Construction Project Management Exam 1
(New 2026/ 2027 Update) Questions &
Answers {Grade A} 100% Correct (Verified
Solutions)
Name 5 types of information provided on a product data submittal. - Correct answer
Manufacturer, trade name, model or type #.
Description of use and performance characteristics.
Size and physical characteristics.
finish characteristics.
Request for jobsite dimensions.
What is the purpose of Product Data, Submittals, Samples, and Shop drawings? -
Correct answer For the Architect/Engineer to verify the correct products and
equipment will be installed on the project.
Selection of colors, patterns, types of materials, verification of details, furnishing of
dimensions.
, What information would be included in a Procurement
Schedule? - Correct answer Selection number, item description, dates.
To Contractor, to Architect, order, delivery.
Procurement Schedule - Correct answer A schedule of approvals and delivery dates
for each submittal and material.
What are 2 purposes of the Shop Drawings, other than for Architect/Engineer
approval? - Correct answer Information for fabrication of the items.
Information for placement of the items at the job site.
What does AIA stand for? - Correct answer American Institute of Architects
Who envisions the project design? Where is it transmitted? - Correct answer The
Architect/Engineer envisions the project design and then it is transmitted to the
contractor.
What does Construction Documents Describe? - Correct answer Nature of the Project.
(New 2026/ 2027 Update) Questions &
Answers {Grade A} 100% Correct (Verified
Solutions)
Name 5 types of information provided on a product data submittal. - Correct answer
Manufacturer, trade name, model or type #.
Description of use and performance characteristics.
Size and physical characteristics.
finish characteristics.
Request for jobsite dimensions.
What is the purpose of Product Data, Submittals, Samples, and Shop drawings? -
Correct answer For the Architect/Engineer to verify the correct products and
equipment will be installed on the project.
Selection of colors, patterns, types of materials, verification of details, furnishing of
dimensions.
, What information would be included in a Procurement
Schedule? - Correct answer Selection number, item description, dates.
To Contractor, to Architect, order, delivery.
Procurement Schedule - Correct answer A schedule of approvals and delivery dates
for each submittal and material.
What are 2 purposes of the Shop Drawings, other than for Architect/Engineer
approval? - Correct answer Information for fabrication of the items.
Information for placement of the items at the job site.
What does AIA stand for? - Correct answer American Institute of Architects
Who envisions the project design? Where is it transmitted? - Correct answer The
Architect/Engineer envisions the project design and then it is transmitted to the
contractor.
What does Construction Documents Describe? - Correct answer Nature of the Project.