Exam (elaborations)

CM 3111 Chapters: 1, 2, 4 Questions and Answers

Document preview thumbnail
Preview 2 out of 9 pages

What is prepared from the contract documents - Answer Plans and project manual Estimating in building construction is used to: - Answer determine probable construction costs for a project Establish budget Order materials Provides the general contractor an acceptable rate of return and compensation for the risk associated with the project; more in than out - Answer Profit Margin Types of Estimates - Answer Detailed, Assembly, Square-foot, Parametric Determines the quantity and cost of everything required for the project, including: Materials, labor, equipment, insurance, bonds, overhead, etc. - Answer Detailed Estimate - Bid by groups of components (assemblies) - For example, a light switch would include: Single-gang box, single-pole switch, cover plate, two wire nuts, 20 ft wire - Answer Assembly Estimate Square-foot Estimates - Answer Bid based on an average cost per square foot, May be adjusted - Bid based upon the statistical relationship between building components - May include: Square footage, number of floors, length of perimeter, percentage of the building that is common space, etc. - Answer Parametric Estimates - Prepares an estimate based upon the answers to a number of questions - Questions for the slab on grade portion of the building might include: What is the thickness of the slab? Does the slab have wire mesh? - Answer Model Estimating Project Comparison - Answer - Prepared by comparing the costs of a proposed project to a similar project - Adjusted for differences between the comparison project and the project being estimated

Content preview

CM 3111 Chapters: 1, 2, 4 Questions and
Answers
What is prepared from the contract documents - Answer Plans and project manual



Estimating in building construction is used to: - Answer determine probable construction costs
for a project

Establish budget

Order materials



Provides the general contractor an acceptable rate of return and compensation for the risk
associated with the project; more in than out - Answer Profit Margin



Types of Estimates - Answer Detailed, Assembly, Square-foot, Parametric



Determines the quantity and cost of everything required for the project, including: Materials,
labor, equipment, insurance, bonds, overhead, etc. - Answer Detailed Estimate



- Bid by groups of components (assemblies)

- For example, a light switch would include: Single-gang box, single-pole switch, cover plate, two
wire nuts, 20 ft wire - Answer Assembly Estimate



Square-foot Estimates - Answer Bid based on an average cost per square foot, May be
adjusted



- Bid based upon the statistical relationship between building components

- May include: Square footage, number of floors, length of perimeter, percentage of the building
that is common space, etc. - Answer Parametric Estimates



- Prepares an estimate based upon the answers to a number of questions

- Questions for the slab on grade portion of the building might include: What is the thickness of
the slab? Does the slab have wire mesh? - Answer Model Estimating



Project Comparison - Answer - Prepared by comparing the costs of a proposed project to a
similar project

- Adjusted for differences between the comparison project and the project being estimated

, Estimating Opportunities - Answer - Architectural and engineering offices

Subcontractors

Material suppliers

Manufacturers' representatives

Project management

Government

Professional quantity surveyor

Freelance estimators

Residential construction

Computer software



Additional Estimating Skills - Answer - Visualize building from plans

- Foresee problems

- Experienced in the construction process

- Methods of handling materials

- Labor productivity

- Convert labor productivity to costs

- Maintain a cost database

- Computer literate with:

Spreadsheets

Estimating software such as WinEst

Meets bid deadlines

Strong writing and presentation skills



Quantity Take-off skills - Answer Read and quantify plans

Knowledge of math and geometry

Patience

Does careful, thorough work

Computer literate with takeoff software

On-screen takeoff

Paydirt



Types of Bids - Answer Competitive and Negotiated



Awarded based upon price and best value - Answer Competitive Bid

Document information

Uploaded on
August 18, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
COCOSOLUTIONS
4.2
(37)
Sold
219
Followers
16
Items
9204
Last sold
5 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions