●● Design-Build contracts require
Answer: The QC Manager to be in place and take an active role in the
review and coordination of the design.
●● Which of the following is included in all three phases of the Three
Phases of Control?
Answer: Safety
●● The purpose of Construction Quality Management is to
Answer: Achieve the quality established by properly developed
requirements through the combined responsibility, but separate, efforts
of contractors and government personnel
●● Testing is extremely important in construction quality management
and is performed by
Answer: Both the contractor and the government
●● The primary purpose of the Three-Phase Control System is to
,Answer: Require the contractor to plan, schedule, and perform quality
management actions to assure work meets all specified quality standards
●● Quality Assurance Personnel have the responsibility to
Answer: Require the contractor to maintain the quality specified in the
plans and specifications
●● The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved
Answer: Preparatory Phase
●● The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are
Answer: Conducted prior to the commencement of any physical
construction work
●● Contractor testing procedures:
Answer: Are specified in the technical specs, outlined in the QCP, and
addressed at Coordination and Mutual Understanding Meeting
●● The Quality Control Plan contains
Answer: Identification of individual quality quality control personnel,
including name, qualifications, assigned duties, responsibilities and
authorities.
, ●● Tests that are unannounced, randomly performed, and repeat quality
control tests are
Answer: Quality assurance tests
●● The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when
Answer: There are no exceptions to the rule
●● During the punch-out inspection of a project:
Answer: Quality Control personnel prepare and punch-list and make
corrections
●● The Quality Control Report should include
Answer: All of the above
●● In a design build contract, if the contractor has a question about the
design, what is the process to get an answer?
Answer: Contractor submits a design verification request to the
contractor's design team
●● Submittals are
Answer: Necessary to demonstrate that the proposed materials, etc. are
in compliance with the contract.
FOR CONTRACTORS CERTIFICATION
EVALUATION TEST PAPER QUESTIONS
AND SOLUTIONS VERIFIED COMPLETE
●● Design-Build contracts require
Answer: The QC Manager to be in place and take an active role in the
review and coordination of the design.
●● Which of the following is included in all three phases of the Three
Phases of Control?
Answer: Safety
●● The purpose of Construction Quality Management is to
Answer: Achieve the quality established by properly developed
requirements through the combined responsibility, but separate, efforts
of contractors and government personnel
●● Testing is extremely important in construction quality management
and is performed by
Answer: Both the contractor and the government
●● The primary purpose of the Three-Phase Control System is to
,Answer: Require the contractor to plan, schedule, and perform quality
management actions to assure work meets all specified quality standards
●● Quality Assurance Personnel have the responsibility to
Answer: Require the contractor to maintain the quality specified in the
plans and specifications
●● The _________________ is the appropriate time to assure that all
materials and/or equipment have been tested, submitted, and approved
Answer: Preparatory Phase
●● The Preconstruction Conference and Coordination and Mutual
Understanding Meeting Are
Answer: Conducted prior to the commencement of any physical
construction work
●● Contractor testing procedures:
Answer: Are specified in the technical specs, outlined in the QCP, and
addressed at Coordination and Mutual Understanding Meeting
●● The Quality Control Plan contains
Answer: Identification of individual quality quality control personnel,
including name, qualifications, assigned duties, responsibilities and
authorities.
, ●● Tests that are unannounced, randomly performed, and repeat quality
control tests are
Answer: Quality assurance tests
●● The contractor is required to conduct a Preparatory Phase Meeting
before they begin any definable feature of work except when
Answer: There are no exceptions to the rule
●● During the punch-out inspection of a project:
Answer: Quality Control personnel prepare and punch-list and make
corrections
●● The Quality Control Report should include
Answer: All of the above
●● In a design build contract, if the contractor has a question about the
design, what is the process to get an answer?
Answer: Contractor submits a design verification request to the
contractor's design team
●● Submittals are
Answer: Necessary to demonstrate that the proposed materials, etc. are
in compliance with the contract.