ICC Test
- ANS-
100 dispenser containment is required for A underground storage tank systems - ANS-All
A UST service technician must be recertified by the equipment manufacturer at the time interval
recommended by the equipment manufacture or at-least every what months - ANS-36
A_____is installed on the vent riser to prevent vapors from escaping or entering the system,
unless a pressure or vacuum condition exists that exceeds that design opening pressure or
vacuum limit of the cap - ANS-P/V Cap
According to ccr title 23UST regulations a spell container must have a minimum capacity of
what gallons - ANS-Five gallons
According to CCR title 23UST regulations spill containment must meet all of the following
requirements except - ANS-Be installed on vent riser
According to CCR title 23UST regulations what is the frequency the monitor certification must be
performed - ANS-Every 12 months or annually
According to the ccr title 23 UST regulations a monitoring equipment certification must be
documented using a - ANS-Monitoring system certification form
According to the health and safety code, Tanks installed after July 1, 2003 require a one time
test at installation to determine that the tank is product tight. acceptable methods are -
ANS-inert gas pressure test
Air monitoring must be conducted when performing work within a confined space - ANS-prior to
and during
All of the following are true for ATG except for - ANS-ATG system are required to be installed in
all UST system
All of the following licenses allow An individual to perform a secondary containment Testing
except - ANS-C10 electrical contractor
All of the following must be included VST monitor system certification except the -
ANS-fuctionality of flapper were ball
- ANS-
100 dispenser containment is required for A underground storage tank systems - ANS-All
A UST service technician must be recertified by the equipment manufacturer at the time interval
recommended by the equipment manufacture or at-least every what months - ANS-36
A_____is installed on the vent riser to prevent vapors from escaping or entering the system,
unless a pressure or vacuum condition exists that exceeds that design opening pressure or
vacuum limit of the cap - ANS-P/V Cap
According to ccr title 23UST regulations a spell container must have a minimum capacity of
what gallons - ANS-Five gallons
According to CCR title 23UST regulations spill containment must meet all of the following
requirements except - ANS-Be installed on vent riser
According to CCR title 23UST regulations what is the frequency the monitor certification must be
performed - ANS-Every 12 months or annually
According to the ccr title 23 UST regulations a monitoring equipment certification must be
documented using a - ANS-Monitoring system certification form
According to the health and safety code, Tanks installed after July 1, 2003 require a one time
test at installation to determine that the tank is product tight. acceptable methods are -
ANS-inert gas pressure test
Air monitoring must be conducted when performing work within a confined space - ANS-prior to
and during
All of the following are true for ATG except for - ANS-ATG system are required to be installed in
all UST system
All of the following licenses allow An individual to perform a secondary containment Testing
except - ANS-C10 electrical contractor
All of the following must be included VST monitor system certification except the -
ANS-fuctionality of flapper were ball