Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

PMT_0170_RISK_MANAGEMENT_EXAM_3_2026_PRACTICE_QUESTIONS_AND_ANSWERS

Document preview thumbnail
Preview 2 out of 9 pages

PMT_0170_RISK_MANAGEMENT_EXAM_3_2026_PRACTICE_QUESTIONS_AND_ANSWERS

Content preview

PMT 0170 RISK MANAGEMENT EXAM 3 2026
PRACTICE QUESTIONS AND ANSWERS TOP
REVIEW A+

◉ Monte Carlo simulations use computational algorithms to
simulate the behavior of various systems in a nondeterministic
manner. Why are these "nondeterministic" results important to
program schedule analysis? Answer: -Because the results show the
average length of the tasks needed to complete the program for the
PM to use when building the schedule
-Because the results show a clear path to project completion for the
program manager (PM) to follow
-Because it means there is no way to tell which way is the correct
way to run the program
-*Because there are one or more points in the simulation where a
choice is made between different paths, without any specific
guidance on which one will be chosen*


◉ Your program includes teams in six different locations. These
teams need access to different pieces of risk monitoring data in
order to monitor, manage, and report risk. Which of the following
risk monitoring tools would be most appropriate? Answer: -Risk
Management (RM) information systems
-Risk reporting matrix (WRONG ANSWER)
-Technical performance measurements (TPMs)

, -Waterfall effect


◉ Based on the results of a simulation, there is a 70% chance that
the project will end two weeks behind schedule. Using the table
provided, what would the cumulative schedule risk be, based on a
two week schedule delay?


Level Probability of Occurrence Schedule Impact
1 0% to 19% 0 to 7 days
2 20% to 39% 8 to 14 days
3 40% to 59% 15 to 21 days
4 60% to 79% 22 to 28 days
5 80% to 100% 29 to 35 days Answer: -Probability 4; Schedule
Impact 4
-Probability 2; Schedule Impact 2
-Probability 2; Schedule Impact 4
-*Probability 4; Schedule Impact 2*


◉ Which of the following are typical sources of framing assumptions
(FAs)? (Select three that apply.) Answer: -*Technological and
engineering challenges*
-*Interdependencies with other programs*
-New acquisition regulations

Document information

Uploaded on
August 22, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
2
Items
51890
Last sold
2 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions