1–50: Business, Contracts, Estimating, and Project Administration
1. What is the primary purpose of a written construction contract?
A. To eliminate the need for plans
B. To establish the rights and obligations of the parties
C. To guarantee the contractor a profit
D. To eliminate inspections
Answer: B. To establish the rights and obligations of the parties
Rationale: A written construction contract establishes the scope of
work, payment terms, responsibilities, schedule, and other obligations
of the owner and contractor.
2. Which document generally describes the technical requirements
and quality standards for construction materials and workmanship?
A. Daily report
B. Pay application
C. Specifications
D. Purchase order
Answer: C. Specifications
,Rationale: Specifications provide detailed requirements for materials,
products, workmanship, installation, testing, and performance that
supplement the drawings.
3. What is the main purpose of construction drawings?
A. To document employee attendance
B. To graphically communicate the design and construction
requirements
C. To calculate payroll taxes
D. To replace the construction contract
Answer: B. To graphically communicate the design and construction
requirements
Rationale: Construction drawings communicate dimensions, locations,
relationships, assemblies, and other design information needed to
construct the project.
4. A contractor discovers that the plans conflict with the written
specifications. What is generally the best initial action?
A. Ignore the conflict
B. Proceed with the cheaper interpretation
C. Request clarification from the appropriate design authority
D. Allow the subcontractor to decide
Answer: C. Request clarification from the appropriate design
authority
Rationale: Conflicting contract documents should be clarified before
affected work proceeds so that the contractor does not construct the
wrong condition or incur avoidable rework.
5. What is a change order?
,A. A daily safety report
B. A formal modification to the contract
C. A material delivery ticket
D. A payroll record
Answer: B. A formal modification to the contract
Rationale: A change order formally modifies contract scope, price,
time, or other contractual requirements and should be documented
and authorized.
6. What does a contractor's overhead generally represent?
A. Only material waste
B. Costs of operating the business that are not directly assigned to a
particular construction activity
C. Only employee wages
D. Only subcontractor costs
Answer: B. Costs of operating the business that are not directly
assigned to a particular construction activity
Rationale: Overhead includes business expenses such as office costs,
insurance, administrative salaries, vehicles, accounting, and similar
operating expenses.
7. What is profit in a construction estimate?
A. The same thing as sales tax
B. The amount remaining after applicable costs and overhead are
accounted for
C. The cost of permits
D. The cost of materials only
Answer: B. The amount remaining after applicable costs and
overhead are accounted for
, Rationale: Profit is the contractor's intended return after project costs
and allocated business expenses are considered.
8. What is a unit-price contract particularly useful for?
A. Work with quantities that may vary
B. Projects with no measurable work
C. Projects where drawings are prohibited
D. Employee payroll
Answer: A. Work with quantities that may vary
Rationale: Unit pricing establishes a price for a defined unit of work,
making it useful when actual quantities cannot be determined
accurately before construction.
9. A lump-sum contract generally requires the contractor to:
A. Perform the defined scope for an agreed total price
B. Charge only hourly wages
C. Recalculate the price every day
D. Avoid using subcontractors
Answer: A. Perform the defined scope for an agreed total price
Rationale: A lump-sum agreement establishes a fixed contract amount
for the defined scope, subject to authorized changes and applicable
contractual adjustments.
10. What is a construction contingency?
A. A guaranteed profit
B. An allowance for identified or anticipated uncertainty
C. A building permit
D. A lien waiver
Answer: B. An allowance for identified or anticipated uncertainty
Examination Questions And Correct
Answers (Verified Answers) Plus
Rationales 2026 Q&A | Instant
Download Pdf
1–50: Business, Contracts, Estimating, and Project Administration
1. What is the primary purpose of a written construction contract?
A. To eliminate the need for plans
B. To establish the rights and obligations of the parties
C. To guarantee the contractor a profit
D. To eliminate inspections
Answer: B. To establish the rights and obligations of the parties
Rationale: A written construction contract establishes the scope of
work, payment terms, responsibilities, schedule, and other obligations
of the owner and contractor.
2. Which document generally describes the technical requirements
and quality standards for construction materials and workmanship?
A. Daily report
B. Pay application
C. Specifications
D. Purchase order
Answer: C. Specifications
,Rationale: Specifications provide detailed requirements for materials,
products, workmanship, installation, testing, and performance that
supplement the drawings.
3. What is the main purpose of construction drawings?
A. To document employee attendance
B. To graphically communicate the design and construction
requirements
C. To calculate payroll taxes
D. To replace the construction contract
Answer: B. To graphically communicate the design and construction
requirements
Rationale: Construction drawings communicate dimensions, locations,
relationships, assemblies, and other design information needed to
construct the project.
4. A contractor discovers that the plans conflict with the written
specifications. What is generally the best initial action?
A. Ignore the conflict
B. Proceed with the cheaper interpretation
C. Request clarification from the appropriate design authority
D. Allow the subcontractor to decide
Answer: C. Request clarification from the appropriate design
authority
Rationale: Conflicting contract documents should be clarified before
affected work proceeds so that the contractor does not construct the
wrong condition or incur avoidable rework.
5. What is a change order?
,A. A daily safety report
B. A formal modification to the contract
C. A material delivery ticket
D. A payroll record
Answer: B. A formal modification to the contract
Rationale: A change order formally modifies contract scope, price,
time, or other contractual requirements and should be documented
and authorized.
6. What does a contractor's overhead generally represent?
A. Only material waste
B. Costs of operating the business that are not directly assigned to a
particular construction activity
C. Only employee wages
D. Only subcontractor costs
Answer: B. Costs of operating the business that are not directly
assigned to a particular construction activity
Rationale: Overhead includes business expenses such as office costs,
insurance, administrative salaries, vehicles, accounting, and similar
operating expenses.
7. What is profit in a construction estimate?
A. The same thing as sales tax
B. The amount remaining after applicable costs and overhead are
accounted for
C. The cost of permits
D. The cost of materials only
Answer: B. The amount remaining after applicable costs and
overhead are accounted for
, Rationale: Profit is the contractor's intended return after project costs
and allocated business expenses are considered.
8. What is a unit-price contract particularly useful for?
A. Work with quantities that may vary
B. Projects with no measurable work
C. Projects where drawings are prohibited
D. Employee payroll
Answer: A. Work with quantities that may vary
Rationale: Unit pricing establishes a price for a defined unit of work,
making it useful when actual quantities cannot be determined
accurately before construction.
9. A lump-sum contract generally requires the contractor to:
A. Perform the defined scope for an agreed total price
B. Charge only hourly wages
C. Recalculate the price every day
D. Avoid using subcontractors
Answer: A. Perform the defined scope for an agreed total price
Rationale: A lump-sum agreement establishes a fixed contract amount
for the defined scope, subject to authorized changes and applicable
contractual adjustments.
10. What is a construction contingency?
A. A guaranteed profit
B. An allowance for identified or anticipated uncertainty
C. A building permit
D. A lien waiver
Answer: B. An allowance for identified or anticipated uncertainty