers applicability to different aggregate types, preparation of the bowl, water and alcohol addition, agitation and rolling, stabilization, foam limits, calibrated cups, meniscus readings and examination of the concrete after testing.
The final section addresses concrete test-cylinder fabrication and curing. It covers 6 × 12-inch cylinder preparation, three-layer placement, rodding, tapping, specimen identification, movement to initial storage, transportation after final set, initial curing temperatures and final curing conditions. The document concludes with a useful comparison of maximum aggregate and wet-sieving requirements for slump, pressure-meter and Roll-a-Meter procedures.
The content is consistent with the principal testing areas associated with ACI Concrete Field Testing Technician—Grade I preparation. A suitable authoritative companion reference is the American Concrete Institute's CP-1: Technician Workbook for Concrete Field Testing Technician—Grade I, which covers the ASTM test methods used in the certification program, including ASTM C1064/C1064M, C172/C172M, C143/C143M, C138/C138M, C231/C231M, C173/C173M and C31/C31M. ACI Concrete Field Testing Technician—Grade I program
APA Reference:
American Concrete Institute. (2025). CP-1: Technician workbook for Concrete Field Testing Technician—Grade I (41st ed.). American Concrete Institute. ACI CP-1 Technician Workbook
Relevant Students:
This study document is relevant for ACI Concrete Field Testing Technician—Grade I candidates, civil engineering students, construction engineering students, construction management students, concrete technology students, materials engineering students, construction materials testing students, concrete laboratory technicians, field technicians, concrete inspectors and quality-control personnel preparing to perform or understand standardized fresh-concrete field tests.
Keywords: ACI Concrete Field Testing Technician Grade I, ACI concrete exam , ACI Grade 1 questions and answers, ACI certification practice test, concrete field testing exam, ASTM C1064, ASTM C172, ASTM C143, ASTM C138, ASTM C231, ASTM C173, ASTM C31, concrete temperature testing, fresh concrete sampling, concrete slump test, concrete density test, concrete unit weight, concrete yield calculation, relative yield, concrete air content, pressure air meter, Roll-a-Meter, volumetric air content test, concrete test cylinders, concrete specimen curing, concrete consolidation, wet sieving concrete, fresh concrete testing, ACI exam preparation, civil engineering concrete testing, construction materials testing
Content preview
ACI Concrete 2026/2027 Exam
Questions and Correct
Answers | New Update
The temperature measuring device shall have an accuracy of _____
throughout a range of __ to ___ - ANSWER ✔✔+/- 1F Degree; 30F to
120F
Place the thermometer in a sample with a minimum of _____ cover. -
ANSWER ✔✔3 inches
Leave the thermometer in for a minimum of ____ and a maximum of
_____. - ANSWER ✔✔2 minutes; 5 minutes
, Read and record to the temperature to the nearest _____ - ANSWER
✔✔1 degree F
Do not remove the TMD from the concrete when reading the
temperature. T/F - ANSWER ✔✔True
Temperature measuring device shall be verified ______, or _________. -
ANSWER ✔✔Annually; whenever there is a question of accuracy
Before sampling concrete, make sure all _____ and _____ are added -
ANSWER ✔✔Water; Admixtures
Regulate the rate of discharge of the concrete by the _____ and not the
size of the _____. - ANSWER ✔✔rate of revolution of the drum; gate
opening
When sampling from revolving truck mixer, sample the concrete at least
_____ regularly spaced intervals from the _____ (not exceeding _____
minutes). - ANSWER ✔✔two; middle of the load; 15 minutes
Obtain the sample by repeatedly pass a receptacle through the _____ or
completely divert the _____ into the sample container. - ANSWER
✔✔entire discharge stream; discharge stream