ACM - CORRECT ANSWER✔✔-Greater than 1%
| | | | |
Most common type of asbestos - CORRECT ANSWER✔✔-Chrysotile
| | | | | | |
How many products contain asbestos - CORRECT ANSWER✔✔-3,000
| | | | | | |
Vermiculite - CORRECT ANSWER✔✔-A material that is NOT a type of
| | | | | | | | | | |
asbestos but could have been contaminated when it's mined from the
| | | | | | | | | | |
ground in Libby, Montana.
| | |
Friable - CORRECT ANSWER✔✔-Materials that can be crumbled
| | | | | | | |
pulverized or crushed to a powder using hand pressure when dry
| | | | | | | | | |
Chrysotile mineral group - CORRECT ANSWER✔✔-Serpentine, long and
| | | | | | | |
flexible. White. |
Amosite - CORRECT ANSWER✔✔-Amphibole structure, Brown.
| | | | |
, Cocidolite - CORRECT ANSWER✔✔-Amphibole, Blue.
| | | |
Which is is harder to control - CORRECT ANSWER✔✔-Amphibole- fibers
| | | | | | | | | |
repel water |
Days notice before working a large project to EPA & NYSDOL - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-10 working days | |
Days notice before working a large project to NYCDEP - CORRECT
| | | | | | | | | | |
ANSWER✔✔-7 calendar days | |
Large asbestos project - CORRECT ANSWER✔✔->_260 LF or >_ 160FT^2
| | | | | | | | |
Small asbestos project - CORRECT ANSWER✔✔->25 LF but < 260 LF
| | | | | | | | | |
Minor asbestos project - CORRECT ANSWER✔✔-_< 25LF or _< 10 FT^2
| | | | | | | | | |
ACP-5 form - CORRECT ANSWER✔✔-Asbestos assessment report signed
| | | | | | |
by investigator
| |
ACP-7 - CORRECT ANSWER✔✔-Signed by
| | | | |
1-building owner |
Correct Answers
ACM - CORRECT ANSWER✔✔-Greater than 1%
| | | | |
Most common type of asbestos - CORRECT ANSWER✔✔-Chrysotile
| | | | | | |
How many products contain asbestos - CORRECT ANSWER✔✔-3,000
| | | | | | |
Vermiculite - CORRECT ANSWER✔✔-A material that is NOT a type of
| | | | | | | | | | |
asbestos but could have been contaminated when it's mined from the
| | | | | | | | | | |
ground in Libby, Montana.
| | |
Friable - CORRECT ANSWER✔✔-Materials that can be crumbled
| | | | | | | |
pulverized or crushed to a powder using hand pressure when dry
| | | | | | | | | |
Chrysotile mineral group - CORRECT ANSWER✔✔-Serpentine, long and
| | | | | | | |
flexible. White. |
Amosite - CORRECT ANSWER✔✔-Amphibole structure, Brown.
| | | | |
, Cocidolite - CORRECT ANSWER✔✔-Amphibole, Blue.
| | | |
Which is is harder to control - CORRECT ANSWER✔✔-Amphibole- fibers
| | | | | | | | | |
repel water |
Days notice before working a large project to EPA & NYSDOL - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-10 working days | |
Days notice before working a large project to NYCDEP - CORRECT
| | | | | | | | | | |
ANSWER✔✔-7 calendar days | |
Large asbestos project - CORRECT ANSWER✔✔->_260 LF or >_ 160FT^2
| | | | | | | | |
Small asbestos project - CORRECT ANSWER✔✔->25 LF but < 260 LF
| | | | | | | | | |
Minor asbestos project - CORRECT ANSWER✔✔-_< 25LF or _< 10 FT^2
| | | | | | | | | |
ACP-5 form - CORRECT ANSWER✔✔-Asbestos assessment report signed
| | | | | | |
by investigator
| |
ACP-7 - CORRECT ANSWER✔✔-Signed by
| | | | |
1-building owner |