WV Practice
General Exam
Builder_ Contractor
Complete
WVWest
Practice
General
Virginia
Exam
Builder
Contractor
_ Contractor
CompleteExam
West
Practice
Prep.pdf
Virginia
Exam Contractor
_ CompleteExam
West
Prep.pdf
Virginia Contractor Exam Prep.pdf
WV General Builder Contractor Practice
Exam | Complete West Virginia
Contractor Exam Prep
Guidehttps://www.stuvia.com/dashboard!@_)#*)(@$)($@*($@)($@*_
WV General Builder Contractor
WV Practice
General Exam
Builder_ Contractor
Complete
WVWest
Practice
General
Virginia
Exam
Builder
Contractor
_ Contractor
CompleteExam
West
Practice
Prep.pdf
Virginia
Exam Contractor
_ CompleteExam
West
Prep.pdf
Virginia Contractor Exam Prep.pdf
,WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf
Terms in this set (202)
What is the minimum compressive strength in psi 2500
for a concrete basement slab with negligible
weathering potential?
An accessory structure is a structure not greater 3000
than ____ square feet.
What is the R value insulation requirement for a 19
residential floor climate zone 3?
WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf
,WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf
For a "Means of Egress Door", what is the 32
minimum width of each door opening in inches?
Exterior wood framing walls shall be a minimum 3
of _______ grade wood.
Which of the following is not considered work Fences less than 6 feet
exempt from a permit?
a. Swings and Playground equipment
b. sidewalks
c. fences less than 6 feet
d. interior painting
A permit becomes invalid if the work authorized 180
by the permit does not begin in _____ days.
WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf
, WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf
The building permit shall be kept on site until the True
work is complete.
True or false
When shall a final inspection be conducted? After permitted work is complete
A. After the permit is issued
B. After permitted work is complete
C. After the occupants move in
D. Upon beginning the permitted work
Which of the following is required in a Certificate all of the above
of Occupancy?
a. Name and address of owner
b. name of building official
c. edition of the code permit was issued under
d. all of the above
WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf WV General Builder Contractror Practice Exam.pdf