AVO SUBSTATION MAINTENANCE II QUESTIONS AND CORRECT
ANSWERS 100% VERIFIED!!!! ALREADY GRADED A+ LATEST
UPDATE!!!
_____ questions and participate in discussions, _____ time by being punctual and ______ safety rules. -
(ANSWER)Ask questions and participate in discussions, value time by being punctual and observe safety
rules.
Appropriate PPE must be used based on _______ to be _______. - (ANSWER)Appropriate PPE must be
used based on task to be performed.
Horseplay will not be __________at any time. - (ANSWER)Horseplay will not be tolerated at any time.
The shock hazard exists when there is a _________ for current to flow. - (ANSWER)The shock hazard
exists when there is a potential for current to flow.
The first measure to protect workers from shock is to control the voltage hazards with an appropriate
_________ ______ ________ procedure. - (ANSWER)The first measure to protect workers from shock is
to control the voltage hazards with an appropriate Hazardous energy control procedure.
__________ can be a source of hazards that may be overlooked by the worker. - (ANSWER)Weather can
be a source of hazards that may be overlooked by the worker.
The frequency rating of a __________is the normal system frequency. - (ANSWER)The frequency rating
of a transformer is the normal system frequency.
If aluminum is used as__________, either on the high voltage winding, low voltage winding, or both, it is
indicated. - (ANSWER)If aluminum is used as winding conductor, either on the high voltage winding, low
voltage winding, or both, it is indicated.
Class of a transformer is the ___________. - (ANSWER)Class of a transformer is the type of cooling
Manufactures serial number is used for ___________. - (ANSWER)Manufactures serial number is used
for identification.
, AVO SUBSTATION MAINTENANCE II QUESTIONS AND CORRECT
ANSWERS 100% VERIFIED!!!! ALREADY GRADED A+ LATEST
UPDATE!!!
___ ____ ___ _______is normally, a high voltage winding tap changer. - (ANSWER)No load tap changers
is normally, a high voltage winding tap changer.
The approximate weight of the major components of a transformer normally included are core and coil,
main tank or case, _______and ________. - (ANSWER)The approximate weight of the major components
of a transformer normally included are core and coil, main tank or case, radiator, and oil.
After the test is complete, windings must be __________ out using heavy current leads and grounded to
bleed off any changes that may have built up during the test. - (ANSWER)After the test is complete,
windings must be shorted out using heavy current leads and grounded to bleed off any changes that may
have built up during the test.
DC windings resistance is usually conducted, for field purposes, to evaluate and determine if any changes
have occurred in the ________ __________ ______. - (ANSWER)DC windings resistance is usually
conducted, for field purposes, to evaluate and determine if any changes have occurred in the current-
carrying path.
The _______ _________ measurements can be as accurate transformer ohmmeter reading directly in
ohms. - (ANSWER)The winding resistance measurements can be as accurate transformer ohmmeter
reading directly in ohms.
The ______ _____ _____ ___ __________ under test is measured by an accurate transformer ohmmeter
reading directly in ohms. - (ANSWER)The Voltage drop across the resistance under test is measured by an
accurate transformer ohmmeter reading directly in ohms.
When calculating the winding resistance it is very important to note that most manufactures report the
winding resistance measurement as if all three windings are ________ __ _______. - (ANSWER)When
calculating the winding resistance it is very important to note that most manufactures report the
winding resistance measurement as if all three windings are connected in series.
ANSWERS 100% VERIFIED!!!! ALREADY GRADED A+ LATEST
UPDATE!!!
_____ questions and participate in discussions, _____ time by being punctual and ______ safety rules. -
(ANSWER)Ask questions and participate in discussions, value time by being punctual and observe safety
rules.
Appropriate PPE must be used based on _______ to be _______. - (ANSWER)Appropriate PPE must be
used based on task to be performed.
Horseplay will not be __________at any time. - (ANSWER)Horseplay will not be tolerated at any time.
The shock hazard exists when there is a _________ for current to flow. - (ANSWER)The shock hazard
exists when there is a potential for current to flow.
The first measure to protect workers from shock is to control the voltage hazards with an appropriate
_________ ______ ________ procedure. - (ANSWER)The first measure to protect workers from shock is
to control the voltage hazards with an appropriate Hazardous energy control procedure.
__________ can be a source of hazards that may be overlooked by the worker. - (ANSWER)Weather can
be a source of hazards that may be overlooked by the worker.
The frequency rating of a __________is the normal system frequency. - (ANSWER)The frequency rating
of a transformer is the normal system frequency.
If aluminum is used as__________, either on the high voltage winding, low voltage winding, or both, it is
indicated. - (ANSWER)If aluminum is used as winding conductor, either on the high voltage winding, low
voltage winding, or both, it is indicated.
Class of a transformer is the ___________. - (ANSWER)Class of a transformer is the type of cooling
Manufactures serial number is used for ___________. - (ANSWER)Manufactures serial number is used
for identification.
, AVO SUBSTATION MAINTENANCE II QUESTIONS AND CORRECT
ANSWERS 100% VERIFIED!!!! ALREADY GRADED A+ LATEST
UPDATE!!!
___ ____ ___ _______is normally, a high voltage winding tap changer. - (ANSWER)No load tap changers
is normally, a high voltage winding tap changer.
The approximate weight of the major components of a transformer normally included are core and coil,
main tank or case, _______and ________. - (ANSWER)The approximate weight of the major components
of a transformer normally included are core and coil, main tank or case, radiator, and oil.
After the test is complete, windings must be __________ out using heavy current leads and grounded to
bleed off any changes that may have built up during the test. - (ANSWER)After the test is complete,
windings must be shorted out using heavy current leads and grounded to bleed off any changes that may
have built up during the test.
DC windings resistance is usually conducted, for field purposes, to evaluate and determine if any changes
have occurred in the ________ __________ ______. - (ANSWER)DC windings resistance is usually
conducted, for field purposes, to evaluate and determine if any changes have occurred in the current-
carrying path.
The _______ _________ measurements can be as accurate transformer ohmmeter reading directly in
ohms. - (ANSWER)The winding resistance measurements can be as accurate transformer ohmmeter
reading directly in ohms.
The ______ _____ _____ ___ __________ under test is measured by an accurate transformer ohmmeter
reading directly in ohms. - (ANSWER)The Voltage drop across the resistance under test is measured by an
accurate transformer ohmmeter reading directly in ohms.
When calculating the winding resistance it is very important to note that most manufactures report the
winding resistance measurement as if all three windings are ________ __ _______. - (ANSWER)When
calculating the winding resistance it is very important to note that most manufactures report the
winding resistance measurement as if all three windings are connected in series.