LEAD ABATEMENT EXAMINATION PREP STUDY
GUIDE LATEST UPDATED PRACTICE
SOLUTION VERIFIED 100 PERCENT
◉ Lead based paint. Answer: 1.0 mg/cm2 or 0.5%
◉ blood lead level. Answer: 10 ug/dl (NH) 5ug/dl (CDC)
◉ Preliminary clearance. Answer: After hazards removed
◉ final clearance. Answer: Painted, sealed, cleaned, ready for
reoccupancy
◉ Hazard. Answer: Deteriorated, friction/impact; chewing
◉ Lead inspector job description. Answer: Create lead reports
◉ Risk Assessors job description. Answer: Identify risk and make
recommendations to abatement methods
◉ Abatement. Answer: Permanent removal of hazards (20 years)
enclosure, encapsulation, removal, replacement, remove paint
, ◉ enclosure. Answer: Vinyl, paneling, drywall, luan, plywood, glued,
screwed, chalked. NO WALLPAPER
◉ Encapsulation. Answer: Substrate must be stable and strong
(fiberlock)
◉ Interim controls. Answer: Temporary, waiting for abatement
(inspect every year)
◉ LBP location methods. Answer: XRF, dust sample, soil sample,
paint chip sample
◉ Parts of window. Answer: Stop, sill, apron, header, parting bead,
casing, trough, well
◉ Parts of door. Answer: Casing, jamb, hardware, threshold
◉ Parts of stairs. Answer: Treat, riser, spindle, newel post, balusters
◉ chewable. Answer: Between 6" and 4" - protrudes 1/2 " and is
horizontal
◉ Lead sources. Answer: Pipes, water, paint, dust, soil, pottery,
stained glass, toys, antiques
GUIDE LATEST UPDATED PRACTICE
SOLUTION VERIFIED 100 PERCENT
◉ Lead based paint. Answer: 1.0 mg/cm2 or 0.5%
◉ blood lead level. Answer: 10 ug/dl (NH) 5ug/dl (CDC)
◉ Preliminary clearance. Answer: After hazards removed
◉ final clearance. Answer: Painted, sealed, cleaned, ready for
reoccupancy
◉ Hazard. Answer: Deteriorated, friction/impact; chewing
◉ Lead inspector job description. Answer: Create lead reports
◉ Risk Assessors job description. Answer: Identify risk and make
recommendations to abatement methods
◉ Abatement. Answer: Permanent removal of hazards (20 years)
enclosure, encapsulation, removal, replacement, remove paint
, ◉ enclosure. Answer: Vinyl, paneling, drywall, luan, plywood, glued,
screwed, chalked. NO WALLPAPER
◉ Encapsulation. Answer: Substrate must be stable and strong
(fiberlock)
◉ Interim controls. Answer: Temporary, waiting for abatement
(inspect every year)
◉ LBP location methods. Answer: XRF, dust sample, soil sample,
paint chip sample
◉ Parts of window. Answer: Stop, sill, apron, header, parting bead,
casing, trough, well
◉ Parts of door. Answer: Casing, jamb, hardware, threshold
◉ Parts of stairs. Answer: Treat, riser, spindle, newel post, balusters
◉ chewable. Answer: Between 6" and 4" - protrudes 1/2 " and is
horizontal
◉ Lead sources. Answer: Pipes, water, paint, dust, soil, pottery,
stained glass, toys, antiques