◉ How long does a contractor required to execute corrections in the
Work after Substantial Completion.
Answer: one year
◉ "Which of the following would be included in Available
Information?
a. Bid security requirements
b. Environmental Impact Statement
c. Time of completion to construct the project
d. Description of the Work
Review: PDPG 11.4.5".
Answer: "b. Environmental Impact Statement
Available Information is the place to provide reference information
such as this that doesn't belong in the contract. Bid security info? In
the Instructions for Procurement. Time of Completion? It's
contractual - where would you put it? Description of Work? Name
the Division 01 section where that belongs."
,◉ "Instructions for Procurement:
a. Are used only on private projects
b. Frequently are standard industry forms
c. May include the geotechnical report as an attachment
d. Are binding upon the Contractor
Review: PDPG 11.4.4
".
Answer: "b. Frequently are standard industry forms
Both AIA and EJCDC offer standard printed Instructions to Bidders
forms. If necessary, a Supplementary Instructions to Bidders can
customize the Instructions to suit special project conditions.
Did you notice? The PDPG uses the term ""Instructions for
Procurement"" as an umbrella term for both bid and negotiated
projects. MasterFormat lists both terms: Instructions for
Procurement, and the more specific documents Instructions to
Bidders or Instructions to Proposers."
◉ "Marked-up or corrected contract drawings that indicate changes
incorporated in the Work are:
,a. Contract forms
b. Closeout submittals
c. Record drawings
d. As-builts
e. Not required for private work
Review: PDPG 11.2.3.5".
Answer: "c. Record drawings
These drawings incorporate all issued modifications and significant
field changes in scope. The term ""as-builts"" is discouraged, as we
are often unable to certify the accuracy of actual installations and
field-recorded information."
◉ "Contractual clauses in the Conditions of the Contract:
a. Have priority over Division 01
b. Are superseded by Division 01
c. Are expanded upon by the provisions of Division 01
d. Are independent, and Division 01 provisions have no effect
, Review: PDPG 11.2.9".
Answer: "c. Are expanded upon by the provisions of Division 01
The key word is ""expanded."" Division 01 General Requirements are
detailed. They address administrative and procedural level issues.
The Conditions of the Contract say: ""Do this."" The General
Requirements say: ""Do it like this."" And don't forget the concept of
""complementary documents."" No provisions have priority over, are
superseded by, or are independent of, other provisions in the
contract documents - they are ""complementary."""
◉ "In the specifications, the stated requirements address:
a. The owner's responsibilities
b. The contractor's responsibilities
c. The subcontractor's responsibilities
d. The architect's responsibilities
e. All of the above
Review: PDPG 11.3.4.3".
Answer: "b. The contractor's responsibilities
The owner and the contractor are the sole parties to the contract.
The requirements of the specifications address the contractor. Other
AND CLINICAL PRACTICE SUMMARY 2026
◉ How long does a contractor required to execute corrections in the
Work after Substantial Completion.
Answer: one year
◉ "Which of the following would be included in Available
Information?
a. Bid security requirements
b. Environmental Impact Statement
c. Time of completion to construct the project
d. Description of the Work
Review: PDPG 11.4.5".
Answer: "b. Environmental Impact Statement
Available Information is the place to provide reference information
such as this that doesn't belong in the contract. Bid security info? In
the Instructions for Procurement. Time of Completion? It's
contractual - where would you put it? Description of Work? Name
the Division 01 section where that belongs."
,◉ "Instructions for Procurement:
a. Are used only on private projects
b. Frequently are standard industry forms
c. May include the geotechnical report as an attachment
d. Are binding upon the Contractor
Review: PDPG 11.4.4
".
Answer: "b. Frequently are standard industry forms
Both AIA and EJCDC offer standard printed Instructions to Bidders
forms. If necessary, a Supplementary Instructions to Bidders can
customize the Instructions to suit special project conditions.
Did you notice? The PDPG uses the term ""Instructions for
Procurement"" as an umbrella term for both bid and negotiated
projects. MasterFormat lists both terms: Instructions for
Procurement, and the more specific documents Instructions to
Bidders or Instructions to Proposers."
◉ "Marked-up or corrected contract drawings that indicate changes
incorporated in the Work are:
,a. Contract forms
b. Closeout submittals
c. Record drawings
d. As-builts
e. Not required for private work
Review: PDPG 11.2.3.5".
Answer: "c. Record drawings
These drawings incorporate all issued modifications and significant
field changes in scope. The term ""as-builts"" is discouraged, as we
are often unable to certify the accuracy of actual installations and
field-recorded information."
◉ "Contractual clauses in the Conditions of the Contract:
a. Have priority over Division 01
b. Are superseded by Division 01
c. Are expanded upon by the provisions of Division 01
d. Are independent, and Division 01 provisions have no effect
, Review: PDPG 11.2.9".
Answer: "c. Are expanded upon by the provisions of Division 01
The key word is ""expanded."" Division 01 General Requirements are
detailed. They address administrative and procedural level issues.
The Conditions of the Contract say: ""Do this."" The General
Requirements say: ""Do it like this."" And don't forget the concept of
""complementary documents."" No provisions have priority over, are
superseded by, or are independent of, other provisions in the
contract documents - they are ""complementary."""
◉ "In the specifications, the stated requirements address:
a. The owner's responsibilities
b. The contractor's responsibilities
c. The subcontractor's responsibilities
d. The architect's responsibilities
e. All of the above
Review: PDPG 11.3.4.3".
Answer: "b. The contractor's responsibilities
The owner and the contractor are the sole parties to the contract.
The requirements of the specifications address the contractor. Other