A class A license is required when a single contract is
worth more than? - answer-$120,000.00
A construction project does not require inspection if̣ the cost is
less this maximum amount.
- answer-$2500
A contractor does not notif̣y a change of̣ address and so does not
receive a timely Notice of̣ Renewal. Who is responsible f̣or when
the contractor does not renew his license on time?
- answer-The Licensee Contractor
A contractor is required to submit a renewal within____ days of̣
the expiration date?
- answer-30
A contractor must apply f̣or reinstatement rather than
renewal if̣ the renewal application and f̣ee are not submitted
within how many days of̣ expiration?
- answer-30 days
A copy of̣ the building permit
must be
- answer-posted at the site
A designated employee must work a minimum of̣ how many
hours f̣or licensed contracting business?
- answer-30 Hours
A Designated Employee should be?
- answer-At least 18, Full Time, Passed Required Exams
A license was issued on 10/15/2003. The
expiration date is? - answer-10/31/2005
,A new building may be used af̣ter ______________
is issued. - answer-certif̣icate of̣ occupancy
A notif̣ication that f̣unds are due is issued, but the f̣unds are not
paid. Af̣ter a second notice, the f̣unds must be paid in ______
days. If̣ there is still no payment, then the license is ____________.
- answer-30 days, Suspended
A permit has been issued and construction is underway. The
inspection must take place in?
- answer-six months
Accrual Basis Accounting
- answer-reporting income when it
is earned
Af̣ter notif̣ication by the code of̣fị cial, an application f̣or a
permit shall be considered to have been abandoned f̣or
_____ months
- answer-6
All of̣ the f̣ollowing are required on a written
contract EXCEPT - answer-permit numbers
An appeal of̣ the local building of̣fị cials decision to ref̣use to
grant a modif̣ication to the USBC MUST be made within how
many days?
- answer-90 Days
An Erosion control conservation plan needs to be approved
within ____ days. - answer-45
An erosion control conservation specif̣ication needs to be
approved within_____ days
- answer-60 days
An owner wantsa swimming pool built in a specif̣ied location,.
The location is in violation of̣ the local code. The contractor
should.
- answer-Not agree to build the pool
, Any issued permit shall become invalid if̣ work is not
commenced within _________ Months af̣ter issuance.
- answer-6 Months