Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

QSP EXAMINATION TEST 2026 QUESTIONS AND SOLUTIONS GRADED A+

Document preview thumbnail
Preview 3 out of 17 pages

QSP EXAMINATION TEST 2026 QUESTIONS AND SOLUTIONS GRADED A+

Content preview

QSP EXAMINATION TEST 2026 QUESTIONS
AND SOLUTIONS GRADED A+


◉During a routine inspection a LUP discharger observes a non-
storm water discharge and therefore must prepare a non-storm
water report. Answer: ?


◉if required, when should Risk Level 1 sites conduct discharge
sampling. Answer: During business hours


◉Regional Water boards are responsible for____. Answer:
Implementation and enforcement of the General Permit. Have some
flexibility and authority to alter, approve, exempt, or rescind permit.


◉LRP. Answer: Legally Responsible Person


◉What does the LRP do?. Answer: Obtain coverage by electrinically
filing Permit Registration Documents (PRDs) prior to construction


◉PDRs Consist of. Answer: Notice of Intent (NOI)
Risk Assessment
Site Map

,SWPPP
Annual Fee
Signed Certification Statement


◉Small Construction Rainfall Erosivity Waiver. Answer: Applies to
sites between 1 - 5 acres demonstrating that thee are not adverse
water quality impacts


◉Discharges eligible for Rainfall Erosivity Waiver must take place
during a period when the value is the rainfall erosivity factor is less
than___. Answer: 5


◉If the new R factor is 5 or above. Answer: The LRP shall be
required to apply for coverage under this order.


◉The discharger may reduce or increase the total acreage covered
under the GP when.... Answer: A portion of the site is complete
and/or conditions for termination have been met (when ownership
of a portion of the site is sold to different entity or when new
acreage is added to the site)


◉Revisions to add/reduce disturbed acreage must be filed
electronically within ____. Answer: 30 Days

, ◉Which of the following construction activities is not covered under
the CGP:. Answer: Routine maintenance to maintain original line and
grade, hydraulic capacity, or original purpose of the facility


◉Conditions for Termination of Coverage. Answer: Within 90 Days
when construction is complete or ownership transferred File
through SMARTS
1. File NOT
2. Final Site Map
3. Photos


◉The NOT must demonstrate through.... Answer: A. 70% final cover
method


B. RUSLE or RUSLE2 method - computational proof required


C. Custom Method - Demonstrate in some other manner than A or B
that the site complies with final stabilization


◉Authorized non-storm water discharges may include those
from____. Answer: Dechlorinated potable water sources such as:
Fire Hydrant Flushing, Irrigation of Veg Erosion Control Measures,
Pipe Flushing/Testing, Dust Control, Uncontaminated ground water
from dewatering

Document information

Uploaded on
August 30, 2026
Number of pages
17
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
150
Followers
2
Items
52952
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions