ASPHALT FIELD LEVEL I TEST EXAM WITH
CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS LATEST
ALREADY GRADED A+
Practice questions for this set
Learn 1 /7 Study with Learn
Overheat
Choose an answer
What cannot be done to asphalt so
Hierarchy of construction
1 2 that it is warm upon arrival at the
documents (least to most)
jobsite
Which tack coat can be used year
This truck delivers mix directly into
3 4 round, and must be used from May
the hopper of the paver
through September?
Don't know?
, Terms in this set (35)
Hierarchy of construction Standard drawings, Standard specs,
documents (least to most) Supplemental specs, Plans, Special provisions,
Special provisions copied notes
Which construction documents Supplemental specs
details approved additions and
revisions to the standard spec
This ensures an adequate bond Tack coat
between the existing pavement
surface and the new asphalt overlay
so that slippage and delamination
do not occur
Which tack coat can be used prior Conventional
to May and after September?
Which tack coat can be used year Trackless
round, and must be used from May
through September?
What is the range of proper tack .05 to .10
coat application? (in gal/yd^2)
CORRECT ACTUAL QUESTIONS AND
CORRECTLY WELL DEFINED ANSWERS LATEST
ALREADY GRADED A+
Practice questions for this set
Learn 1 /7 Study with Learn
Overheat
Choose an answer
What cannot be done to asphalt so
Hierarchy of construction
1 2 that it is warm upon arrival at the
documents (least to most)
jobsite
Which tack coat can be used year
This truck delivers mix directly into
3 4 round, and must be used from May
the hopper of the paver
through September?
Don't know?
, Terms in this set (35)
Hierarchy of construction Standard drawings, Standard specs,
documents (least to most) Supplemental specs, Plans, Special provisions,
Special provisions copied notes
Which construction documents Supplemental specs
details approved additions and
revisions to the standard spec
This ensures an adequate bond Tack coat
between the existing pavement
surface and the new asphalt overlay
so that slippage and delamination
do not occur
Which tack coat can be used prior Conventional
to May and after September?
Which tack coat can be used year Trackless
round, and must be used from May
through September?
What is the range of proper tack .05 to .10
coat application? (in gal/yd^2)