Exam (elaborations)

Idaho Construction Manager Qualification Advanced 100-Question Practice Exam 2026 | Questions & Answers with Detailed Rationales | Complete Exam Prep & Study Guide

Document preview thumbnail
Preview 4 out of 38 pages

Idaho Construction Manager Qualification Advanced 100-Question Practice Exam 2026 | Questions & Answers with Detailed Rationales | Complete Exam Prep & Study Guide

Content preview

Idaho Construction Manager Qualification
Advanced 100-Question Practice Exam 2026 |
Questions & Answers with Detailed
Rationales | Complete Exam Prep & Study
Guide
Idaho Construction Manager Qualification (Advanced)
fd fd fd fd




100-Question Practice Exam fd fd




1. According to Idaho Statute (Title 54, Chapter 19), which of the following activities expli
fd fd fd fd fd fd fd fd fd fd fd fd fd fd




citly requires a Construction Manager to be licensed?
fd fd fd fd fd fd fd




A) Providing labor and materials for a project under $5,000.
fd fd fd fd fd fd fd fd fd




B) Managing a project for an owner-occupied single-family residence.
fd fd fd fd fd fd fd fd




C) Acting as a consultant for scheduling and cost control for a commercial project.
fd fd fd fd fd fd fd fd fd fd fd fd fd




D) Selling building materials directly to a general contractor.
fd fd fd fd fd fd fd fd




2. The Idaho Board of Building Contractors has jurisdiction over which of the following?
fd fd fd fd fd fd fd fd fd fd fd fd fd




A) Architects and Engineers.
fd fd fd




B) Residential and Commercial Construction Managers.
fd fd fd fd fd




C) Real Estate Appraisers.
fd fd fd




D) Interior Designers.
fd fd




3. A Construction Manager (CM) must ensure their license is renewed. What is the renewal
fd fd fd fd fd fd fd fd fd fd fd fd fd fd f




period for an Idaho contractor’s license?
d fd fd fd fd fd




A) Annually
fd




B) Every 2 Years
fd fd fd




C) Every 3 Years
fd fd fd




D) Every 5 Years
fd fd fd




4. In Idaho, who is primarily responsible for obtaining the required building permits for a
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




construction project? fd




A) The Owner
fd fd




B) The CM/Contractor
fd fd




C) The Architect
fd fd




D) The Subcontractor performing the work
fd fd fd fd fd




5. If a CM is acting as a General Contractor and the total contract price exceeds $50,000, w
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




hat is required regarding the contract?
fd fd fd fd fd




A) It must be notarized.
fd fd fd fd

,B) It must include a specific clause regarding attorney fees.
fd fd fd fd fd fd fd fd fd




C) It must be in writing and signed by both parties (Statute of Frauds).
fd fd fd fd fd fd fd fd fd fd fd fd fd




D) It must be filed with the Board within 10 days.
fd fd fd fd fd fd fd fd fd fd




6. A "Stop Notice" in Idaho is a legal tool used by subcontractors to:
fd fd fd fd fd fd fd fd fd fd fd fd fd




A) Force the CM to hire union labor.
fd fd fd fd fd fd fd




B) Halt construction due to safety violations.
fd fd fd fd fd fd




C) Claim a lien against the funds owed by the owner to the contractor.
fd fd fd fd fd fd fd fd fd fd fd fd fd




D) Stop the issuance of a Certificate of Occupancy.
fd fd fd fd fd fd fd fd




7. Which of the following is a specific requirement for a "Retainage" clause in public work
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




s contracts in Idaho?
fd fd fd




A) Retainage cannot exceed 5% of the contract price.
fd fd fd fd fd fd fd fd




B) Retainage cannot exceed 10% of the contract price.
fd fd fd fd fd fd fd fd




C) Retainage must be held in an interest-bearing account.
fd fd fd fd fd fd fd fd




D) Retainage must be released within 30 days of project completion.
fd fd fd fd fd fd fd fd fd fd




8. Under Idaho Code, when is a contractor allowed to pay a subcontractor on a "pay-
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




when-paid" basis without restriction? fd fd fd




A) Always, by default.
fd fd fd




B) Only if specifically stated in the subcontract.
fd fd fd fd fd fd fd




C) Never, it is illegal.
fd fd fd fd




D) Only for projects under $100,000.
fd fd fd fd fd




9. What is the maximum time allowed for a lien claimant to file a construction lien after th
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




e completion of the work in Idaho?
fd fd fd fd fd fd




A) 30 Days
fd fd




B) 60 Days
fd fd




C) 90 Days
fd fd




D) 120 Days
fd fd




10. The Idaho licensing board can suspend or revoke a license for "gross negligence." Wha
fd fd fd fd fd fd fd fd fd fd fd fd fd fd




t does "gross negligence" typically imply?
fd fd fd fd fd




A) A minor scheduling error.
fd fd fd fd




B) A failure to show up to a meeting.
fd fd fd fd fd fd fd fd




C) A reckless disregard for the safety or property of others.
fd fd fd fd fd fd fd fd fd fd




D) A disagreement over payment terms.
fd fd fd fd fd




11. Which project delivery method involves the CM advising the owner during the design
fd fd fd fd fd fd fd fd fd fd fd fd fd fd




phase but not holding the trade contracts?
fd fd fd fd fd fd




A) Design-Bid-Build
fd




B) CM at Risk
fd fd fd




C) CM as Agent (Agency CM)
fd fd fd fd fd




D) Design-Build
fd

,12. In a "CM at Risk" project delivery method, what is the primary financial role of the CM
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




?
A) They act as a consultant with no financial risk.
fd fd fd fd fd fd fd fd fd




B) They guarantee the project cost (GMP - Guaranteed Maximum Price).
fd fd fd fd fd fd fd fd fd fd




C) They are responsible only for the design fees.
fd fd fd fd fd fd fd fd




D) They provide financing for the owner.
fd fd fd fd fd fd




13. The "Critical Path Method" (CPM) scheduling technique is primarily used to:
fd fd fd fd fd fd fd fd fd fd fd




A) Determine the cost of the project.
fd fd fd fd fd fd




B) Identify the sequence of tasks that directly affect the project completion date.
fd fd fd fd fd fd fd fd fd fd fd fd




C) Assign specific workers to specific jobs.
fd fd fd fd fd fd




D) Market the project to potential buyers.
fd fd fd fd fd fd




14. In a CPM schedule, "Total Float" refers to:
fd fd fd fd fd fd fd fd




A) The amount of time a non-critical task can be delayed without delaying the project finish.
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




B) The time required to mobilize equipment.
fd fd fd fd fd fd




C) The cost of overtime labor.
fd fd fd fd fd




D) The distance between construction sites.
fd fd fd fd fd




15. A "Change Order" in project management is used to:
fd fd fd fd fd fd fd fd fd




A) Authorize a change in the project scope, schedule, or cost.
fd fd fd fd fd fd fd fd fd fd




B) Replace the superintendent on site.
fd fd fd fd fd




C) Order new materials from a supplier.
fd fd fd fd fd fd




D) Terminate a subcontractor.
fd fd fd




16. If a CM fails to properly manage a subcontractor who is damaging existing adjacent pr
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




operty, the CM is primarily liable to the owner for:
fd fd fd fd fd fd fd fd fd




A) Negligence.
fd




B) Breach of fiduciary duty.
fd fd fd fd




C) Breach of contract.
fd fd fd




D) Fraud.
fd




17. When managing a project, a CM is often considered an "agent" of the owner. What do
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




es this primarily mean legally?
fd fd fd fd




A) The CM can sign checks on behalf of the owner.
fd fd fd fd fd fd fd fd fd fd




B) The CM owes a fiduciary duty to act in the best interest of the owner.
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




C) The CM is personally liable for all construction defects.
fd fd fd fd fd fd fd fd fd




D) The CM must purchase insurance in the owner’s name.
fd fd fd fd fd fd fd fd fd




18. The Occupational Safety and Health Act (OSHA) requires employers to provide a work
fd fd fd fd fd fd fd fd fd fd fd fd fd




place "free from recognized hazards." This is known as the:
fd fd fd fd fd fd fd fd fd




A) Right-to-Know clause.
fd fd




B) General Duty Clause.
fd fd fd

, C) Safety Data Sheet requirement.
fd fd fd fd




D) Competent Person requirement.
fd fd fd




19. Under OSHA regulations, who is responsible for requiring hard hats, safety glasses, an
fd fd fd fd fd fd fd fd fd fd fd fd fd




d high-visibility vests on a construction site?
fd fd fd fd fd fd




A) The Owner only.
fd fd fd




B) The Subcontractor only.
fd fd fd




C) The Employer (CM/GC) and Subcontractors.
fd fd fd fd fd




D) The Architect.
fd fd




20. OSHA Regulation 1926.501 requires fall protection for workers on a walking/working s
fd fd fd fd fd fd fd fd fd fd fd fd




urface with an unprotected edge that is how many feet above a lower level?
fd fd fd fd fd fd fd fd fd fd fd fd fd




A) 4 feet
fd fd




B) 6 feet
fd fd




C) 10 feet
fd fd




D) 15 feet
fd fd




21. Which of the following is a "Competent Person" required to do under OSHA standards
fd fd fd fd fd fd fd fd fd fd fd fd fd fd




?
A) Create the project schedule.
fd fd fd fd




B) Identify and correct hazardous conditions in the workplace.
fd fd fd fd fd fd fd fd




C) Sign the building permits.
fd fd fd fd




D) Approve the final payment requests.
fd fd fd fd fd




22. A CM notices a trench is 8 feet deep and has no shoring or protective system. What is t
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




he CM’s best course of action?
fd fd fd fd fd




A) Allow work to proceed if it’s only for 15 minutes.
fd fd fd fd fd fd fd fd fd fd




B) Stop work immediately until a competent person installs a protective system.
fd fd fd fd fd fd fd fd fd fd fd




C) Notify the owner but continue work.
fd fd fd fd fd fd




D) Only warn the workers verbally.
fd fd fd fd fd




23. What is the OSHA requirement for the maximum slope angle for Type A soil (stable cla
fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd fd




y) without a protective system?
fd fd fd fd




A) 0.5:1 (vertical to horizontal)
fd fd fd fd




B) 1:1fd




C) 1.5:1
fd




D) 2:1 fd




24. The Hazard Communication Standard (HazCom) requires employers to have Safety Dat
fd fd fd fd fd fd fd fd fd fd fd




a Sheets (SDS) available for:
fd fd fd fd




A) All equipment on site.
fd fd fd fd




B) All hazardous chemicals used on site.
fd fd fd fd fd fd




C) All personnel files.
fd fd fd




D) All financial records.
fd fd fd

Document information

Uploaded on
August 27, 2026
Number of pages
38
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
mariaseth
3.4
(5)
Sold
52
Followers
0
Items
1408
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions