CSO EXAM SCRIPT 2026 FULL SOLUTIONS
VERIFIED CORRECT RESPONSES HIGH
SCORING
◉ During corner reflector emplacement, the mast assembly should
only be raised to an initial height, allowing the upper mast section to
rest against the mast guide bracket until the third crew member
secures the short shot safety restraint. Raising higher prior to this
can cause the antenna to fall causing injury or damage to equipment.
Answer: True
◉ The old key light on the KG-194 comes on indicating a CHANGE
KEY procedure has been initiated and completed.
Answer: True
◉ The ___ are the 1A44, 1A47, 1A82 and 1A86. They are identical
and allow each operator to access radios, dial circuits, intercom and
battle circuits.
Answer: OCU
◉ The ___ is the primary communications interface for PATRIOT,
performing message packing, routing, error checking and
, synchronization for all traffic with a PATRIOT battalion and between
BN and extra-BN units.
Answer: RLRIU
◉ The ____ is used to monitor mast deflection and operational status
of the AMG amplifiers. A meter indicates deflection of the masts
being monitored.
Answer: Antenna mask monitor panel
◉ During high wind antenna mast group mast retraction of the AMG
antennas, ___ people are required for this operation.
Answer: 3
◉ When aligning the AMG antennas, the ____ pointer can not be
rotated past the stop pointer due to cable wrap limitations.
Answer: Antennas
◉ The Base band unit requires the test using BIT and loop test per
TM 11-5820-1175-13&P to be performed on a ___ interval PMSC
Answer: Weekly
◉ Line of site communications utilizing the AMG should be planned
for no more than ___ KMs.
Answer: 40
VERIFIED CORRECT RESPONSES HIGH
SCORING
◉ During corner reflector emplacement, the mast assembly should
only be raised to an initial height, allowing the upper mast section to
rest against the mast guide bracket until the third crew member
secures the short shot safety restraint. Raising higher prior to this
can cause the antenna to fall causing injury or damage to equipment.
Answer: True
◉ The old key light on the KG-194 comes on indicating a CHANGE
KEY procedure has been initiated and completed.
Answer: True
◉ The ___ are the 1A44, 1A47, 1A82 and 1A86. They are identical
and allow each operator to access radios, dial circuits, intercom and
battle circuits.
Answer: OCU
◉ The ___ is the primary communications interface for PATRIOT,
performing message packing, routing, error checking and
, synchronization for all traffic with a PATRIOT battalion and between
BN and extra-BN units.
Answer: RLRIU
◉ The ____ is used to monitor mast deflection and operational status
of the AMG amplifiers. A meter indicates deflection of the masts
being monitored.
Answer: Antenna mask monitor panel
◉ During high wind antenna mast group mast retraction of the AMG
antennas, ___ people are required for this operation.
Answer: 3
◉ When aligning the AMG antennas, the ____ pointer can not be
rotated past the stop pointer due to cable wrap limitations.
Answer: Antennas
◉ The Base band unit requires the test using BIT and loop test per
TM 11-5820-1175-13&P to be performed on a ___ interval PMSC
Answer: Weekly
◉ Line of site communications utilizing the AMG should be planned
for no more than ___ KMs.
Answer: 40