Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

NETTCP Concrete Inspector Certification Exam 2026/2027 | Questions & Answers | Concrete Inspection Study Guide

Document preview thumbnail
Preview 2 out of 11 pages

NETTCP Concrete Inspector Exam Questions & Answers 2026/2027: Comprehensive certification preparation covering concrete materials, testing, reinforcement, pre-placement and placement operations, curing, repairs, specifications, quality control, and plan reading.

Content preview

NETTCP Concrete Inspector Exam
False Quality assurance is defined as only those planned and systematic actions
taken by the agency to provide confidence that a product or facility will
perform satisfactorily in service. (1-1)


True A quality assurance program serves as a skeleton or overall framework
necessary for construction quality assurance implementation. (1-4)


True Joint development and review of quality assurance specifications should
include agency and industry personnel (engineers, inspectors, technicians) who
are directly responsible for construction. (1-5)




True The same six core elements required for design-bid-build construction QA
programs are also required for design-build construction QA programs. (1-8)


False Quality control activities include only sampling and testing. Visual inspection is
relegated to the acceptance inspector. (1-10)


True Quality control plans are project specific documents whose function is to
address specific production facility and field placement processes for
individual categories of work on a construction project. (1-11)


True Acceptance is the responsibility of the transportation agency. (1-12)


True The engineering limits are the absolute threshold values for individual test
results (1-15)


True Quality assurance specifications typically use quality measures. (1-14)


True Since the objective of the IA comparison is to identify discrepancies or
variability in testing procedures or equipment, IA testing is performed on split
samples. (1-20)


True If Contractor QC test results are not utilized in the acceptance decision, a
dispute resolution system is not required. (1-21)


True All Agency Central Laboratories are required under federal regulations to be
accredited through AASHTO Accreditation Program (AAP). (1-23)

, NETTCP Concrete Inspector Exam

True Personal Qualification/Certification programs should include requirements for
re-certification at 2 to 5 year intervals. (1-26)


True Each Agency Construction QA Program must meet the requirements of 23 CFR
637B and is required to be approved by FHWA. (1-27)


True The process of hydration begins immediately when the cement comes in
contact with water. (2-1)


True The cement paste density and strength are related. (2-1)


True AASHTO M 85 (ASTM C 150) stipulate cement types based on chemical
composition. (2-3)


False Type III cement is known as a low heat of hydration cement. (2-3)


True According to ACI 318, mixtures using Type I cement should be cured for 7 days.
(2-4)


True Lowering the heat of hydration in massive concrete structures is important to
prevent thermal cracking. (2-4)


True A type IP(10) is used to indicate a Portland-pozzolan blended product, with
10% pozzolan. (2-5)




True Expansive cement is a special product designed to offset stresses in concrete
caused by drying shrinkage, which when excessive can lead to cracking. (2-6)


True The time of set for cement paste is determined via a needle penetration
method. (2-7)


False Cement should be stored in humid or moist environments to ensure hydration
has started prior to being introduced into the concrete mixer. (2-8)


True A pozzolan is a material which in itself possesses little or no cementitious
activity, but when combined with hydraulic cement, will behave in a
cementitious manner. (3-1)


True Fly ash tends to increase the consistency of concrete when compared to
mixtures with just Portland Cement. (3-3)


False Dosages of air entrainment generally need to be lowered when fly ash is used.
(3-3)

Document information

Uploaded on
August 16, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
ExamBooster111
5.0
(3)
Sold
3
Followers
1
Items
886
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions