1. Under Idaho Code § 54-
gf gf gf gf gf
4505, which of the following is a minimum requirement for construction manager licensur
gf gf gf gf gf gf gf gf gf gf gf gf
e?
A. A bachelor's degree in any field with 2 years of construction experience
gf gf gf gf gf gf gf gf gf gf gf gf
B. A bachelor's degree in architecture, engineering, or construction management with 4 years of
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
experience managing construction projects gf gf gf
C. A high school diploma with 10 years of construction trade experience
gf gf gf gf gf gf gf gf gf gf gf
D. Completion of an OSHA 30-hour course and 3 years of project management experience
gf gf gf gf gf gf gf gf gf gf gf gf gf
2. If an applicant does not have a qualifying bachelor's degree, what alternative path to lic
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ensure exists under Idaho law?
gf gf gf gf
A. No alternative path exists; a degree is mandatory
gf gf gf gf gf gf gf gf
B. A minimum of 5 years of experience managing construction projects
gf gf gf gf gf gf gf gf gf gf
C. A master's degree in business administration
gf gf gf gf gf gf
D. Passing the exam without any experience requirement
gf gf gf gf gf gf gf
3. According to IDAPA 07.05.01, what is the minimum passing score required for the Const
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ruction Manager examination?
gf gf
A. 70%
gf
B. 75%
gf
C. 80%
gf
D. 65%
gf
4. If an applicant fails a section of the Construction Manager examination on the second a
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ttempt, what is the consequence?
gf gf gf gf
A. The applicant may retake only the failed section immediately
gf gf gf gf gf gf gf gf gf
B. The applicant must wait one full year before taking the examination again and must retake all s
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ections
,C. The applicant must complete additional coursework before retesting
gf gf gf gf gf gf gf gf
D. The applicant is permanently disqualified from licensure
gf gf gf gf gf gf gf
5. What is the primary difference between a Public Works Contractor license and a Constr
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
uction Manager license in Idaho?gf gf gf gf
A. There is no difference; they are interchangeable terms
gf gf gf gf gf gf gf gf
B. A Construction Manager license allows supervision of contractors, while a Contractor license p
gf gf gf gf gf gf gf gf gf gf gf gf gf
ermits direct performance of construction work
gf gf gf gf gf
C. A Contractor license requires a higher exam score than a Construction Manager license
gf gf gf gf gf gf gf gf gf gf gf gf gf
D. A Construction Manager license is only valid for private projects
gf gf gf gf gf gf gf gf gf gf
6. Which agency is responsible for overseeing Construction Manager licensing in Idaho?
gf gf gf gf gf gf gf gf gf gf gf
A. Idaho Contractors Board (DOPL)
gf gf gf gf
B. Idaho Division of Building Safety (DBS)
gf gf gf gf gf gf
C. Idaho Transportation Department (ITD)
gf gf gf gf
D. Department of Environmental Quality (DEQ)
gf gf gf gf gf
7. A licensed Construction Manager who undergoes a change in business organization fro
gf gf gf gf gf gf gf gf gf gf gf gf
m a sole proprietorship to an LLC must do which of the following?
gf gf gf gf gf gf gf gf gf gf gf gf
A. Notify the board informally via email
gf gf gf gf gf gf
B. File an application for a new license on behalf of the successor organization within 60 days
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
C. Nothing; the license transfers automatically
gf gf gf gf gf
D. Wait until the next renewal cycle to update the license
gf gf gf gf gf gf gf gf gf gf
8. Under the Public Works Construction Management Licensing Act, how often must a Con
gf gf gf gf gf gf gf gf gf gf gf gf gf
struction Manager license be renewed? gf gf gf gf
A. Every 2 years
gf gf gf
B. Annually
gf
C. Every 3 years
gf gf gf
D. Every 5 years
gf gf gf
9. The Construction Manager examination is required to test applicants on all of the follo
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
wing areas EXCEPT: gf gf
A. Health, environmental, and safety regulations
gf gf gf gf gf
B. Interpretation of construction contracts
gf gf gf gf
C. Advanced structural engineering design calculations
gf gf gf gf gf
D. Financing, scheduling, and project administration
gf gf gf gf gf
10. If a Construction Manager license application is incomplete, how long does DBS typica
gf gf gf gf gf gf gf gf gf gf gf gf gf
lly keep the application open for the applicant to submit missing documentation?
gf gf gf gf gf gf gf gf gf gf gf
,A. 30 days
gf gf
B. 6 months
gf gf
C. 1 year
gf gf
D. 90 days
gf gf
Section 2: Contract Administration & Documentation (Questions 11-25)
gf gf gf gf gf gf gf
11. Which document is most useful for establishing the sequence and timing of planned c
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
onstruction activities? gf
A. Bid bond
gf gf
B. Project schedule
gf gf
C. Corporate charter
gf gf
D. Tax return
gf gf
12. What is the primary function of a Request for Information (RFI)?
gf gf gf gf gf gf gf gf gf gf gf
A. To create a new contract automatically
gf gf gf gf gf gf
B. To obtain clarification concerning unclear or conflicting project information
gf gf gf gf gf gf gf gf gf
C. To authorize payment automatically
gf gf gf gf
D. To replace a change order
gf gf gf gf gf
13. A proposed change increases contract scope and price. Which instrument is generally
gf gf gf gf gf gf gf gf gf gf gf gf gf
most appropriate when formally authorized under the contract?
gf gf gf gf gf gf gf
A. Daily report
gf gf
B. Change order
gf gf
C. Safety observation
gf gf
D. Punch list
gf gf
14. Contractor submittals generally do NOT transfer the contractor's contractual responsi
gf gf gf gf gf gf gf gf gf gf
bility for which of the following?
gf gf gf gf gf
A. Materials only
gf gf
B. Means, methods, dimensions, and fabrication
gf gf gf gf gf
C. Scheduling and sequencing
gf gf gf
D. Safety compliance
gf gf
15. What is a constructive change?
gf gf gf gf gf
A. A formally signed change order only
gf gf gf gf gf gf
B. A situation where owner-
gf gf gf gf
directed actions effectively require work beyond the original contract despite the absence of a for
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
mal change order
gf gf
, C. A routine inspection
gf gf gf
D. A completed punch-list item
gf gf gf gf
16. Why should a Construction Manager maintain a change-order log?
gf gf gf gf gf gf gf gf gf
A. To avoid using contracts
gf gf gf gf
B. To track status, cost, time, approvals, and cumulative impact of changes
gf gf gf gf gf gf gf gf gf gf gf
C. To eliminate RFIs
gf gf gf
D. To replace the schedule
gf gf gf gf
17. Which condition most strongly supports a differing-site-condition claim?
gf gf gf gf gf gf gf gf
A. The contractor simply underestimated quantities
gf gf gf gf gf
B. Actual subsurface conditions materially differ from the contract representation or reasonably a
gf gf gf gf gf gf gf gf gf gf gf gf
nticipated conditions covered by the contract
gf gf gf gf gf
C. The contractor wants a higher profit
gf gf gf gf gf gf
D. The owner changes paint color
gf gf gf gf gf
18. What is a punch list?
gf gf gf gf gf
A. A material order list
gf gf gf gf
B. A list of incomplete or defective items to be corrected before project acceptance
gf gf gf gf gf gf gf gf gf gf gf gf gf
C. A list of approved subcontractors
gf gf gf gf gf
D. A list of safety violations
gf gf gf gf gf
19. What should a Construction Manager do when a contractor gives verbal notice of a po
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
tentially compensable delay? gf gf
A. Disregard it
gf gf
B. Document the notice and require compliance with the contract's formal notice procedures
gf gf gf gf gf gf gf gf gf gf gf gf
C. Immediately approve the claim
gf gf gf gf
D. Terminate the contract
gf gf gf
20. Which record is particularly valuable when a contractor later submits a delay claim?
gf gf gf gf gf gf gf gf gf gf gf gf gf
A. Advertising brochures
gf gf
B. Contemporary daily reports and schedule documentation
gf gf gf gf gf gf
C. Personal photographs unrelated to the work
gf gf gf gf gf gf
D. Old business cards
gf gf gf
21. What is the primary purpose of a performance bond?
gf gf gf gf gf gf gf gf gf
A. Guarantee the contractor's performance of contractual obligations
gf gf gf gf gf gf gf
B. Guarantee the lowest material prices
gf gf gf gf gf
C. Guarantee the owner's financing
gf gf gf gf
D. Replace a bid
gf gf gf
Advanced 100-Question Practice Exam 2026 |
Questions & Answers with Detailed
Rationales | Complete Exam Prep & Study
Guide
Section 1: Licensing Requirements & Qualification (Questions 1-10)
gf gf gf gf gf gf gf
1. Under Idaho Code § 54-
gf gf gf gf gf
4505, which of the following is a minimum requirement for construction manager licensur
gf gf gf gf gf gf gf gf gf gf gf gf
e?
A. A bachelor's degree in any field with 2 years of construction experience
gf gf gf gf gf gf gf gf gf gf gf gf
B. A bachelor's degree in architecture, engineering, or construction management with 4 years of
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
experience managing construction projects gf gf gf
C. A high school diploma with 10 years of construction trade experience
gf gf gf gf gf gf gf gf gf gf gf
D. Completion of an OSHA 30-hour course and 3 years of project management experience
gf gf gf gf gf gf gf gf gf gf gf gf gf
2. If an applicant does not have a qualifying bachelor's degree, what alternative path to lic
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ensure exists under Idaho law?
gf gf gf gf
A. No alternative path exists; a degree is mandatory
gf gf gf gf gf gf gf gf
B. A minimum of 5 years of experience managing construction projects
gf gf gf gf gf gf gf gf gf gf
C. A master's degree in business administration
gf gf gf gf gf gf
D. Passing the exam without any experience requirement
gf gf gf gf gf gf gf
3. According to IDAPA 07.05.01, what is the minimum passing score required for the Const
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ruction Manager examination?
gf gf
A. 70%
gf
B. 75%
gf
C. 80%
gf
D. 65%
gf
4. If an applicant fails a section of the Construction Manager examination on the second a
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ttempt, what is the consequence?
gf gf gf gf
A. The applicant may retake only the failed section immediately
gf gf gf gf gf gf gf gf gf
B. The applicant must wait one full year before taking the examination again and must retake all s
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
ections
,C. The applicant must complete additional coursework before retesting
gf gf gf gf gf gf gf gf
D. The applicant is permanently disqualified from licensure
gf gf gf gf gf gf gf
5. What is the primary difference between a Public Works Contractor license and a Constr
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
uction Manager license in Idaho?gf gf gf gf
A. There is no difference; they are interchangeable terms
gf gf gf gf gf gf gf gf
B. A Construction Manager license allows supervision of contractors, while a Contractor license p
gf gf gf gf gf gf gf gf gf gf gf gf gf
ermits direct performance of construction work
gf gf gf gf gf
C. A Contractor license requires a higher exam score than a Construction Manager license
gf gf gf gf gf gf gf gf gf gf gf gf gf
D. A Construction Manager license is only valid for private projects
gf gf gf gf gf gf gf gf gf gf
6. Which agency is responsible for overseeing Construction Manager licensing in Idaho?
gf gf gf gf gf gf gf gf gf gf gf
A. Idaho Contractors Board (DOPL)
gf gf gf gf
B. Idaho Division of Building Safety (DBS)
gf gf gf gf gf gf
C. Idaho Transportation Department (ITD)
gf gf gf gf
D. Department of Environmental Quality (DEQ)
gf gf gf gf gf
7. A licensed Construction Manager who undergoes a change in business organization fro
gf gf gf gf gf gf gf gf gf gf gf gf
m a sole proprietorship to an LLC must do which of the following?
gf gf gf gf gf gf gf gf gf gf gf gf
A. Notify the board informally via email
gf gf gf gf gf gf
B. File an application for a new license on behalf of the successor organization within 60 days
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
C. Nothing; the license transfers automatically
gf gf gf gf gf
D. Wait until the next renewal cycle to update the license
gf gf gf gf gf gf gf gf gf gf
8. Under the Public Works Construction Management Licensing Act, how often must a Con
gf gf gf gf gf gf gf gf gf gf gf gf gf
struction Manager license be renewed? gf gf gf gf
A. Every 2 years
gf gf gf
B. Annually
gf
C. Every 3 years
gf gf gf
D. Every 5 years
gf gf gf
9. The Construction Manager examination is required to test applicants on all of the follo
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
wing areas EXCEPT: gf gf
A. Health, environmental, and safety regulations
gf gf gf gf gf
B. Interpretation of construction contracts
gf gf gf gf
C. Advanced structural engineering design calculations
gf gf gf gf gf
D. Financing, scheduling, and project administration
gf gf gf gf gf
10. If a Construction Manager license application is incomplete, how long does DBS typica
gf gf gf gf gf gf gf gf gf gf gf gf gf
lly keep the application open for the applicant to submit missing documentation?
gf gf gf gf gf gf gf gf gf gf gf
,A. 30 days
gf gf
B. 6 months
gf gf
C. 1 year
gf gf
D. 90 days
gf gf
Section 2: Contract Administration & Documentation (Questions 11-25)
gf gf gf gf gf gf gf
11. Which document is most useful for establishing the sequence and timing of planned c
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
onstruction activities? gf
A. Bid bond
gf gf
B. Project schedule
gf gf
C. Corporate charter
gf gf
D. Tax return
gf gf
12. What is the primary function of a Request for Information (RFI)?
gf gf gf gf gf gf gf gf gf gf gf
A. To create a new contract automatically
gf gf gf gf gf gf
B. To obtain clarification concerning unclear or conflicting project information
gf gf gf gf gf gf gf gf gf
C. To authorize payment automatically
gf gf gf gf
D. To replace a change order
gf gf gf gf gf
13. A proposed change increases contract scope and price. Which instrument is generally
gf gf gf gf gf gf gf gf gf gf gf gf gf
most appropriate when formally authorized under the contract?
gf gf gf gf gf gf gf
A. Daily report
gf gf
B. Change order
gf gf
C. Safety observation
gf gf
D. Punch list
gf gf
14. Contractor submittals generally do NOT transfer the contractor's contractual responsi
gf gf gf gf gf gf gf gf gf gf
bility for which of the following?
gf gf gf gf gf
A. Materials only
gf gf
B. Means, methods, dimensions, and fabrication
gf gf gf gf gf
C. Scheduling and sequencing
gf gf gf
D. Safety compliance
gf gf
15. What is a constructive change?
gf gf gf gf gf
A. A formally signed change order only
gf gf gf gf gf gf
B. A situation where owner-
gf gf gf gf
directed actions effectively require work beyond the original contract despite the absence of a for
gf gf gf gf gf gf gf gf gf gf gf gf gf gf
mal change order
gf gf
, C. A routine inspection
gf gf gf
D. A completed punch-list item
gf gf gf gf
16. Why should a Construction Manager maintain a change-order log?
gf gf gf gf gf gf gf gf gf
A. To avoid using contracts
gf gf gf gf
B. To track status, cost, time, approvals, and cumulative impact of changes
gf gf gf gf gf gf gf gf gf gf gf
C. To eliminate RFIs
gf gf gf
D. To replace the schedule
gf gf gf gf
17. Which condition most strongly supports a differing-site-condition claim?
gf gf gf gf gf gf gf gf
A. The contractor simply underestimated quantities
gf gf gf gf gf
B. Actual subsurface conditions materially differ from the contract representation or reasonably a
gf gf gf gf gf gf gf gf gf gf gf gf
nticipated conditions covered by the contract
gf gf gf gf gf
C. The contractor wants a higher profit
gf gf gf gf gf gf
D. The owner changes paint color
gf gf gf gf gf
18. What is a punch list?
gf gf gf gf gf
A. A material order list
gf gf gf gf
B. A list of incomplete or defective items to be corrected before project acceptance
gf gf gf gf gf gf gf gf gf gf gf gf gf
C. A list of approved subcontractors
gf gf gf gf gf
D. A list of safety violations
gf gf gf gf gf
19. What should a Construction Manager do when a contractor gives verbal notice of a po
gf gf gf gf gf gf gf gf gf gf gf gf gf gf gf
tentially compensable delay? gf gf
A. Disregard it
gf gf
B. Document the notice and require compliance with the contract's formal notice procedures
gf gf gf gf gf gf gf gf gf gf gf gf
C. Immediately approve the claim
gf gf gf gf
D. Terminate the contract
gf gf gf
20. Which record is particularly valuable when a contractor later submits a delay claim?
gf gf gf gf gf gf gf gf gf gf gf gf gf
A. Advertising brochures
gf gf
B. Contemporary daily reports and schedule documentation
gf gf gf gf gf gf
C. Personal photographs unrelated to the work
gf gf gf gf gf gf
D. Old business cards
gf gf gf
21. What is the primary purpose of a performance bond?
gf gf gf gf gf gf gf gf gf
A. Guarantee the contractor's performance of contractual obligations
gf gf gf gf gf gf gf
B. Guarantee the lowest material prices
gf gf gf gf gf
C. Guarantee the owner's financing
gf gf gf gf
D. Replace a bid
gf gf gf