1. Before beginning a residential PV installation, what is the first step an
installer should complete?
A. Install the inverter
B. Mount the modules
C. Review the approved plans and permits
D. Connect the utility meter
Answer: C. Review the approved plans and permits
Explanation: Installation should begin only after confirming approved plans,
permits, applicable codes, and project documentation. This ensures the
installation complies with local regulations and the approved design.
2. What is the primary purpose of a site assessment?
A. Determine the module color
B. Evaluate the site's suitability for solar installation
C. Select an internet provider
D. Determine the homeowner's utility company
,Answer: B. Evaluate the site's suitability for solar installation
Explanation: A proper site assessment evaluates shading, orientation, roof
condition, structural integrity, electrical infrastructure, and available installation
area.
3. Which roof orientation generally provides the greatest annual energy
production in the Northern Hemisphere?
A. North
B. East
C. South
D. West
Answer: C. South
Explanation: South-facing arrays generally receive the greatest annual solar
irradiance in the Northern Hemisphere.
4. Which roof pitch generally produces the highest annual energy when it
closely matches the site's latitude?
A. 5°
B. Approximately the local latitude
C. 80°
D. Flat regardless of location
Answer: B. Approximately the local latitude
Explanation: A tilt angle close to the site's latitude typically maximizes annual solar
energy production.
5. What device converts DC electricity from PV modules into AC electricity?
A. Charge controller
B. Transformer
,C. Inverter
D. Disconnect switch
Answer: C. Inverter
Explanation: The inverter converts direct current produced by PV modules into
alternating current used by buildings and utilities.
6. What is the purpose of a combiner box?
A. Increase module voltage
B. Combine multiple source circuits into one output
C. Cool the inverter
D. Measure irradiance
Answer: B. Combine multiple source circuits into one output
Explanation: Combiner boxes merge several PV source circuits into a single output
while typically providing overcurrent protection.
7. Which instrument measures solar irradiance?
A. Clamp meter
B. Pyranometer
C. Torque wrench
D. Megohmmeter
Answer: B. Pyranometer
Explanation: A pyranometer measures solar radiation reaching a surface and is
commonly used during site assessment and system verification.
8. What is the main purpose of rapid shutdown?
A. Increase system efficiency
B. Improve module appearance
, C. Reduce shock hazards during emergencies
D. Increase inverter voltage
Answer: C. Reduce shock hazards during emergencies
Explanation: Rapid shutdown reduces hazardous voltages in PV system conductors
to improve firefighter and emergency responder safety.
9. Which conductor carries current away from the PV modules?
A. Equipment grounding conductor
B. Grounding electrode conductor
C. PV source circuit conductor
D. Bonding jumper
Answer: C. PV source circuit conductor
Explanation: PV source circuit conductors carry electrical current generated by the
modules.
10.Why is proper torque important when installing electrical terminals?
A. Improve aesthetics
B. Prevent loose or damaged connections
C. Reduce wire length
D. Increase inverter efficiency
Answer: B. Prevent loose or damaged connections
Explanation: Manufacturer-specified torque values reduce overheating, arcing,
and equipment damage.
11.Which factor most significantly reduces PV output?
A. Clean glass
B. Shading
Exam Newest Updated 2025-2026 Practice
Questions From Actual Exams Complete
Questions And Correct Detailed Answers
(Expert Verified Exam) |Already Graded A+
Instant Download Pdf
1. Before beginning a residential PV installation, what is the first step an
installer should complete?
A. Install the inverter
B. Mount the modules
C. Review the approved plans and permits
D. Connect the utility meter
Answer: C. Review the approved plans and permits
Explanation: Installation should begin only after confirming approved plans,
permits, applicable codes, and project documentation. This ensures the
installation complies with local regulations and the approved design.
2. What is the primary purpose of a site assessment?
A. Determine the module color
B. Evaluate the site's suitability for solar installation
C. Select an internet provider
D. Determine the homeowner's utility company
,Answer: B. Evaluate the site's suitability for solar installation
Explanation: A proper site assessment evaluates shading, orientation, roof
condition, structural integrity, electrical infrastructure, and available installation
area.
3. Which roof orientation generally provides the greatest annual energy
production in the Northern Hemisphere?
A. North
B. East
C. South
D. West
Answer: C. South
Explanation: South-facing arrays generally receive the greatest annual solar
irradiance in the Northern Hemisphere.
4. Which roof pitch generally produces the highest annual energy when it
closely matches the site's latitude?
A. 5°
B. Approximately the local latitude
C. 80°
D. Flat regardless of location
Answer: B. Approximately the local latitude
Explanation: A tilt angle close to the site's latitude typically maximizes annual solar
energy production.
5. What device converts DC electricity from PV modules into AC electricity?
A. Charge controller
B. Transformer
,C. Inverter
D. Disconnect switch
Answer: C. Inverter
Explanation: The inverter converts direct current produced by PV modules into
alternating current used by buildings and utilities.
6. What is the purpose of a combiner box?
A. Increase module voltage
B. Combine multiple source circuits into one output
C. Cool the inverter
D. Measure irradiance
Answer: B. Combine multiple source circuits into one output
Explanation: Combiner boxes merge several PV source circuits into a single output
while typically providing overcurrent protection.
7. Which instrument measures solar irradiance?
A. Clamp meter
B. Pyranometer
C. Torque wrench
D. Megohmmeter
Answer: B. Pyranometer
Explanation: A pyranometer measures solar radiation reaching a surface and is
commonly used during site assessment and system verification.
8. What is the main purpose of rapid shutdown?
A. Increase system efficiency
B. Improve module appearance
, C. Reduce shock hazards during emergencies
D. Increase inverter voltage
Answer: C. Reduce shock hazards during emergencies
Explanation: Rapid shutdown reduces hazardous voltages in PV system conductors
to improve firefighter and emergency responder safety.
9. Which conductor carries current away from the PV modules?
A. Equipment grounding conductor
B. Grounding electrode conductor
C. PV source circuit conductor
D. Bonding jumper
Answer: C. PV source circuit conductor
Explanation: PV source circuit conductors carry electrical current generated by the
modules.
10.Why is proper torque important when installing electrical terminals?
A. Improve aesthetics
B. Prevent loose or damaged connections
C. Reduce wire length
D. Increase inverter efficiency
Answer: B. Prevent loose or damaged connections
Explanation: Manufacturer-specified torque values reduce overheating, arcing,
and equipment damage.
11.Which factor most significantly reduces PV output?
A. Clean glass
B. Shading