A written statement indicating SIR results must be submitted to the ____every____ - ANS-Local
agency , 12 months
According to EO VR 101 E maintance records are required to include? - ANS-Name and
designated UST operator .
According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? -
ANS-Depended filter seal damage
According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle the
following test must be conducted ? - ANS-Nozzle dispensing shut off test
According to Healy EO VR 201 A a vapor recovery record are to be maintained by? -
ANS-Gasoline dispensing facility operator
(GDF)
According to PEI RP 300 a combustible gas can be used to ? - ANS-Detect vapor leaks in a
vapor recovery system.
According to PEI RP 300 as built drawing or pictures of the underground pipping and other
components shall be ? - ANS-Maintained as long as UST is in service
According to PEI RP 300 the following method of documenting piping location is NOT to ? -
ANS-Sketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300. A written scope of work for vapor recovery installation should include?
- ANS-Construction plans
According to the health and safety code the owner of a new tank must conduct a one time ELD
test if the tank is located within 1000 ft of a public drinking water well. This test must
accomplished by ? - ANS-January 1, 2005
According to title 23; the following piping components if installed after July 1 1987 must have
secondary containment - ANS-Pressured product piping
According to VR 201 A Breakaway reconnection must be ? - ANS-Logged in GDF log
An approved method for non visual monitoring for existing UST systems. - ANS-Statistical
Inventory Reconciliation (SIR)
, An unauthorized release which does not escape secondary containment, requires only
recordation on the Operators Manual Report provided. - ANS-It did not cause deterioration of
secondary containment.
It did not increase the hazard of fire.
It was cleaned up within eight hours addicti it was cleaned up within eight hours detection.
ATG must be capable for detecting a release of ? - ANS-.2 gallons per hour
ATG should be programmed to test the tank ? - ANS-At least monthly
Automatic line leak detectors installed on underground piping with secondary containment shall
be capable of tetecting a leak of ? - ANS-3 gallons per hour at 10 psi
Cathodic protection systems must be tested within ____Months of installation and every
____months thereafter. - ANS-6, 36
Considered "pipe" on tanks installed after July 1 2003 - ANS-Pressured product piping and
below ground vapor recovery
Enhanced the detections results must be submitted to ___ within ___days - ANS-The local
agency and State water resources control Board.
60
how many feet within a public drinking well require an enhanced leak detection test - ANS-1000
feet
ICC cert must be renewed every? - ANS-24 months
If An authorize release meets reporting requirements of title 23 section 2652 the report must be
filed within the? - ANS-Local agency
If an unauthorized product release meets the requirements for reporting to the local agency,
verbal notification must be made within ____hours, followed by a written notification within
____days. - ANS-24, 5
If equipped with an over fill alarm, it must be located? - ANS-So it can be seen or heard from the
delivery location.
If installed, the following requires independent 3rd party certification to prove compliance with
established regulations. - ANS-Automatic Tank Gauge
Liquid Product Detectors
SIR
A written statement indicating SIR results must be submitted to the ____every____ - ANS-Local
agency , 12 months
According to EO VR 101 E maintance records are required to include? - ANS-Name and
designated UST operator .
According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? -
ANS-Depended filter seal damage
According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle the
following test must be conducted ? - ANS-Nozzle dispensing shut off test
According to Healy EO VR 201 A a vapor recovery record are to be maintained by? -
ANS-Gasoline dispensing facility operator
(GDF)
According to PEI RP 300 a combustible gas can be used to ? - ANS-Detect vapor leaks in a
vapor recovery system.
According to PEI RP 300 as built drawing or pictures of the underground pipping and other
components shall be ? - ANS-Maintained as long as UST is in service
According to PEI RP 300 the following method of documenting piping location is NOT to ? -
ANS-Sketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300. A written scope of work for vapor recovery installation should include?
- ANS-Construction plans
According to the health and safety code the owner of a new tank must conduct a one time ELD
test if the tank is located within 1000 ft of a public drinking water well. This test must
accomplished by ? - ANS-January 1, 2005
According to title 23; the following piping components if installed after July 1 1987 must have
secondary containment - ANS-Pressured product piping
According to VR 201 A Breakaway reconnection must be ? - ANS-Logged in GDF log
An approved method for non visual monitoring for existing UST systems. - ANS-Statistical
Inventory Reconciliation (SIR)
, An unauthorized release which does not escape secondary containment, requires only
recordation on the Operators Manual Report provided. - ANS-It did not cause deterioration of
secondary containment.
It did not increase the hazard of fire.
It was cleaned up within eight hours addicti it was cleaned up within eight hours detection.
ATG must be capable for detecting a release of ? - ANS-.2 gallons per hour
ATG should be programmed to test the tank ? - ANS-At least monthly
Automatic line leak detectors installed on underground piping with secondary containment shall
be capable of tetecting a leak of ? - ANS-3 gallons per hour at 10 psi
Cathodic protection systems must be tested within ____Months of installation and every
____months thereafter. - ANS-6, 36
Considered "pipe" on tanks installed after July 1 2003 - ANS-Pressured product piping and
below ground vapor recovery
Enhanced the detections results must be submitted to ___ within ___days - ANS-The local
agency and State water resources control Board.
60
how many feet within a public drinking well require an enhanced leak detection test - ANS-1000
feet
ICC cert must be renewed every? - ANS-24 months
If An authorize release meets reporting requirements of title 23 section 2652 the report must be
filed within the? - ANS-Local agency
If an unauthorized product release meets the requirements for reporting to the local agency,
verbal notification must be made within ____hours, followed by a written notification within
____days. - ANS-24, 5
If equipped with an over fill alarm, it must be located? - ANS-So it can be seen or heard from the
delivery location.
If installed, the following requires independent 3rd party certification to prove compliance with
established regulations. - ANS-Automatic Tank Gauge
Liquid Product Detectors
SIR