MOLD ASSESSOR STUDYS CORRECT QUESTIONS
AND ANSWERS SET A+
✔✔What is the primary factor that controls mold growth indoors? - ✔✔Availability of
moisture
✔✔The bulletin " A Brief Guide to Mold in the Workplace" directed towards building
managers, custodians and other responsible for building maintenance was release by: -
✔✔OSHA
✔✔A document prepared by the DSHS that describes who are requires to be licensed
and how to file a complaint is called: - ✔✔Consumer Mold Information Sheet- CMIS
✔✔What is NOT true when remediating an area of 25 sq ft or more: - ✔✔Personal
protective equipment is NOT required.
✔✔The minimum type of respirator required for mold remediation is : - ✔✔N-95
disposable
✔✔If you are using a biocide such as chlorine bleach you should not use gloves made
from: - ✔✔Cotton
✔✔HVAC filters should have a __________ rating to catch mold spores. - ✔✔MERV 8
✔✔Gloves, N-95 or half face respirator with HEPA filter, disposable overalls,
googles/eye protection are requirements for ________ personal protective equipment: -
✔✔Limited
✔✔Porous materials that are wet and have mold growing on them may have to
be___________. - ✔✔Discarded
,✔✔When using biocides, you should - ✔✔Always ventilate area, Use PPE, Follow label
instructions
✔✔TMRR, Start date is defines as: - ✔✔The date on which actual remediation of mold
begins.
✔✔TMRR, a person is NOT required to be licensed to perform mold remediation in an
area in which the mold contamination affects a total surface area of less than: - ✔✔25
contiguous sq ft.
✔✔TMRR, which of the following is NOT required to be licensed to perform mold
assessment or remediation while being supervised by a license holder: - ✔✔Mold
Remediation Worker
✔✔TMRR, a licensed person or company must maintain an office: - ✔✔In Texas
✔✔TMRR, persons required to have insurance must, at a minimum, obtain policies for
commercial general liability insurance in the amount of NOT less than
_______________ per occurrence. - ✔✔1 million
✔✔TMRR, A Mold Assessment Company must: - ✔✔Employ at least one licensed mold
assessment consultant, Maintain an office in Texas, Maintain commercial general
liability insurance.
✔✔TMRR, mold is defined as: - ✔✔1. Fungi
✔✔TMRR, a credential is: - ✔✔A license
✔✔TMRR, which document does the clearance criteria for a remediation project
appear? - ✔✔The mold remediation protocol
✔✔TMRR, all individual licensees and registrants shall receive refresher training every:
- ✔✔2 Years
✔✔TMRR, the purpose of a mold assessment - ✔✔A. To determine the sources,
locations and extent of mold growth in a building.
✔✔TMRR, signs advising that a mold remediation project is in progress shall: - ✔✔1. Be
displayed at all entrances to remediation areas adjacent to occupied areas of a building
2. Be at least 8x10 inches in size.
3. Bear the words "Notice: Mold remediation project in progress.
✔✔Skipped - ✔✔Skipped
, ✔✔TMRR, the purpose of a mold analysis is: - ✔✔c. Identifying or determining the
amount or presence of any fungal products, including but NOT limited to mycotoxins,
and fungal volatile organic compounds.
✔✔TMRR, working day is defined as: - ✔✔Monday through Friday, including holidays.
✔✔TMRR, biocides and antimicrobial coatings may be used only if: - ✔✔1. Their use is
specified in a mold remediation protocol.
2. They are registered by the EPA for the intended use.
3. Their use is consistent w/ the manufacturers labeling instruction.
✔✔TMRR, a mold remediation contractor or company shall notify the DSHS of a mold
remediation project when mold contamination affects a total surface area of _________
cont. Sq ft or more. - ✔✔25
✔✔TMRR, unless it is an emergency, if mold remediation activities began on a date
earlier than what was originally notified for, the DSHS shall be provided with a written
notice at least_______working days before the start of work. - ✔✔5
✔✔TMRR, notification fee for a commercial building is: - ✔✔$100
✔✔TMRR, an applicant for an initial license must submit the complete application to the
department within ______ of passing the required state licensing exam. - ✔✔6 months
✔✔TMRR, a critical violation ( Level 1) assessed by DSHS can carry a fine up to
________ per violation. - ✔✔$5000
✔✔TMRR, a mold assessment technician is licensed to: - ✔✔1. Record visual
observation and onsite measurements
2. Collect samples for mold analysis.
3. Prepare a mold assessment report
4.As directed by on-site assessment consultant, collect samples during post
remediation
✔✔A document prepared by the DSHS that describes the persons who are requires to
be licensed and how to file a complaint is called: - ✔✔CMIS Consumer Mold Information
Sheet
✔✔Mold does not cause: - ✔✔Heart attacks
✔✔The most important indoor allergenic molds are: - ✔✔Penicillium and Aspergillus
AND ANSWERS SET A+
✔✔What is the primary factor that controls mold growth indoors? - ✔✔Availability of
moisture
✔✔The bulletin " A Brief Guide to Mold in the Workplace" directed towards building
managers, custodians and other responsible for building maintenance was release by: -
✔✔OSHA
✔✔A document prepared by the DSHS that describes who are requires to be licensed
and how to file a complaint is called: - ✔✔Consumer Mold Information Sheet- CMIS
✔✔What is NOT true when remediating an area of 25 sq ft or more: - ✔✔Personal
protective equipment is NOT required.
✔✔The minimum type of respirator required for mold remediation is : - ✔✔N-95
disposable
✔✔If you are using a biocide such as chlorine bleach you should not use gloves made
from: - ✔✔Cotton
✔✔HVAC filters should have a __________ rating to catch mold spores. - ✔✔MERV 8
✔✔Gloves, N-95 or half face respirator with HEPA filter, disposable overalls,
googles/eye protection are requirements for ________ personal protective equipment: -
✔✔Limited
✔✔Porous materials that are wet and have mold growing on them may have to
be___________. - ✔✔Discarded
,✔✔When using biocides, you should - ✔✔Always ventilate area, Use PPE, Follow label
instructions
✔✔TMRR, Start date is defines as: - ✔✔The date on which actual remediation of mold
begins.
✔✔TMRR, a person is NOT required to be licensed to perform mold remediation in an
area in which the mold contamination affects a total surface area of less than: - ✔✔25
contiguous sq ft.
✔✔TMRR, which of the following is NOT required to be licensed to perform mold
assessment or remediation while being supervised by a license holder: - ✔✔Mold
Remediation Worker
✔✔TMRR, a licensed person or company must maintain an office: - ✔✔In Texas
✔✔TMRR, persons required to have insurance must, at a minimum, obtain policies for
commercial general liability insurance in the amount of NOT less than
_______________ per occurrence. - ✔✔1 million
✔✔TMRR, A Mold Assessment Company must: - ✔✔Employ at least one licensed mold
assessment consultant, Maintain an office in Texas, Maintain commercial general
liability insurance.
✔✔TMRR, mold is defined as: - ✔✔1. Fungi
✔✔TMRR, a credential is: - ✔✔A license
✔✔TMRR, which document does the clearance criteria for a remediation project
appear? - ✔✔The mold remediation protocol
✔✔TMRR, all individual licensees and registrants shall receive refresher training every:
- ✔✔2 Years
✔✔TMRR, the purpose of a mold assessment - ✔✔A. To determine the sources,
locations and extent of mold growth in a building.
✔✔TMRR, signs advising that a mold remediation project is in progress shall: - ✔✔1. Be
displayed at all entrances to remediation areas adjacent to occupied areas of a building
2. Be at least 8x10 inches in size.
3. Bear the words "Notice: Mold remediation project in progress.
✔✔Skipped - ✔✔Skipped
, ✔✔TMRR, the purpose of a mold analysis is: - ✔✔c. Identifying or determining the
amount or presence of any fungal products, including but NOT limited to mycotoxins,
and fungal volatile organic compounds.
✔✔TMRR, working day is defined as: - ✔✔Monday through Friday, including holidays.
✔✔TMRR, biocides and antimicrobial coatings may be used only if: - ✔✔1. Their use is
specified in a mold remediation protocol.
2. They are registered by the EPA for the intended use.
3. Their use is consistent w/ the manufacturers labeling instruction.
✔✔TMRR, a mold remediation contractor or company shall notify the DSHS of a mold
remediation project when mold contamination affects a total surface area of _________
cont. Sq ft or more. - ✔✔25
✔✔TMRR, unless it is an emergency, if mold remediation activities began on a date
earlier than what was originally notified for, the DSHS shall be provided with a written
notice at least_______working days before the start of work. - ✔✔5
✔✔TMRR, notification fee for a commercial building is: - ✔✔$100
✔✔TMRR, an applicant for an initial license must submit the complete application to the
department within ______ of passing the required state licensing exam. - ✔✔6 months
✔✔TMRR, a critical violation ( Level 1) assessed by DSHS can carry a fine up to
________ per violation. - ✔✔$5000
✔✔TMRR, a mold assessment technician is licensed to: - ✔✔1. Record visual
observation and onsite measurements
2. Collect samples for mold analysis.
3. Prepare a mold assessment report
4.As directed by on-site assessment consultant, collect samples during post
remediation
✔✔A document prepared by the DSHS that describes the persons who are requires to
be licensed and how to file a complaint is called: - ✔✔CMIS Consumer Mold Information
Sheet
✔✔Mold does not cause: - ✔✔Heart attacks
✔✔The most important indoor allergenic molds are: - ✔✔Penicillium and Aspergillus