EPA LEAD RISK ASSESSOR EXAM SCRIPT
VERIFIED QUESTIONS WITH ACCURATE
ANSWERS
●● A child may be treated for lead poisoning by using...
Answer: Chelation Therapy
●● The purpose of a risk assessment is to?
Answer: Identify LBP hazards
●● What does EBL mean?
Answer: Elevated Blood Level
●● How does lead primarily enter children's bodies?
Answer: Ingestion of lead dust
●● Would a child with consecutive blood lead tests of 17 ug.dl, 9 ug/dl,
and 16 ug/dl be considered to be lead poisoned?
Answer: No, the elevated blood levels of 17 ug/dL and 16 ug/dL were
not consecutive.
, ●● Which is more useful for the renovation contractor, the lead
inspection or the risk assessment?
Answer: Lead inspection
●● What six sampling methods do Risk Assessor's use to identify lead
hazards?
Answer: Visual, dust, soil, paint chip, XRF, water
●● A certified Risk Assessor may conduct a Risk Assessment on a
property which is to be abated by the firm fir which they work if they...
Answer: Notify the client in writing
●● What is the OSHA Action Level for lead?
Answer: 30 ug/m3
●● Water sampling as part of a Risk Assessment is:
Mandatory, Optional, or Never included?
Answer: Optional
●● What are the six LBP hazards defined by the EPA?
Answer: Deteriorated Paint, Impact surface, Friction surface, dust, soil,
chewable surface
VERIFIED QUESTIONS WITH ACCURATE
ANSWERS
●● A child may be treated for lead poisoning by using...
Answer: Chelation Therapy
●● The purpose of a risk assessment is to?
Answer: Identify LBP hazards
●● What does EBL mean?
Answer: Elevated Blood Level
●● How does lead primarily enter children's bodies?
Answer: Ingestion of lead dust
●● Would a child with consecutive blood lead tests of 17 ug.dl, 9 ug/dl,
and 16 ug/dl be considered to be lead poisoned?
Answer: No, the elevated blood levels of 17 ug/dL and 16 ug/dL were
not consecutive.
, ●● Which is more useful for the renovation contractor, the lead
inspection or the risk assessment?
Answer: Lead inspection
●● What six sampling methods do Risk Assessor's use to identify lead
hazards?
Answer: Visual, dust, soil, paint chip, XRF, water
●● A certified Risk Assessor may conduct a Risk Assessment on a
property which is to be abated by the firm fir which they work if they...
Answer: Notify the client in writing
●● What is the OSHA Action Level for lead?
Answer: 30 ug/m3
●● Water sampling as part of a Risk Assessment is:
Mandatory, Optional, or Never included?
Answer: Optional
●● What are the six LBP hazards defined by the EPA?
Answer: Deteriorated Paint, Impact surface, Friction surface, dust, soil,
chewable surface