SAFE PRACTITIONER 6.0 FINAL PAPER
VERIFIED QUESTIONS WITH DETAILED
SOLUTIONS AND ACCURATE ANSWERS
GRADED A+
⩥ When is the System Demo conducted during Program Execution?
Answer: at the end of every iteration
⩥ In SAFe®, which two items belong in the Team Backlog? (Choose
two.)
Answer: Spikes + User stories
⩥ The Product Owner is involved in which activity?
Answer: ART sync
⩥ PI Planning is to an Agile Release Train as an Interation is to
Answer: the Agile Team
⩥ PI Planning is
Answer: a timebox where ARTs deliver incremental value in the form of
working, tested software and systems - planning, building, validating a
full system increment, demonstrating value, and getting fast feedback.
,⩥ PIs are how long
Answer: 8 - 12 weeks
⩥ Common pattern for PI is
Answer: PI is initated by a PI planning event and then four execution
iterations, then one IP (innovation) iteration
⩥ Each PI applies cadence and synchronization to
Answer: 1. plan the ART's next increment of work 2. limit work in
process (WIP) 3. summarize newsworthy value for feedback 4. assure
consistent, ART wide retrospectives
⩥ Plan Do Check Adjust
Answer: Plan - PI planning event is Do - PI execution Check - system
demo Adjust - inspect and adapt
⩥ Benefit of having smaller batch sizes
Answer: to ensure a higher throughput with lower variability
⩥ benefit of normalized story point estimating
Answer: it provides the economic basis for estimating within and across
programs
, ⩥ what is a key concept behind agile
Answer: value and quality driven
⩥ three elements make up a program board
Answer: features, milestone, dependencies
⩥ how should user stories be written
Answer: as a...i want...so that
⩥ which baglog contains user stories a team may be working on
Answer: team backlog
⩥ If the PI System Demo shows the current state of the Solution, then
who is this demo intended for?
Answer: The Product Owner
The Business Owners
The Scrum Masters
The Agile Team
⩥ What is typically included in the definition of done for the team
increment?
VERIFIED QUESTIONS WITH DETAILED
SOLUTIONS AND ACCURATE ANSWERS
GRADED A+
⩥ When is the System Demo conducted during Program Execution?
Answer: at the end of every iteration
⩥ In SAFe®, which two items belong in the Team Backlog? (Choose
two.)
Answer: Spikes + User stories
⩥ The Product Owner is involved in which activity?
Answer: ART sync
⩥ PI Planning is to an Agile Release Train as an Interation is to
Answer: the Agile Team
⩥ PI Planning is
Answer: a timebox where ARTs deliver incremental value in the form of
working, tested software and systems - planning, building, validating a
full system increment, demonstrating value, and getting fast feedback.
,⩥ PIs are how long
Answer: 8 - 12 weeks
⩥ Common pattern for PI is
Answer: PI is initated by a PI planning event and then four execution
iterations, then one IP (innovation) iteration
⩥ Each PI applies cadence and synchronization to
Answer: 1. plan the ART's next increment of work 2. limit work in
process (WIP) 3. summarize newsworthy value for feedback 4. assure
consistent, ART wide retrospectives
⩥ Plan Do Check Adjust
Answer: Plan - PI planning event is Do - PI execution Check - system
demo Adjust - inspect and adapt
⩥ Benefit of having smaller batch sizes
Answer: to ensure a higher throughput with lower variability
⩥ benefit of normalized story point estimating
Answer: it provides the economic basis for estimating within and across
programs
, ⩥ what is a key concept behind agile
Answer: value and quality driven
⩥ three elements make up a program board
Answer: features, milestone, dependencies
⩥ how should user stories be written
Answer: as a...i want...so that
⩥ which baglog contains user stories a team may be working on
Answer: team backlog
⩥ If the PI System Demo shows the current state of the Solution, then
who is this demo intended for?
Answer: The Product Owner
The Business Owners
The Scrum Masters
The Agile Team
⩥ What is typically included in the definition of done for the team
increment?