The lean ratio of an extension ladder - ANSWER-4:1
According to AHERA, to complete a response action of a non-
NESHAP size project, how many samples must be taken with
results of what? - ANSWER-5 samples taken inside with results
of each <0.0 f/cc
What are the notification requirements in Virginia? - ANSWER-
20 calendar days for any project greater than 10 sq feet or
linear feet
In what jurisdiction do individuals need an asbestos supervisor
or working linsense - ANSWER-Need a license everywhere
Type of bond that would ensure that the general contractor will
compensate subcontractors for labor and materials - ANSWER-
Performance Bond
,2 | Page
Minimum respiratory protection on a class 1 asbestos project
with no NEA - ANSWER-Full face air purifying respirator
What is the maximum content permitted in the work area where
an air purifying respirator is being worn? - ANSWER-23.5%
Chest XRays must be evaluated by what class reader? -
ANSWER-Class B
What is the APF for a full face air purifying respirator -
ANSWER-50
Friable ACM is any material that can be: - ANSWER-Crushed,
pulverized, reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is - ANSWER-0.1 f/cc
over 8 hours TWA
, 3 | Page
According to ASHERA, how many air samples must be taken
for final clearance for NESHAP size project? - ANSWER-13
samples (5 inside, 5 outside, 2 fields blanks , one sealed
blank)TEM
Laboratories that perform PLM and TEM must be accredited by
- ANSWER-National Voluntary Laboratory Accreditation
Program
AHERA is for - ANSWER-Public schools K-12
What is the notification requirement for asbestos projects in DC
- ANSWER-10 working days prior to start NESHAP size
projects and any project over 18 square feet of flooring.
Building owner to notify tenants no less than 30 days prior to
start of the project in writing
What is a NESHAP sized project - ANSWER-160 square feet,
260 linear feet, or 35 cubic feet
MARYLAND ASBESTOS EXAM
2026 ACTUAL QUESTIONS WITH
VERIFIED ANSWERS.
The lean ratio of an extension ladder - ANSWER-4:1
According to AHERA, to complete a response action of a non-
NESHAP size project, how many samples must be taken with
results of what? - ANSWER-5 samples taken inside with results
of each <0.0 f/cc
What are the notification requirements in Virginia? - ANSWER-
20 calendar days for any project greater than 10 sq feet or
linear feet
In what jurisdiction do individuals need an asbestos supervisor
or working linsense - ANSWER-Need a license everywhere
Type of bond that would ensure that the general contractor will
compensate subcontractors for labor and materials - ANSWER-
Performance Bond
,2 | Page
Minimum respiratory protection on a class 1 asbestos project
with no NEA - ANSWER-Full face air purifying respirator
What is the maximum content permitted in the work area where
an air purifying respirator is being worn? - ANSWER-23.5%
Chest XRays must be evaluated by what class reader? -
ANSWER-Class B
What is the APF for a full face air purifying respirator -
ANSWER-50
Friable ACM is any material that can be: - ANSWER-Crushed,
pulverized, reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is - ANSWER-0.1 f/cc
over 8 hours TWA
, 3 | Page
According to ASHERA, how many air samples must be taken
for final clearance for NESHAP size project? - ANSWER-13
samples (5 inside, 5 outside, 2 fields blanks , one sealed
blank)TEM
Laboratories that perform PLM and TEM must be accredited by
- ANSWER-National Voluntary Laboratory Accreditation
Program
AHERA is for - ANSWER-Public schools K-12
What is the notification requirement for asbestos projects in DC
- ANSWER-10 working days prior to start NESHAP size
projects and any project over 18 square feet of flooring.
Building owner to notify tenants no less than 30 days prior to
start of the project in writing
What is a NESHAP sized project - ANSWER-160 square feet,
260 linear feet, or 35 cubic feet