• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

CONCRETE FIELD TECHNICIAN PROFICIENCY EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Document preview thumbnail
Preview 3 out of 24 pages

CONCRETE FIELD TECHNICIAN PROFICIENCY EXAM|QUESTIONS AND VERIFIED ANSWERS|NEW UPDATE 2026/2027|GRADED A+

Content preview

CONCRETE FIELD TECHNICIAN PROFICIENCY EXAM|QUESTIONS AND VERIFIED
ANSWERS|NEW UPDATE 2026/2027|GRADED A+


This test method covers obtaining representative samples used for testing to determine compliance
with quality requirements.

CORRECT|ANSWER

ASTM C 172




Larger aggregate removal is achieved by __________.

CORRECT|ANSWER

Wet Sieving




Sample the aggregates according to which ASTM practice?

CORRECT|ANSWER

ASTM D 75




Obtaining the first and final portions of the composite sample shall not exceed_______.

CORRECT|ANSWER

15 Minutes




Slump, Air Entrainment and Temperature are to be started within how many minutes?

CORRECT|ANSWER

5 Minutes

,Start molding strength test specimens within how many minutes after fabricating the final portion of the
composite sample?

CORRECT|ANSWER

15 minutes




Minimum size sample for a strength test specimen?

CORRECT|ANSWER

1 cu./ft.




Sampling from a stationary mixer requires ______ or more portions, regularly spaced intervals, from the
middle portion of the batch.

CORRECT|ANSWER

2




When sampling freshly mixed concrete, do not obtain portions of concrete from __________.

CORRECT|ANSWER

both the beginning and final portions of the batch.




Completely divert the discharge stream or pass a receptacle completely through the discharge stream to
obtain samples of freshly mixed concrete.

CORRECT|ANSWER

True




Sampling from a paving mixer requires ________ or more portions of the discharge pile.

CORRECT|ANSWER

, 5




Two or more regularly spaced portions of the ________ of the batch is required when sampling from a
revolving drum mixer or agitator.

CORRECT|ANSWER

middle portion




Samples are to be obtained before water or admixtures are added to the batch.

CORRECT|ANSWER

False




Sampling from a continuous mixer requires 5 ft³ of discharged concrete before taking how many
portions of concrete?

CORRECT|ANSWER

2 or more




When aggregate exceeds the maximum allowed for the mold or equipment, what is needed to be done?

CORRECT|ANSWER

Wet Sieve




ASTM C-1064 covers the determination of __________ for freshly mixed concrete.

CORRECT|ANSWER

Temperature

Document information

Uploaded on
August 23, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
1
Items
544
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions