CQM C SET ALL ANSWERS AND QUESTIONS SURE A+
✔✔What information must the contractor provide in their submittal control document
(ENG Form 4288R - Submittal Register)? - ✔✔
✔✔What is the primary function of QA? - ✔✔
✔✔What is the role of QA personnel? - ✔✔
✔✔What is the primary function of CQC? - ✔✔
✔✔What are the roles of QC personnel? - ✔✔
✔✔For design-build contracts what additional requirements must be included in the QC
plan? - ✔✔
✔✔What is the primary purpose of the three-phase control system? - ✔✔
✔✔Regarding the three-phase control system, what are the responsibilities of quality
control personnel? - ✔✔
✔✔How often are Quality Control and Quality Assurance Reports required? - ✔✔
✔✔Define QC testing. - ✔✔
✔✔Define QA testing. - ✔✔
✔✔Who performs QC tests? - ✔✔
✔✔Who performs QA tests? - ✔✔
✔✔What questions should be answered before testing begins? - ✔✔
✔✔What information must the contractor provide in their submittal control document
(ENG Form 4288R - Submittal Register)? - ✔✔
✔✔What is the primary function of QA? - ✔✔
✔✔What is the role of QA personnel? - ✔✔
✔✔What is the primary function of CQC? - ✔✔
✔✔What are the roles of QC personnel? - ✔✔
✔✔For design-build contracts what additional requirements must be included in the QC
plan? - ✔✔
✔✔What is the primary purpose of the three-phase control system? - ✔✔
✔✔Regarding the three-phase control system, what are the responsibilities of quality
control personnel? - ✔✔
✔✔How often are Quality Control and Quality Assurance Reports required? - ✔✔
✔✔Define QC testing. - ✔✔
✔✔Define QA testing. - ✔✔
✔✔Who performs QC tests? - ✔✔
✔✔Who performs QA tests? - ✔✔
✔✔What questions should be answered before testing begins? - ✔✔