Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 117 pages
Exam (elaborations)

NHIE Structural Test with all Correct & 100% Verified Answers |Actual Complete Update |Already Graded A+

Document preview thumbnail
Preview 4 out of 117 pages

NHIE Structural Test with all Correct & 100% Verified Answers |Actual Complete Update |Already Graded A+

Content preview

NHIE Structural Test with all Correct & 100% Verified
Answers |Actual Complete Update |Already Graded A+

A weep screed should be placed, How many inches above grade? ✔Correct Answer-4 inches

Swimming pools

1)swimming pool barriers must be how many ft above grade?

2) : Gates and through-barriers leading to swimming pools must have a lock and a
self-closing/self-latching device.

3) A septic system with a submersible grinder/effluent pump typically has a _________

4) A swimming pool barrier is not required to be _____________.

5) The minimum height for a light installed over a swimming pool is _____ feet.

6) The maximum length for a power cord from the electrical receptacle to swimming pool
equipment is ____ feet. ✔Correct Answer-1) 4ft 48inches)

2) true

3) failure alarm

4) constructed of solid material

5) 12 ft

6) 3ft

Habitable rooms

1) Habitable room requirements?

2) The minimum area for a habitable room in a residence is ____ square feet.

3) Every dwelling is required to have _______________.

4) The minimum width for a habitable room (not a kitchen) is ____ feet.
5
6

,7
8 ✔Correct Answer-1) egress
heat
light
ventilation
ceiling height

2) 70 sq ft

3) a toilet, lavatory, and bath or shower

4) 7ft

egress

1) The required egress door has to provide a clear space of at least ___ inches wide, measured
from the door surface to the door stop when the door is open at a 90 degree angle.
12
24
32
36
48 ✔Correct Answer-1) 32

A temporary service pole is usually installed in the earth to a depth of at least _____ feet.
✔Correct Answer-3ft

Service/ main panels

1) The neutral and ground wires should not be _______ downstream of the electrical service
panel.

2) In most jurisdictions, at least ____ 120-volt circuits (spaces) are required for new 100-amp
service panels.
12
24
36
42
60 ✔Correct Answer-1) bonded

2) 24

Plumbing Vents/ stacks

1) cause of plumbing vent extending to far above the roof line?

,2) plumbing vent stacks should terminate at least..above the roof line?

3) Plumbing stacks should terminate ____ feet horizontally from a window?

4) T/F: Exterior plumbing stack vents should be at least 3 feet above operable doors and
windows.

5) Drain and vent stacks shall terminate _____________.

6) If there is no trap on a condensate line into a vent stack, _________________.

7) T/F: An offset is usually permitted in a BW vent. ✔Correct Answer-1) frost Enclosure

2) 6 inches

3) 10 ft

4) true

5) up through the roof

6) sewer gases may enter the house through the blower coil

7) false

Range vents/ kitchens

1) One type of material that cannot be used for a kitchen range vent is __________. ✔Correct
Answer-1) flexible coil

T/F: If a satellite dish is mounted near a window, recommend that it be re-installed next to the
chimney for better support. ✔Correct Answer-false

The best conductor of electricity is _________.
aluminum
ceramic
copper
wood ✔Correct Answer-copper

electrical receptacles

1) T/F: Receptacles located higher than 5-1/2 feet above the floor are not counted as required
receptacles.

, 2) T/F: Fixed door panels, such as the fixed portion of a sliding glass door, are not counted as
floor space for the placement of required receptacles. ✔Correct Answer-1) true

2) false

electrical wires

1) White wires can sometimes act as a black wire __________.

by design on a reverse-polarity circuit
in 240-volt circuits
in multi-branch circuits
on a dedicated circuit for a clothes dryer
on a dedicated circuit for a washing machine


2) Where electrical conductors are to be spliced, terminated or connected to fixtures or devices,
a minimum length of ____ inches of free conductor shall be provided at each outlet, junction or
switch point.

3) T/F: The white wire is always the neutral.

4) In an electrical wiring system, the ______ tend(s) to wear out first.
sheathing
splices
switches
wire

5) The most dangerous situation in electrical wiring is caused by __________.
improper grounding
over-amperage
over-tightening the fuses
over-voltage ✔Correct Answer-1) multi-branch circuits

2) 8 inches

3) false

4) switches

5) improper grounding

wire splicing

Document information

Uploaded on
August 9, 2026
Number of pages
117
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Stuvia2026
2.3
(3)
Sold
24
Followers
1
Items
6033
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions