• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

CSCI 310 Midterm Study Guide Questions with Verified Correct Answers

Document preview thumbnail
Preview 3 out of 27 pages

CSCI 310 Midterm Study Guide Questions with Verified Correct Answers

Content preview

CSCI 310 Midterm Study Guide Questions with
Verified Correct Answers
7 Challenges in Software Engineering

1. Scale

2.Speed

3. Uniqueness

4. Legacy Software

5. Complexity

6. Culture

7. Changeability

Software Engineering Process Activities

SDVE

1.Specification

2. Development

3.Validation

4. Evolution

Aspects of good software

MDEA

1. maintainable

2. dependable

3. efficient

4. Accessible

6 Aspects of waterfall method

,RPDITM

1. Requirements

2. Planning

3. Design

4. Implementation

5. Testing

6. Maintenance

Ariane 5 Rocket failure

integer overflow

Mars Climate oribter

inconsistent metric used to estimate landing point (metric system vs. feet)

Therac-25

Radiation miscalculated, gave over 100x the safe amount of radiation (more cancer)

Hartford Coliseum Collapse

modeling system did not account for non-pure compression. Error in CAD software

Patriot Missile

Integer rounded incorrectly and killed allied troops

Y2K

Businesses spent 500 billion on programs that stored the year with two digits

Healthcare.gov

loose planning and over optimism lead to gross miscalculated budget.

, Waterfall Phases

Requirements

Project Planning

Design

Implementation

Testing

Maintenance

1. Requirements

Creates a description of the desired system:

which functions

required documentation

performance requirements

Also includes a feasibility study. Result is the SRS (software requirements specification

document)

2. Project Planning

Describes activities that ensure software is delivered:

on time

within budget

following requirements

Artifact: PMP (project management plan), includes schedule and budget

3. Design

Document information

Uploaded on
August 26, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
23937
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions