CDT 2 PRACTICE QUESTIONS WITH DETAILED
EXPLANATIONS 2026

◉ "A facility's "life cycle" includes all of the following EXCEPT:
a. Project conception
b. Financing
c. Construction
d. Facility management".
Answer: 1. b - PRM 1.4 Life cycle Stages: Conceptions, Delivery
Method, Design, Psrocurement, Construction,


◉ What does CSI's UDS do ? what does it stand for ?.
Answer: UDS uniform drawing system


◉ CMa stands for....
Answer: Construction Manager as Advisor


◉ "The objective of the competitive bidding process is:
a. To ensure that all qualified bidders may submit bids on public
work projects
b. To ensure that public works contracts are always awarded to the
lowest bidders

,c. To ensure that the intent of the governing public laws is
maintained in the
awarding of contracts
d. To ensure that the cost of the project is reasonable and consistent
with the
prevailing conditions in the building industry".
Answer: 2. d - PRM 3.4


◉ What is included in PART 3 of SectionFormat?.
Answer: PART 3- EXECUTION: describes field/site installation or
application, including preparatory actions and post-installation
cleaning and protection. Field/site-built assemblies and field/site-
manufactured products and systems are included.


◉ "A unit price contract or contract portion is used when:


a. Extent of work cannot be fully determined or where actual
quantities cannot be accurately calculated.
b. Extent of work is known, but the owner desires a break-out cost
for portions of the work.
c. It is anticipated that bidders will not examine soil bearing reports
prior to submitting bid.
d. Bidding quantities of equipment.

,Review: PDPG 7.1.6.2".
Answer: "a. Extent of work cannot be fully determined or where
actual quantities cannot be accurately calculated.


Use of unit prices, allowances and alternates should always be
limited to those items required for accurate bidding, in order to keep
bidding documents and processes as simple as possible."


◉ "The contractual relationship governed by the Conditions of the
Contract is between:


a. Owner and contractor
b. Architect/engineer and contractor
c. Owner and Subcontractors
d. Owner, contractor, and architect/engineer


Review: PDPG 5.5 and 11.3.9".
Answer: "a. Owner and contractor


The owner and the contractor are the parties to the construction
contract, hence they are subject to the Conditions of the Contract.
Yes, the duties of the architect are described in the Conditions of the
Contract, but they are governed by the separate Owner/Architect or
Owner/Engineer Agreement."

, ◉ How long does a contractor required to execute corrections in the
Work after Substantial Completion?.
Answer: one year


◉ "Which of the following would be included in Available
Information?


a. Bid security requirements
b. Environmental Impact Statement
c. Time of completion to construct the project
d. Description of the Work


Review: PDPG 11.4.5".
Answer: "b. Environmental Impact Statement


Available Information is the place to provide reference information
such as this that doesn't belong in the contract. Bid security info? In
the Instructions for Procurement. Time of Completion? It's
contractual - where would you put it? Description of Work? Name
the Division 01 section where that belongs."


◉ "Instructions for Procurement:

Document information

Uploaded on
August 16, 2026
Number of pages
72
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(12)
Sold
144
Followers
1
Items
51004
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions