Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Dates & Time Lengths UST Exam Questions | Study Guide & Practice Test

Document preview thumbnail
Preview 2 out of 13 pages

Dates & Time Lengths UST Exam study resource featuring practice questions and answers focused on key dates, time periods, deadlines, testing requirements, and regulatory concepts related to UST certification and underground storage tank operations.

Content preview

Dates & Time Lengths - UST Exam
47.) Within _____ calendar days of receiving an inspection report from either the local agency or
the special inspector, the permit holder shall implement the corrections specified in the
inspection report.
a.) 30
b.) 45
c.) 60
d.) 15 - ANS-a.) 30
CCR Title 23, Sec 2712(f)

A service technician has performed calibration and maintenance on an ATG probe; this
maintenance record must be kept on file for ______________.
a.) 6.5 years
b.) 3 years
c.) 5 years
d.) Life of the UST system - ANS-c.) 5 years
CCR Title 23, Sec 2712(b)

A tank integrity test is required every _____ when statistical inventory reconciliation is used.
a.) 2 years
b.) Year
c.) 3 years
d.) Never - ANS-a.) 2 years
CCR Title 23, Sec 2643(b)(3)

A UST Owner or operator shall maintain a copy of the designated operator's monthly inspection
record and all attachments for the previous
a. 1 Month
b. 12 months
c. 36 month
d. 60 months - ANS-b. 12 months
CCR; 2715 (e)

According to California Law, UST systems installed after July 1, 2003, require a one-time ELD
test to ensure that the tank is product tight...
a.) If the tank is located within one (1) mile of a public drinking water well
b.) If the tank is located within 1000 feet of a public drinking water well
c.) Unless the tank is equipped with secondary containment
d.) In all cases - ANS-For ALL tanks before use (H&SC 25290.2 (I))d.) In all casesH&SC, Sec
25290.2(i)

, According to Title 23, CCR, UST Regulations, results of the tank tightness testing used to
monitor the tank must be retained for what period of time?
a. For a period of 3 years
b. For the life of the facility
c. Until the next tightness test is conducted
d. Until you are sure a release has not occurred - ANS-a. For a period of 3 years
CCR; 2712

Additional pressurized piping monitoring options become effective November 9, 2004. Which of
the following will not be a monitoring requirement for non-emergency generator, double wall,
pressurized product piping after November 9, 2004?
a. Continuous monitoring system that either activates an audible and visual alarm or stops the
flow of product at the dispenser when it detects a leak for all secondary containment, including
under-dispenser containment.
b. A 3.0-gph automatic line leak detector must be installed.
c. An annual 0.1 piping test or positive pump shut-down and fail safe for all secondary
containment, except for the UDC monitoring.
d. An annual 0.1 piping test or a monthly 0.2 gph pipe must be conducted. - ANS-d. An annual
0.1 piping test or a monthly 0.2 gph pipe must be conducted.
CCR; 2626 (f) (monthly 0.2 gph is not authorized)

All of the following are conditions of an UST operating permit, EXCEPT
a. UST owner or operator must comply with release reporting & recording requirements in 23
CCR, Article 5
b. Results of local agency inspections must be maintained for three years.
c. Written performance claims must be maintained for 5 years.
d. Monitoring & maintenance records must be maintained for at least three years.
e. Records of repairs, lining and upgrades must be maintained for the life of the tank - ANS-b.
Results of local agency inspections must be maintained for three years.
CCR; 2712 (a) &(b)

All of the following are correct for single wall, pressurized, gasoline piping after December 22,
1998, EXCEPT?
a. It must be monitored by an annual 0.1 gph test or monthly 0.2 gph test
b. It must be also be monitored by an hourly 3.0 gph test
c. The 3.0 gph monitoring shall restrict fuel flow or initiate an alarm if an unauthorized release
occurs.
d. The 3.0 gph monitoring shall shut down the pump if it fails or is disconnected. - ANS-c. The
3.0 gph monitoring shall restrict fuel flow or initiate an alarm if an unauthorized release occurs.
CCR; 2643 (c) & 2666

All of the following are correct regarding when secondary containment must be tested,
EXCEPT?
a. Secondary containment systems must be tested every 36 months.

Document information

Uploaded on
August 19, 2026
Number of pages
13
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nurshingschools
3.0
(3)
Sold
1247
Followers
1
Items
553
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions