NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS WITH ACCURATE ANSWERS A+ Grade

Document preview thumbnail
Preview 2 out of 10 pages

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS WITH ACCURATE ANSWERS A+ Grade NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS WITH ACCURATE ANSWERS A+ Grade

Content preview

NICET LEVEL 1 HIGHWAY CONSTRUCTION
EXAM QUESTIONS WITH ACCURATE ANSWERS
2025\2026 A+ Grade
Acceptance
- accurate answers-The written acceptance by the Department of the Work.

acceptance testing
- accurate answers-Testing conducted by the Department to measure the
degree of compliance to the Contract

actual cost
- accurate answers-The computed cost using calculations provided

addendum
- accurate answers-A Contract revision or response to a Contractor inquiry
issued after advertisement and before the opening of bids.

as-built quantity
- accurate answers-The quantity of a completed Item eligible for payment

authorized funding amount
- accurate answers-The amount of funds authorized by the Department for the
Contract

Bidder
- accurate answers-The individual, firm, partnership, corporation, joint
venture, or any acceptable combination thereof that submits a bid to the
Department.

bridge
- accurate answers-. A structure, other than a culvert, including supports,
erected over a depression or an obstruction, such as water, highway, or
railway, and having a track or passageway for carrying traffic or other moving
loads and having a length 3 measured along the center of the structure of
more than 20 feet between undercopings of abutments or extreme ends of
openings for multiple boxes. Structure dimensions are defined as follows:

, bridge length
- accurate answers-The overall length measured along the line of survey
stationing from back to back of backwalls of abutments, if present, otherwise
end to end of the bridge floor; but, in no case less than the total clear opening
of the structure

bridge width
- accurate answers-The clear width measured at right angles to the
longitudinal centerline of the bridge between the bottom of curbs, or in the
case of multiple height of curbs, between the bottoms of the lower risers or, if
curbs are not used, between inner faces of parapet or railing

Change Order.
- accurate answers-A written order issued by the Department to the
Contractor after execution of the Contract authorizing one or more of the
following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3.
Modifications to Contract Time.

Commercially Useful Function
- accurate answers-Occurrences in which the subcontractor is responsible for
the execution of a distinct element of the work of a contract and carrying out
its responsibilities by actually performing, managing, and supervising the
work involved, and with respect to materials and supplies used on the
contract, prepares the estimate, negotiates price, determines quality and
quantity, orders the material, arranges delivery, installs (where applicable),
and pays for the material and supplies itself for the project.

Completion
- accurate answers-When all of the following have occurred: 1. The Work has
been satisfactorily completed in all respects according to the Contract. 2. The
Project is ready for use by the Department as required by the Contract. 3. The
Contractor has satisfactorily executed and delivered to the RE all documents,
certificates, and proofs of compliance required by the Contract including the
Notice of Completion.

construction operations
- accurate answers-Physical work done in the performance of the Contract
within the Project Limits. Does not include off-site mobilization, procurement
and off-site storage of materials and plants, engineering, performance bond

Document information

Uploaded on
August 23, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
471
Last sold
5 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions