●● Any construction or demolition activity, including, but not limited to,
clearing, grading, grubbing, or excavation, or any other activity that
results in a land DISTURBANCE of equal to or greater than ___ acre
Answer: 1
●● LUPs
Answer: Linear Underground/Overhead Utility Projects
●● What is the primary federal law governing storm water pollution and
regulation
Answer: Clean Water Act
●● The person in charge of the utility company, municipality, or other
public or private company or agency that owns or operates the ____ may
also serve as the LRP
Answer: LUP
●● Visual Monitoring is required for...
Answer: All sites subject to this General Permit
,●● Records are required to remain onsite during the construction period
for a minimum of ___
Answer: 3 Years
●● When does Risk Level 1 site have to sample?
Answer: When required for non-visible pollutants
●● When would receiving water monitoring occur?
Answer: Effluent that exceeds the receiving water monitoring triggers
contained in the GP and with direct discharges to receiving water
●● When would bioassessment sampling take place?
Answer: RISK level 3 and LUP Type 3 Sites larger than 30 acres and
with direct discharges to receiving waters. (before and after sire
completion)
●● Where do records need to be available?
Answer: At the construction site until construction is complete. LUPs
may be retained in a crew members vehicle and made available upon
request
●● ATS
Answer: Active Treatment Systems
, ●● What do ATS do?
Answer: Add chemicals to facilitate flocculation, coagulation and
filtration of suspended sediment particles. Measured by NELs
●● When does risk level 1 site have to sample
Answer: When required for non-visible pollutants
●● Which construction activity is not covered under the CGP
Answer: Routine maintenance to maintain original line and grade,
hydraulic capacity, or original purpose of the facility
●● When is the primary federal law governing storm water pollution and
regulation?
Answer: Clean Water Act
●● The LRP's (Legally Responsible Person) approved signatory must
be:
Answer: Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military
QUESTIONS AND SOLUTIONS FULLY
VERIFIED
●● Any construction or demolition activity, including, but not limited to,
clearing, grading, grubbing, or excavation, or any other activity that
results in a land DISTURBANCE of equal to or greater than ___ acre
Answer: 1
●● LUPs
Answer: Linear Underground/Overhead Utility Projects
●● What is the primary federal law governing storm water pollution and
regulation
Answer: Clean Water Act
●● The person in charge of the utility company, municipality, or other
public or private company or agency that owns or operates the ____ may
also serve as the LRP
Answer: LUP
●● Visual Monitoring is required for...
Answer: All sites subject to this General Permit
,●● Records are required to remain onsite during the construction period
for a minimum of ___
Answer: 3 Years
●● When does Risk Level 1 site have to sample?
Answer: When required for non-visible pollutants
●● When would receiving water monitoring occur?
Answer: Effluent that exceeds the receiving water monitoring triggers
contained in the GP and with direct discharges to receiving water
●● When would bioassessment sampling take place?
Answer: RISK level 3 and LUP Type 3 Sites larger than 30 acres and
with direct discharges to receiving waters. (before and after sire
completion)
●● Where do records need to be available?
Answer: At the construction site until construction is complete. LUPs
may be retained in a crew members vehicle and made available upon
request
●● ATS
Answer: Active Treatment Systems
, ●● What do ATS do?
Answer: Add chemicals to facilitate flocculation, coagulation and
filtration of suspended sediment particles. Measured by NELs
●● When does risk level 1 site have to sample
Answer: When required for non-visible pollutants
●● Which construction activity is not covered under the CGP
Answer: Routine maintenance to maintain original line and grade,
hydraulic capacity, or original purpose of the facility
●● When is the primary federal law governing storm water pollution and
regulation?
Answer: Clean Water Act
●● The LRP's (Legally Responsible Person) approved signatory must
be:
Answer: Corporation - A responsible corporate officer
Partnership/sole proprietorship - general partner/proprietor
Municipality/State/federal/public agency
Military