Walmart - StormWater exam exam WItH CorreCt
aCtUal QUeStIoNS aND CorreCtlY Well DeFINeD aNSWerS
lateSt alreaDY GraDeD a+
The 1970's law that set into place the regulation of stormwater is: - aNSWer-The Clean
Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - aNSWer-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - aNSWer-Discharge from contaminated groundwater
The Notice of termination can filed when: - aNSWer-All construction activity, inside and
outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - aNSWer-Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - aNSWer-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - aNSWer-Groundcover
Temporary stabilization should be implemented - aNSWer-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is - aNSWer-To remove sediment from
construction site vehicles and minimize trackout
aCtUal QUeStIoNS aND CorreCtlY Well DeFINeD aNSWerS
lateSt alreaDY GraDeD a+
The 1970's law that set into place the regulation of stormwater is: - aNSWer-The Clean
Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - aNSWer-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - aNSWer-Discharge from contaminated groundwater
The Notice of termination can filed when: - aNSWer-All construction activity, inside and
outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - aNSWer-Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - aNSWer-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - aNSWer-Groundcover
Temporary stabilization should be implemented - aNSWer-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is - aNSWer-To remove sediment from
construction site vehicles and minimize trackout