API 1169 STUDY GUIDE || WITH CERTIFIED ANSWERS.
OSHA 1910 correct answers ______ document has the largest PPE section and safety definitions
OSHA 1926 correct answers _______ document has construction safety, safety focused on eye
and face protection, excavation safety, scaffolds, cranes riggings, use of explosives'
33 CFR 321 correct answers ______ document covers Dams/ Dikes, very infrequently used, very
short and you will quickly be able to find what you need
49 CFR correct answers ____ document has hazardous materials tables, hazardous shipping
tables
49 CFR 192 correct answers ______ document covers Natural Gas Pipelines
49 CFR 195 correct answers _____ document covers Hazardous liquids pipelines, Welding,
pressure tests, bending, defect repair
50 CFR 21 correct answers _____ document covers Migratory Birds
stop all work and notify proper authority/ Do not touch the species correct answers if you see a
nest/ birds, what is the proper action to take?
Endangered Species Act correct answers _____ document should be used when a question refers
to · Endangered Species
FERC Upland correct answers _____ document should be used for erosion control, top soil,
seeding and restoration for "uplands" / things not wetlands
,FERC Wetland/ Water bodies correct answers _____ document should be used for Wetland and
waterbody crossing regulation & What to do when dewatering, draining water, ect..
table correct answers If they ask you about something specific, (such as what is the top edge
height of a top rail), look for a _______in that section, the answer in the text is very likely
somewhere in a 3 page range of it
Employees and Employers correct answers OSHA almost exclusively mentions _____ & ______
Survey right of way -> (Land clearing -> erosion Control Installation) -> Right of way leveling->
pipeline work-> backfill-> restoration correct answers what is the order of the procedure of
pipeline construction?
correct answers If we are w/in 50ft of a populated place/ gathering place/ dwelling, CFR
195.210 says you must add ____inches of additional cover
two (2) correct answers in stationing there is ALWAYS how many digits after the "+" sign ?
143+52, 0+10 correct answers Make the following into station makers: 14352 ft, 10ft
3ft, 1000ft correct answers make the following from station markers into regular feet: 0+03,
10+00
white correct answers what color is proposed excavation?
temp survey markers/ right of way boundaries correct answers what does pink colored markings
represent?
electric power, cables, conduit, lighting cables, cathodic protection correct answers what does red
colored markings represent?
,Gas, Oil, Steam, Petroleum or Gaseous Materials correct answers what does yellow colored
markings represent?
communications, alarm or signal lines correct answers what does orange colored markings
represent?
potable water correct answers what color does blue markings represent?
reclaimed water, irrigation & slurry lines correct answers what color does purple markings
represent?
sewer and drainage lines correct answers what color does green markings represent?
mark up of how the project was built was different from the IFC drawing correct answers what
are "red line drawings"?
Management change process correct answers Red line drawings are an example of ___?
width of facility (pipe) + 18" on either side on correct answers what is the tolerance zone
48" (12" pipe +18" +18") correct answers what would the tolerance zone be for a 12" pipe?
line list correct answers Access on the road from here to here, Don't use my driveway, Don't cut
down this tree, Special land owner agreements, are all example of items on the _______
state, federal, local regulation, personal specification correct answers whatever is on the line list
overrides ________
, the inspectors correct answers it is __________'s responsibility to collect all calibration records
for any and all equipment that needs to be calibrated,
you must mark the centerline of the proposed crossing with a Cross Lath (a cross) with company
specific color and facility size correct answers ·When you are crossing an existing utility, what
must you mark?
heavily vegetated correct answers Ensure flagging is placed more heavily in _____ areas
specified intervals, bends, more correct answers Stakes shall be placed at a _________ along
pipe ditches, except along _____, where the stakes shall be placed ____frequently
contour changes correct answers Ensure_______are captured by survey when you're
Horizontally directionally drilled
spoils, soils correct answers when clearing and grading, the _____ should be separated from the
______
ground disturbance correct answers Topsoil removal is considered ____________
the movement of vehicles, live stock, ect correct answers Topsoil shall be staged to allow for
____________
12", FERC Upland correct answers At least ________ of topsoil shall be removed and segregate/
stock pile separately, per what reference document?
workmanship, daily correct answers Inspectors are required to monitor ______ and report on
progress ______
-overhead wire mark outs
OSHA 1910 correct answers ______ document has the largest PPE section and safety definitions
OSHA 1926 correct answers _______ document has construction safety, safety focused on eye
and face protection, excavation safety, scaffolds, cranes riggings, use of explosives'
33 CFR 321 correct answers ______ document covers Dams/ Dikes, very infrequently used, very
short and you will quickly be able to find what you need
49 CFR correct answers ____ document has hazardous materials tables, hazardous shipping
tables
49 CFR 192 correct answers ______ document covers Natural Gas Pipelines
49 CFR 195 correct answers _____ document covers Hazardous liquids pipelines, Welding,
pressure tests, bending, defect repair
50 CFR 21 correct answers _____ document covers Migratory Birds
stop all work and notify proper authority/ Do not touch the species correct answers if you see a
nest/ birds, what is the proper action to take?
Endangered Species Act correct answers _____ document should be used when a question refers
to · Endangered Species
FERC Upland correct answers _____ document should be used for erosion control, top soil,
seeding and restoration for "uplands" / things not wetlands
,FERC Wetland/ Water bodies correct answers _____ document should be used for Wetland and
waterbody crossing regulation & What to do when dewatering, draining water, ect..
table correct answers If they ask you about something specific, (such as what is the top edge
height of a top rail), look for a _______in that section, the answer in the text is very likely
somewhere in a 3 page range of it
Employees and Employers correct answers OSHA almost exclusively mentions _____ & ______
Survey right of way -> (Land clearing -> erosion Control Installation) -> Right of way leveling->
pipeline work-> backfill-> restoration correct answers what is the order of the procedure of
pipeline construction?
correct answers If we are w/in 50ft of a populated place/ gathering place/ dwelling, CFR
195.210 says you must add ____inches of additional cover
two (2) correct answers in stationing there is ALWAYS how many digits after the "+" sign ?
143+52, 0+10 correct answers Make the following into station makers: 14352 ft, 10ft
3ft, 1000ft correct answers make the following from station markers into regular feet: 0+03,
10+00
white correct answers what color is proposed excavation?
temp survey markers/ right of way boundaries correct answers what does pink colored markings
represent?
electric power, cables, conduit, lighting cables, cathodic protection correct answers what does red
colored markings represent?
,Gas, Oil, Steam, Petroleum or Gaseous Materials correct answers what does yellow colored
markings represent?
communications, alarm or signal lines correct answers what does orange colored markings
represent?
potable water correct answers what color does blue markings represent?
reclaimed water, irrigation & slurry lines correct answers what color does purple markings
represent?
sewer and drainage lines correct answers what color does green markings represent?
mark up of how the project was built was different from the IFC drawing correct answers what
are "red line drawings"?
Management change process correct answers Red line drawings are an example of ___?
width of facility (pipe) + 18" on either side on correct answers what is the tolerance zone
48" (12" pipe +18" +18") correct answers what would the tolerance zone be for a 12" pipe?
line list correct answers Access on the road from here to here, Don't use my driveway, Don't cut
down this tree, Special land owner agreements, are all example of items on the _______
state, federal, local regulation, personal specification correct answers whatever is on the line list
overrides ________
, the inspectors correct answers it is __________'s responsibility to collect all calibration records
for any and all equipment that needs to be calibrated,
you must mark the centerline of the proposed crossing with a Cross Lath (a cross) with company
specific color and facility size correct answers ·When you are crossing an existing utility, what
must you mark?
heavily vegetated correct answers Ensure flagging is placed more heavily in _____ areas
specified intervals, bends, more correct answers Stakes shall be placed at a _________ along
pipe ditches, except along _____, where the stakes shall be placed ____frequently
contour changes correct answers Ensure_______are captured by survey when you're
Horizontally directionally drilled
spoils, soils correct answers when clearing and grading, the _____ should be separated from the
______
ground disturbance correct answers Topsoil removal is considered ____________
the movement of vehicles, live stock, ect correct answers Topsoil shall be staged to allow for
____________
12", FERC Upland correct answers At least ________ of topsoil shall be removed and segregate/
stock pile separately, per what reference document?
workmanship, daily correct answers Inspectors are required to monitor ______ and report on
progress ______
-overhead wire mark outs