Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 43 pages
Exam (elaborations)

PSPO_1_TEST_BANK_FULL_QUESTIONS_AND_ACCURATE_ANSWERS_COLLECTION.

Document preview thumbnail
Preview 4 out of 43 pages

PSPO_1_TEST_BANK_FULL_QUESTIONS_AND_ACCURATE_ANSWERS_COLLECTION.

Content preview

PSPO 1 TEST BANK FULL QUESTIONS AND
ACCURATE ANSWERS COLLECTION

●● "To create focus which of the following are most important to have
ready when Sprint Planning begins?
(choose the best two answers)" "A) A fully refined Product Backlog.
B) A clear cadence of when the Daily Scrum will take place.
C) A Product Backlog with the most important items ready for
discussion.
D) Formal budget approval to conduct another Sprint.
E) A clear and non-negotiable Sprint Goal.
F) A Product Goal communicated by the Product Owner."
Answer: C, F,


●● A PO is essentially the same thing as a traditional Projecet Manager?
"A) True
B) False"
Answer: B,


●● "Your management has asked you to take the lead in the
development of a new product. Six teams new to Scrum will build this
product. You have gathered a number of requirements and ideas into an

,early form of a Product Backlog. How would you minimize
dependencies between the Scrum Teams?
(choose the best answer) " "A) You identify the dependencies and re-
order the Product Backlog for the other five Product Owners.
B) You divide Product Backlog items among the six Product Owners.
C) You work with the Developers on how to best analyze and break
apart the work.
D) You create an independent Product Backlog per Scrum Team.
E) You raise this as an impediment with the Scrum Master."
Answer: C,


●● "In which meetings the Key Stakeholders are allowed to participate?
(choose the best answer)" "A) The Daily Scrum.
B) The Sprint Retrospective.
C) The Sprint Review.
D) The Sprint Planning."
Answer: C,


●● "It is mandatory for the Product Owner to monitor and share
progress of the Product Backlog. Which method could he/she use?
(choose the best answer)" "A) A Product or Release burn-down chart.
B) A Value burn-up chart.
C) A Gantt chart.

,D) Any practice based on trends of work completed and upcoming work.
E) A Sprint Review acceptance report."
Answer: D,


●● "Who has the authority to cancel the Sprint?
(choose the best answer)" "A) The Development Team.
B) The Product Owner.
C) The Scrum Master.
D) The Key Stakeholders.
E) The Product Owner and the Scrum Master."
Answer: B,


●● "What is a Product Backlog?
(choose the best answer)" "A) It is a living artifact of product
requirements that exists and evolves as long as a product exists
B) It is list of references to Use Case documents that are stored in a
cerntral repository. The references should be viewable and clickable by
anybody to enhance transparency
C) It ist formally approves list of requiremets to be implemented over a
set period
D) It is a detailed list of functionality from which the Development
Team draws items, to be complemented by a seperate Technology
Backlog managed by the Development Team. "
Answer: A,

, ●● "What are the characteristics of a Development Team?
(choose the best three answers)" "A) Accountability belongs to the
Development Team as a whole.
B) Scrum recognizes no sub-teams in the Development eam
C) Having at least one test engineer in the Development Tam.
D) Scrum recognizes no titles for Development Team memb
E) Having the Scrum Master as a part-time Developer in the
Development Team."
Answer: A, B, D,


●● "Which description best fits the role of the Product Owner?
(choose the best answer)" "A) Scope Protector
B) Project Manager 2.0
C) Requirements Collector
D) Chief Analyst
E) Value Maximizer"
Answer: E,


●● "Peter is a new Product Owner on a newly formed Scrum Team.
Peter has projected a product completion date based on an estimated
velocity of 21 completed points per Sprint. After the first 3 Sprints, the
team has determined that their maximum velocity is 15 points and they

Document information

Uploaded on
August 11, 2026
Number of pages
43
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
150
Followers
2
Items
52667
Last sold
12 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions