PROCEDURES, RULES, AND SAFETY
PROTOCOLS EXAM 2026/2027 WITH
QUESTIONS AND EXPERT-VERIFIED
CORRECT ANSWERS | ALREADY
GRADED A+ | GUARANTEED PASS | MTA
CONDUCTOR LATEST EXAM
What are the key differences between New Tech and SMEE procedures? -
ANSWER-SMEE includes checks for Swing sash, Output arm, and a Snap test,
while New Tech includes an adjacent switch check.
What is the memory line for SMEE procedures? - ANSWER-SMEE has the extra
S's: Swing sash and Snap test.
What happens when there are indication problems according to Rule 2.42(c)? -
ANSWER-The train must be removed from service immediately.
, What are the key cases for Rule 2.42(c)? - ANSWER-Train is removed from
service when indication is received with side doors open.
What is the memory chain for the New Tech Door Cut-Out Procedure? -
ANSWER-Car — Side — Panel — Off — Inspect — Debris — Normal —
Observe — OCC or Cut Out — Lights — Adjacent — Document — Board
What does the acronym B-O-D-U-B represent? - ANSWER-Bypass, Opposite,
Doors, Unfit, Brakes (conditions for immediate EBV activation)
What does the acronym L-S-H-A-R represent? - ANSWER-Leaves, Stops, Hard,
Acceleration, Radio (conditions for EBV activation at the next station)
What is the purpose of the EBV? - ANSWER-To operate when certain unsafe train
movements or operational conditions occur.
What is the action taken if the door does not close on its own during the New Tech
procedure? - ANSWER-Manually close the door and rotate the R9 key from
Normal to Off.
What is the first action in the SMEE Door Cut-Out Procedure? - ANSWER-Follow
the same initial light sequence: exterior guard light, interior guard light, fault light.
What must be documented after performing the New Tech Door Cut-Out
Procedure? - ANSWER-Document car number and door panel number.
What is the significance of the R9 key in the procedures? - ANSWER-It is used to
control the mechanical lock/cut-out switch.