Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

MEDICAL GAS 6010 INSTALLERS EXAM | COMPLETE QUESTIONS WITH EXPERT SOLUTION | 2026 LATEST UPDATED GET A+

Document preview thumbnail
Preview 2 out of 12 pages

MEDICAL GAS 6010 INSTALLERS EXAM | COMPLETE QUESTIONS WITH EXPERT SOLUTION | 2026 LATEST UPDATED GET A+

Content preview

MEDICAL GAS 6010 INSTALLERS EXAM | COMPLETE QUESTIONS WITH EXPERT

SOLUTION | 2026 LATEST UPDATED GET A+



1. Which of the following would NOT be deemed as breach of a medical-sur-

gical vacuum system?: Testing a piping system component with a leak-detectant that does not contain ammonia

2. system is an assembly of equipment such as storage containers, pressure regulators, pressure relief devices,

vaporizers, manifolds, and interconnecting piping that has a storage capacity of more than 20,000 cubic feet of normal

temperature and pressure, including unconnected reserves as held at the site.: Bulk Oxygen

3. Which of the following is a TRUE statement of Category 1 medical support gases?: Primarily used in powering

equipment used in patient care procedures

4. Prior to the production welding of stainless-steel tube, the NFPA 99 requires

welders shall be qualifir welding performance in compliance with which stan-

dard?: American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code, Section IX

5. Performance qualification of brazers shall remain in effect indefinitely unless the brazer does NOT braze with

the qualified procedure for a period exceeding _____ month or there is a specific reason to question the ability of the

brazer: Six

6. All positive pressure Category 1 medical gas supply systems shall be provided with means to control the final

line pressure at the source and include: Protection against overpressure

7. What does it mean when equipment, materials, or services are shown as

'listed"?: They are included in a list published by an organization that is acceptable to the authority having jurisdiction

8. Compressed gas cylinders must meet all EXCEPT which of the following criteria in order to be acceptable f i n a

Category 1 health care facility?: Identified with black marker

9. The installer-performed initial pressure test requires that testing shall be



, conducted: Prior to the instalation of components of the distribution piping systen that woula e danaged by ef pesure

10. According to the NFPA99, an oxygen-enriched atmosphere is one where the concentration of oxygen exceeds

_______ percent per volume.: 23.5

11 Regarding the nitrogen purge for brazing, the final brazed connection of new piping to an existing pipeline

containing the system gas shall be permitted to be made without the use of a nitrogen purge. For pressure gases,

immediately after the final brazed connection is made and leak tested, an outlet in the new piping and an outlet in the

existing piping that are immediately downstream from the point or area of intrusion shall be purged in accordance with

the applicable requirements of the — in order to remove any traces of particulate matter deposited in the pipeline.:

piping purge test

12. Who is the individual responsible for reviewing all inspection and testing

reports prior to the use of new additional, renovated, or temporary medical gas and vacuum installations?: Responsible

facility authority

13. All Master, area, and local alarm systems used for medical gas and vacuum systems shall include _________

indication that communication with an alarm-initiating device is disconnected.: Audible and Visual

14. An assembly of equipment that has a capacity of oxygen greater than ______ is defined as s bulk oxygen system:

20,000 Ft3

15. The locations for medical gas central supply systems and the storage of positive pressure gases, excluding

cryogenic fluid central supply systems, requiring heating to maintain compliant enclosure temperatures, shall meet

which of the following requirements?: in room heating element maximum allowable temperature of 266 degrees F

16. Which of the following would describe an assembly of equipment for supplying compressed gas that terminates

where the gas, at service pressure, first enters the main line? The source gas is stored as a compressed gas or cryogenic

fluid in storage containers that are either stationary or movable and include unconnected reserves on hand at the site.:

Bulk Oxygen

Document information

Uploaded on
August 14, 2026
Number of pages
12
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
105
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions