1. During inspection of structural steel bridge members, an
inspector discovers a visible lamination in the flange plate near a
welded connection. What is the most appropriate initial action?
A. Grind the lamination completely away and continue inspection
B. Ignore it if the lamination does not extend through the full plate
thickness
C. Document the condition, identify its location and extent, and notify
the appropriate project/engineering personnel for evaluation
D. Weld directly over the lamination to seal it
Answer: C. Document the condition, identify its location and extent,
and notify the appropriate project/engineering personnel for
evaluation
Rationale: A lamination is a discontinuity within rolled steel that can
affect structural integrity, particularly when located near highly
stressed connections or welded regions. An inspector should not
independently repair, grind, or weld over a suspected significant
material defect without an approved engineering disposition. The
correct inspection response is to document the defect, establish its
extent as required by the inspection procedure, and obtain the
appropriate evaluation.
1
,2. Which inspection characteristic is most important when verifying
that a structural steel member has been fabricated according to the
approved contract documents?
A. The inspector's personal preference for member appearance
B. Conformance with approved drawings, specifications, applicable
standards, and approved fabrication procedures
C. Whether the steel has a glossy appearance
D. Whether the member was fabricated faster than scheduled
Answer: B. Conformance with approved drawings, specifications,
applicable standards, and approved fabrication procedures
Rationale: Structural steel inspection is fundamentally a conformity-
assurance function. The inspector verifies dimensions, materials,
welding, bolting, tolerances, coatings, identification, and other
characteristics against the governing contract documents and
applicable standards. Appearance or fabrication speed does not
establish compliance.
3. A structural steel plate is marked with a heat number. What is the
primary purpose of this identification?
A. To identify the painting contractor
B. To indicate the date the plate was installed
C. To provide traceability of the material to its manufacturing and
certification records
D. To identify the inspector who approved the plate
Answer: C. To provide traceability of the material to its
manufacturing and certification records
Rationale: Heat numbers provide material traceability. They allow
inspectors and quality personnel to correlate a particular steel product
with mill certifications, chemical and mechanical test information,
2
,purchase documentation, and other required records. Maintaining
traceability is particularly important when multiple steel grades and
heats are present on a project.
4. Why should an inspector compare mill test reports with the
material identification actually stamped or marked on structural
steel?
A. To determine whether the steel is the cheapest available grade
B. To verify that the physical material corresponds to the required
material grade and documented heat
C. To determine whether the steel requires painting
D. To determine the contractor's profit margin
Answer: B. To verify that the physical material corresponds to the
required material grade and documented heat
Rationale: Material certification is meaningful only when the
inspector can establish traceability between the certificate and the
physical steel. Comparing heat numbers, grade markings, dimensions,
and other identification ensures that the material incorporated into the
structure is the material represented by the certification documents.
5. A bolted structural steel connection uses high-strength bolts.
Which condition would be most concerning during inspection?
A. The bolt heads have identical markings
B. The bolts have been stored according to the approved procedure
C. The connection contains bolts that cannot be positively identified or
verified as the specified type
D. The bolts have been installed through properly aligned holes
Answer: C. The connection contains bolts that cannot be positively
identified or verified as the specified type
3
, Rationale: High-strength structural connections depend on using the
specified fastener system. Bolt markings, packaging, certification, lot
identification, storage, installation, and inspection procedures must
support traceability and compliance. An unidentified fastener cannot
simply be assumed to meet the required specification.
6. What is the primary purpose of checking bolt installation in a
high-strength structural connection?
A. To make the connection visually attractive
B. To ensure the required clamping force and connection behavior are
achieved in accordance with the specified installation method
C. To prevent the bolt from ever being removed
D. To make all bolts protrude exactly the same distance regardless of
specification
Answer: B. To ensure the required clamping force and connection
behavior are achieved in accordance with the specified installation
method
Rationale: High-strength bolted connections rely on controlled
installation to achieve the required pretension or specified tightening
condition. The inspector must verify that the appropriate installation
method and inspection procedure have been followed rather than
relying solely on visual tightness.
7. During inspection of a bolted connection, the inspector finds a
bolt with damaged threads extending into the required threaded
engagement area. What should the inspector do?
A. Approve it because the nut is installed
B. Strike the bolt with a hammer until the nut tightens
C. Reject or report the condition in accordance with the project