Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 26 pages
Exam (elaborations)

NCCCO ACTUAL EXAM 1 AND EXAM 2 QUESTIONS AND COMPLETE ANSWERS LATEST UPDATE 2026/2027 GRADED A+ .

Document preview thumbnail
Preview 3 out of 26 pages

1. Where is the best location for leveling a crane CORRECT ANSWER Upperworks 2. When determining the "grossload" the best method is:: Getanaccurateloadweight and add the rigging. 3. By order of hitch strength, which isthe correct answer CORRECT ANSWER Basket,vertical, choker 4. What isthe purpose of using a jib CORRECT ANSWER Increaseheight 5. When taking a side strain on a boom, what concerns the operator most CORRECT ANSWER - Boom damage 6. You should always have at least how many wraps on a hoist drum CORRECT ANSWER 2 7. On a load chart, values above the bold line mean:: Capacities based on structural competence. 8. The primary purpose for a rooster sheave or Auxiliary boom point is to:: Sep-arate the hoist lines. 9. What is the proper procedure when using an insulating link or a boot near power lines CORRECT ANSWER Be sure to maintain the correct allowable distance from the lines. 10. When the number of layers of rope on a drum increases, the CORRECT ANSWER Allowablelinepull decreases. 11. What is the minimum allowable distance from the crane and power lines under 50kV CORRECT ANSWER 10 ft. 12. The term "Upperworks or Superstructure" refer to the area of the crane CORRECT ANSWER - Above the turntable 13. Side loading may be caused by CORRECT ANSWER Starting orstopping the swing too rapidly. 14. What is the best procedure to follow when underground utilities may be present CORRECT ANSWER Contact local utility company 15. Eccentric main boom tip reeving causes CORRECT ANSWER Twistingoftheboom 16. How many randomly broken wires must there be to remove a running wire rope from service CORRECT ANSWER 6 17. When lifting personnel in a man-basket using 6x19 wire rope, the minimum safety factor is CORRECT ANSWER 7 18. What is the safety factor required when using non rotating wire rope and lifting personnel in a man-basket CORRECT ANSWER 10 19. Who has the responsibility for determining the correct weight of a load CORRECT ANSWER - Supervisor 20. When working near power lines, when is a signal person required CORRECT ANSWER Whencrane moves within a boom's length of power lines. 21. When an operator leaves the crane, he must first CORRECT ANSWER Put the load on the ground and put all dogs or pawls in. 22. If replacing the hoist line wire rope on a crane, how do you determine the size of type of wire rope to use CORRECT ANSWER UseManufacturer's operatorsmanual orload chart. 23. After the crane has been checked out and before crane lift operations begin, the crew should CORRECT ANSWER Have a pre-liftmeeting 24. According to ANSI B30.5 personnel platform lifts should not be made with wind in excess of CORRECT ANSWER 20mph 25. When is it safe to work closer than the allowable distance from power lines CORRECT ANSWER When utility company say the lines are de-energized 26. During setup, how do you determine machine clearances (counterweight, boom, outrigger) CORRECT ANSWER Measure for correct distances 27. When operating a crawler crane what is the most unstable allowable quad-rant of operation CORRECT ANSWER Side 28. When operating a truck crane what is the most unstable allowable quadrant of operations CORRECT ANSWER Front 29. What is not a good location

Content preview

NCCCO ACTUAL
EXAM 1 AND EXAM 2
QUESTIONS AND COMPLETE
ANSWERS LATEST UPDATE
2026/2027
GRADED A+ .

,1. Where is the best location for leveling a crane ✓✓ CORRECT ANSWER Upperworks

2. When determining the "gross load" the best method is:: Get an accurate load weight and add the rigging.

3. By order of hitch strength, which is the correct answer ✓✓ CORRECT ANSWER Basket, vertical, choker

4. What is the purpose of using a jib ✓✓ CORRECT ANSWER Increase height

5. When taking a side strain on a boom, what concerns the operator most ✓✓ CORRECT ANSWER -

Boom damage

6. You should always have at least how many wraps on a hoist drum ✓✓ CORRECT ANSWER 2

7. On a load chart, values above the bold line mean:: Capacities based on structural competence.

8. The primary purpose for a rooster sheave or Auxiliary boom point is to:: Sep-arate the hoist lines.

9. What is the proper procedure when using an insulating link or a boot near power lines ✓✓ CORRECT ANSWER Be
sure to maintain the correct allowable distance from the lines.

10. When the number of layers of rope on a drum increases, the ✓✓ CORRECT ANSWER Allowable line pull decreases.

11. What is the minimum allowable distance from the crane and power lines under 50kV ✓✓ CORRECT
ANSWER 10 ft.

12. The term "Upperworks or Superstructure" refer to the area of the crane ✓✓ CORRECT ANSWER -

Above the turntable

13. Side loading may be caused by ✓✓ CORRECT ANSWER Starting or stopping the swing too rapidly.

14. What is the best procedure to follow when underground utilities may be present ✓✓ CORRECT ANSWER
Contact local utility company

15. Eccentric main boom tip reeving causes ✓✓ CORRECT ANSWER Twisting of the boom

16. How many randomly broken wires must there be to remove a running wire rope from service ✓✓
CORRECT ANSWER 6

17. When lifting personnel in a man-basket using 6x19 wire rope, the minimum safety factor is ✓✓ CORRECT
ANSWER 7

18. What is the safety factor required when using non rotating wire rope and lifting personnel in a man-basket
✓✓ CORRECT ANSWER 10

19. Who has the responsibility for determining the correct weight of a load ✓✓ CORRECT ANSWER -

, Supervisor

20. When working near power lines, when is a signal person required ✓✓ CORRECT ANSWER When crane moves
within a boom's length of power lines.

21. When an operator leaves the crane, he must first ✓✓ CORRECT ANSWER Put the load on the ground and put all dogs or pawls
in.

22. If replacing the hoist line wire rope on a crane, how do you determine the size of type of wire rope to use ✓✓
CORRECT ANSWER Use Manufacturer's operators manual or load chart.

23. After the crane has been checked out and before crane lift operations begin, the crew should ✓✓
CORRECT ANSWER Have a pre-lift meeting

24. According to ANSI B30.5 personnel platform lifts should not be made with wind in excess of ✓✓
CORRECT ANSWER 20 mph

25. When is it safe to work closer than the allowable distance from power lines ✓✓ CORRECT ANSWER When
utility company say the lines are de-energized

26. During setup, how do you determine machine clearances (counterweight, boom, outrigger) ✓✓ CORRECT
ANSWER Measure for correct distances

27. When operating a crawler crane what is the most unstable allowable quad-rant of operation ✓✓ CORRECT
ANSWER Side

28. When operating a truck crane what is the most unstable allowable quadrant of operations ✓✓ CORRECT
ANSWER Front

29. What is not a good location for crane setup ✓✓ CORRECT ANSWER Above utilities

30. When should a tagline be used ✓✓ CORRECT ANSWER When rotation of load would be dangerous

31. When an operator arrives at a jobsite and the crane is already erected, how would the operator check the main
and auxiliary hoist brakes ✓✓ CORRECT ANSWER Lift the load ott the ground and apply the brake

32. What is the distance between an Anti-two-block warning device and an Anti-two block prevention system ✓✓
CORRECT ANSWER Warning device only warns, but prevention system will stop the operation

33. Who gives the operator hand signals ✓✓ CORRECT ANSWER The person assigned prior to the lift

34. Why use mats or cribbing ✓✓ CORRECT ANSWER To reduce ground pressure

35. Tipping capacities of crawler cranes are based on what percentage of tipping ✓✓ CORRECT
ANSWER 75%

Document information

Uploaded on
August 19, 2026
Number of pages
26
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lectdenis
3.7
(301)
Sold
2087
Followers
1591
Items
6763
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions