QSP EXAM WITH CORRECT
SOLUTIONS/PRACTICE TRUE OR FALSE: if construction of an LUP
will occur across several properties, the utility company, municipality, or other
public/private company/agency that owns or operates the LUP project is responsible
for obtaining coverage - -ANS☑️☑️--True
1. Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - -ANS☑️☑️--B
2. All NAL data must be uploaded within ___ after NAL exceedance has been
identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - -ANS☑️☑️--C
3. Who must file Permit Registration Documents (PRDs) prior to the commencement
of construction activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - -ANS☑️☑️--B
TEST
4. When does the CGP apply? - -ANS☑️☑️--Any construction or demolition of one
acre or more
, 5. Activities under the CGP include:
a. Routine maintenance to maintain original line and grade, hydraulic
capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - -ANS☑️☑️--C
6. Which regulation establishes a framework for regulating municipal and industrial
storm water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - -ANS☑️☑️--A
7. Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - -
ANS☑️☑️--E
8. When possible, use erosion controls as the ___ protection, with sediment controls
as a ___system.
a. primary, secondary
b. secondary, primary - -ANS☑️☑️--A
SOLUTIONS/PRACTICE TRUE OR FALSE: if construction of an LUP
will occur across several properties, the utility company, municipality, or other
public/private company/agency that owns or operates the LUP project is responsible
for obtaining coverage - -ANS☑️☑️--True
1. Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - -ANS☑️☑️--B
2. All NAL data must be uploaded within ___ after NAL exceedance has been
identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - -ANS☑️☑️--C
3. Who must file Permit Registration Documents (PRDs) prior to the commencement
of construction activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - -ANS☑️☑️--B
TEST
4. When does the CGP apply? - -ANS☑️☑️--Any construction or demolition of one
acre or more
, 5. Activities under the CGP include:
a. Routine maintenance to maintain original line and grade, hydraulic
capacity, or original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. - -ANS☑️☑️--C
6. Which regulation establishes a framework for regulating municipal and industrial
storm water discharges to waters of the United States:
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - -ANS☑️☑️--A
7. Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - -
ANS☑️☑️--E
8. When possible, use erosion controls as the ___ protection, with sediment controls
as a ___system.
a. primary, secondary
b. secondary, primary - -ANS☑️☑️--A