PMT 3600V EXAM 3 ADVANCED
PROJECT MANAGEMENT QUESTIONS
AND ANSWERS



1. When calculating the Late Finish (LF) of an activity during a backward pass in the Critical

Path Method, which value is used?

A. The largest Late Start (LS) of all succeeding activities


B. The smallest Late Start (LS) of all succeeding activities


C. The largest Early Finish (EF) of all preceding activities


D. The smallest Early Finish (EF) of all preceding activities


Answer: B


Conceptual Explanation: In a backward pass, the Late Finish (LF) of an activity is equal to

the smallest (earliest) Late Start (LS) of its immediate successors to ensure the project

completion date is not delayed.


2. A project manager is considering a contract for a project with high uncertainty. Which

contract type places the most risk on the seller?

A. Cost Plus Fixed Fee (CPFF)


B. Cost Plus Incentive Fee (CPIF)

,C. Time and Materials (T&M)


D. Firm Fixed Price (FFP)


Answer: D


Conceptual Explanation: Firm Fixed Price (FFP) contracts place the maximum risk on the

seller because they are responsible for all cost overruns regardless of the actual costs

incurred.


3. If a project has an Optimistic time of 10 days, a Pessimistic time of 22 days, and a Most

Likely time of 13 days, what is the PERT (Beta distribution) duration?

A. 13 days


B. 14 days


C. 15 days


D. 16 days


Answer: B


Conceptual Explanation: PERT formula: (O + 4M + P) / 6. Calculation: (10 + 4*13 + 22) / 6

= (10 + 52 + 22) / 6 = = 14 days.


4. Which risk response strategy is being used when a project manager purchases insurance to

cover potential equipment failure?

A. Mitigate


B. Avoid

, C. Accept


D. Transfer


Answer: D


Conceptual Explanation: Transferring risk involves shifting the impact of a threat and

ownership of the response to a third party, such as an insurance company.


5. In the context of Resource Management, what is the primary difference between Resource

Leveling and Resource Smoothing?

A. There is no difference; they are synonymous.


B. Smoothing can change the critical path; Leveling does not.


C. Leveling only applies to human resources; Smoothing applies to materials.


D. Leveling can change the critical path; Smoothing does not.


Answer: D


Conceptual Explanation: Resource Leveling adjusts start and finish dates based on

resource constraints and can extend the critical path. Resource Smoothing adjusts activities

within their float and does not affect the critical path.


6. What is the standard deviation of an activity with a Pessimistic time of 30 and an

Optimistic time of 12?

A. 18


B. 6

Document information

Uploaded on
August 19, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Thebright
3.6
(44)
Sold
234
Followers
6
Items
14496
Last sold
3 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions