Construction Blueprint Reading 16wk Final Exam Review
Study online at https://quizlet.com/_1sbkfw
1. The general contractor is to paint all pavement mark- True
ers solid yellow.
2. Extruded curbs are reinforced with number four rebar False
running continuously.
3. Anchor bolts for exterior pole lights are installed by the True
electrical contractor.
4. The triangle pavement marker for the pick-up window False
is larger than the marker indicating the exit.
5. Footings for trash closure post on the rear wall are 16 False
inches in diameter.
6. Crosshatch grooving is required on all sloped surfaces True
of a sidewalk ramp.
7. The electrical contractor must install 30 feet light poles True
for the exterior pole lights.
8. The steel gate arm for the trash enclosure is 3/8 inch False
by 2 inches by 30 inches
9. Four sections and two elevations are referenced on the False
Standard Trash Enclosure Plan.
10. Exterior pole lights are metal halide vertical fixtures. True
11. Concrete control joints must be sawn within eight False
hours of concrete placement.
12. Three number 4 by 24 inches long rebar are placed True
through exterior door openings.
1/4
Study online at https://quizlet.com/_1sbkfw
1. The general contractor is to paint all pavement mark- True
ers solid yellow.
2. Extruded curbs are reinforced with number four rebar False
running continuously.
3. Anchor bolts for exterior pole lights are installed by the True
electrical contractor.
4. The triangle pavement marker for the pick-up window False
is larger than the marker indicating the exit.
5. Footings for trash closure post on the rear wall are 16 False
inches in diameter.
6. Crosshatch grooving is required on all sloped surfaces True
of a sidewalk ramp.
7. The electrical contractor must install 30 feet light poles True
for the exterior pole lights.
8. The steel gate arm for the trash enclosure is 3/8 inch False
by 2 inches by 30 inches
9. Four sections and two elevations are referenced on the False
Standard Trash Enclosure Plan.
10. Exterior pole lights are metal halide vertical fixtures. True
11. Concrete control joints must be sawn within eight False
hours of concrete placement.
12. Three number 4 by 24 inches long rebar are placed True
through exterior door openings.
1/4